THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
MAS
SSK
ISSUED FOR 90% REVIEW
DESCRIPTION
BI-10-02172
01/29/19 10-02172
DISCIPLINE
ENGINEER
SSK
FOR HYDROPROCESSING EQUIPMENT
01/29/2019
DATE:
PROJECT
ENGINEER
RAK
DATE:
01/29/2019 ISSUED FOR 90% REVIEW
CERTIFIED
MAS
01/29/2019
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
PREPARED BY:
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
January 2019
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. BI-10-02118-0001
FIXED WATER SPRAY HYDRAULIC CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
TABLE OF CONTENTS
ENGG CERT
MAS
1. INTRODUCTION .................................................................................................................. 3
SSK
01/29/19 10-02172
DISCIPLINE
ENGINEER
5.2 Summary of Hydraulic Calculations .................................................................................................. 6
SSK
DATE:
01/29/2019 6. ATTACHMENTS .................................................................................................................. 6
PROJECT
ENGINEER
RAK
01/29/2019
DATE:
CERTIFIED
MAS
01/29/2019
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. BI-10-02118-0001
FIXED WATER SPRAY HYDRAULIC CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
1. INTRODUCTION
ENGG CERT
MAS
This document presents hydraulic calculations for fixed water spray systems of Package-2
hydroprocessing equipment being protected and located in high risk process areas such as Process
SSK
2. FACILITY DESCRIPTION
ISSUED FOR 90% REVIEW
The Hydroprocessing facilities installed at Riyadh Refinery during 1979 include a Hydrocracker,
Kerosene Hydrotreaters and Naphtha Hydrotreaters, Platformer and Hydrogen Reformer
processing units.
DESCRIPTION
For continuous operation, these units are essential for Riyadh Refinery. Therefore, the scope of the
project is to replace existing hydroprocessing units with new in kind in compliance with current
company standards. The units that are replaced at various process risk areas under Package-2 of
project scope:
01/29/19 10-02172
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. BI-10-02118-0001
FIXED WATER SPRAY HYDRAULIC CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
MAS
NFPA 25 Standard for the inspection, Testing, and Maintenance of water-based fire protection
systems
DESCRIPTION
The fire water demand and hydraulic calculations shall be carried out as per “December 2018" issue of
the following Saudi Aramco Engineering Standards and Specifications includes the following:
JO/EWO
01/29/19 10-02172
DATE:
01/29/2019 4.1 Fixed Water Spray System
CONSTRUCTION
AGENCY
Water spray application systems can be used to control fire spread or to provide cooling of radiation
exposed facilities and, in certain circumstances, can extinguish fires. A fire water density of 0.25 gpm/ft²
DATE:
OPERATIONS of the protected area shall be used in calculating fire water demand.
Per SAES-B-017 section 10.2.3, the maximum fire water flow rate through single spray system
DATE:
protecting more than one equipment within the same risk process area shall not exceed 2500 gpm
CONTROL NUMBER
VERIFICATION
(158 L/s).
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
(SAES-B-017, sec.10.2.1)
(DCC) NO. BI-10-02118-0001
FIXED WATER SPRAY HYDRAULIC CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
• Max. vertical distance of lowest spray ring
above normal liquid level – 3.7 m (SAES-B-017, sec.10.7.3)
ENGG CERT
MAS
• Max. vertical & horizontal space between nozzles –3m (NFPA-15 section 7.1.8)
• Nozzle K-factor – 4.48 (HD Fire Protect, Model MV-A)
• Nozzle spray angle – 120° (HD Fire Protect, Model MV-A)
• Nozzle axial distance from plane of protection – 600 mm (HD Fire Protect, Model MV-A)
ISSUED FOR 90% REVIEW
• Nozzle radial distance for the given spray angle – 1000 mm (HD Fire Protect, Model MV-A)
and axial distance
DESCRIPTION
• For aboveground pipe size 2” and smaller – Schedule 40, ASTM A53, ASTM A106 or API 5L
Gr. B hot dipped galvanized seamless carbon steel pipe 1CG0U with threaded ends with
galvanized malleable–iron threaded fittings, Class 150, ASME B16.3.
