Machine Report
Machine Report
Sr.No. Machinary Start Time End Time Restart End Time Total Hours
r Night Shift.
Ch.10+040---- 10+100 Rolling
r Night Shift.
full Night.
Tetrapod shifting Access road 10
r Night Shift.
(1) Ch.10+040 to 10+100 Rolling
full Night.
PRODUCTION REPORT FOR NIGHT SHIFT 28/05/201
Sr.No. Machinary Start Time End Time Restart End Time Total Hours
r Night Shift.
(1) Ch.10+040 to 10+100 (2)10+100 to
10+150, Near.Bay bridge Rolling
full Night.
r Night Shift.
full Night.
(1) shutter plate fix@gate No.1, Pipe fixing
@ gate no.2, Tetrapod shifting@ 10+040
full Night.
4.3
PRODUCTION REPORT FOR NIGHT SHIFT 02/06/201
Sr.No. Machinary Start Time End Time Restart End Time Total Hours
4 Doosan Exc. IDLE Replaced 7mtr. Short Boom to 21 mtr. Long Boom. Now ready
5 Sany 1 IDLE 4:00 6:00 2:00
0
RT FOR NIGHT SHIFT 02/06/2019
Work Description Layer/ Level AREA (m2) Chainage
Ch.10+240---330 dozing
r Night Shift.
full Night.