• For aboveground pipe size 3” and above – FBE lined Schedule 40, seamless carbon steel
pipe 1LE0U with welded flanged ends and welded fittings, Class 150 FF ASME B16.5, flange
rating ASME B31.3.
•
JO/EWO
01/29/19 10-02172
For underground piping: Cement lined carbon steel welded ASTM A106 or API SPEC 5L,
Cement-lined per 01-SAMSS-005, fittings, 02-SAMSS-005 / ASME B16.9, flanges Class 150
FF, 02-SAMSS-011.
DATE
•
4.2 Fire Flow Test Reports
NO.
REV
DISCIPLINE Fire water flow test report conducted no more than 12 months prior to working plan submittal shall be
ENGINEER
SSK used for system design, unless otherwise approved by the authority having jurisdiction. Refer to
DATE:
01/29/2019 Appendix-II for fire flow test reports.
PROJECT
ENGINEER
RAK • Firewater flow test of hydrant FHY-G-03, FHY-F-01 & FHY-F-02 conducted by Saudi Aramco
01/29/2019
DATE: FrPD at Area G in Riyadh Refinery, dated Jun 06, 2017 is as follows:
CERTIFIED
MAS
01/29/2019
o Test Static Pressure: 146 psi
DATE:
o Total Residual Pressure: 100 psi
CONSTRUCTION
AGENCY o Test Flow: 12153 gpm
DATE:
• Firewater flow test of hydrant FHY-E-02, FHY-E-04 & FHY-E-14 conducted by Saudi Aramco
OPERATIONS
FrPD at Area E in Riyadh Refinery, dated August 08, 2017 is as follows:
DATE:
o Test Static Pressure: 162 psi
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
_____________________
(DCC) NO. BI-10-02118-0001
FIXED WATER SPRAY HYDRAULIC CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
5. FIXED WATER SPRAY SYSTEM HYDRAULIC CALCULATIONS
ENGG CERT
MAS
All fire protection fixed water spray systems are tie-in to the existing fire water network at various
locations. Therefore, hydraulic calculations are performed for each water spray system using Saudi
SSK
Aramco approved “Elite Fire Sprinkler Hydraulics Version 6.02.30” software for the given process
equipment. The Pressure-drop calculations are based upon Hazen-Williams formula. Refer to
Appendix-I for detailed hydraulic calculation reports.
Per SAES-B-017 para. 5.20.3 and NFPA-15 Table 8.5.3.10, the following friction loss coefficient factors
are used in hydraulic calculations.
DESCRIPTION
01/29/19 10-02172
(gpm)
B
DISCIPLINE
Z14-V-4A/B, Z14-V-5A,
ENGINEER Z51-XV-5263 6” 55 1357.6 77.93
SSK Z14-E-6A, Z14-E-7
DATE:
01/29/2019 Area-C&D Z14-V-4C/D, Z14-V-5B,
PROJECT
ENGINEER
Z14-E-6B, Z14-E-15, Z51-XV-5264 8” 72 1802.1 68.98
RAK Z14-V-7
01/29/2019 Z20-V-1, Z20-E-
DATE: Z51-XV-5153 6” 51 1287.6 69.25
CERTIFIED 1C/D/E/F
MAS Area-E&F Z29-V-2, Z29-E-
DATE:
01/29/2019 1A/B/C/D & Z29-E- Z51-XV-5154 6” 69 1681.4 83.93
CONSTRUCTION 2A/B/C/D
AGENCY
Z12-E-
2A1/2A2/2A3/2A4/2A5/2 Z51-XV-5162 8” 84 2004.7 63.97
DATE:
A6
OPERATIONS Area-G
Z12-E-
2B1/2B2/2B3/2B4/2B5/2 Z51-XV-5163 8” 84 2004.7 69.01
DATE: B6
CONTROL NUMBER
VERIFICATION
6. ATTACHMENTS
EDSD
• Appendix –I
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
•
THIS INDICATES THAT REV. NO.__________
FIXED WATER SPRAY HYDRAULIC CALCULATIONS DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
7 of 342
AREA-D
8 of 342
UPGRADE HYDROPROCESSING INTEGRITY-RR
Fire Sprinkler Reports
for
SAUDI ARAMCO
Prepared By:
JACOBS ZATE
JACOBS ZATE
ALKHOBAR
SAUDI ARABIA
JANUARY 2019
9 of 342
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 2
General Data
Project Title: UPGRADE HYDROPROCESSING Z14 Reactors & Exchangers - Train
Project File Name:
INTEGRITY-RR A-latest..fiw
Designed By: JACOBS ZATE Date: JANUARY 2019
Code Reference: NFPA 15, API 2030 & SAES-B-017 Approving Agency: SAUDI ARAMCO
Job Number: BI-10-02172-0001
Client Name: SAUDI ARAMCO Phone: SAUDI ARABIA
Address: Z14-V-4A/B, V-5A, Z14-E-6A/7 (XV-
City, State Zip Code: RIYADH REFINERY
5263)
Company Name: JACOBS ZATE Representative:
Company Address: ALKHOBAR City And State: SAUDI ARABIA
Phone:
Job Number: BI-10-02172-0001
Building Name: Z14-V-4A/B, Z14-V-5A, Z14-E-6A,
Building Owner: SAUDI ARAMCO
Z14-E-7
Contact at Building: RIYADH REFINERY Phone at Building:
Address Of Building: AREA F City, State Zip Code: RIYADH
Project Data
Description Of Hazard: HIGH RISK AREA Sprinkler System Type: Dry
Design Area Of Water Application: 2386 ft² Maximum Area Per Sprinkler: 76 ft²
Default Sprinkler K-Factor: 4.48 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: HD FIRE PROTECT Model: MV-A
Size: 1/2" Temperature Rating: 100 F
WATER SPRAY NOZZLES
10 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 3
11 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 4
12 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 5
13 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 6
14 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 7
15 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 8
16 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 9
17 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 10
18 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 11
19 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 12
51 106 SCHED 40 WET STEEL 1.000 0 F2E 2.62 5.00 7.62 120
52 107 SCHED 40 WET STEEL 1.000 0 F2E 3.30 5.00 8.30 120
20 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 13
61 111 SCHED 40 WET STEEL 2.000 0 5ET 15.00 35.00 50.00 120
21 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 14
100 101 SCHED 40 WET STEEL 2.000 0 2FT 7.50 14.00 21.50 120
22 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 15
102 103 SCHED 40 WET STEEL 2.000 0 FT 6.50 12.00 18.50 120
103 104 SCHED 40 WET STEEL 2.000 0 2FT 4.75 14.00 18.75 120
104 105 SCHED 40 WET STEEL 2.000 0 FT 5.65 12.00 17.65 120
105 106 SCHED 40 WET STEEL 2.000 0 T 2.25 10.00 12.25 120
106 120 SCHED 40 WET STEEL 2.000 0 FT 2.70 12.00 14.70 120
107 121 SCHED 40 WET STEEL 2.000 0 F 5.75 2.00 7.75 120
107 108 SCHED 40 WET STEEL 2.000 0 2FT 8.10 14.00 22.10 120
108 109 SCHED 40 WET STEEL 2.000 0 2FT 8.10 14.00 22.10 120
109 110 SCHED 40 WET STEEL 2.000 0 2FT 8.10 14.00 22.10 120
110 121 SCHED 40 WET STEEL 2.000 0 FT 3.00 12.00 15.00 120
23 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 16
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
24 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 17
25 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 18
26 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 19
27 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 20
28 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 21
29 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 22
30 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 23
31 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 24
32 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 25
33 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 26
34 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 27
35 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 28
36 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 29
37 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 30
38 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 31
100 0.00 16.00 0.00 31.43 2.00 0.00 0.02889 7.50 0.621
101 0.00 16.00 0.00 30.81 2.067 52.85 2FT 14.00 0.000
SCHED 40 WET STEEL 120 5.05 0 21.50 0.621
101 0.00 16.00 0.00 30.81 2.00 0.00 0.00934 2.00 0.019
102 0.00 16.00 0.00 30.79 2.067 28.70 ----- 0.00 0.000
SCHED 40 WET STEEL 120 2.74 0 2.00 0.019
102 0.00 16.00 0.00 30.79 2.00 5.71 0.00047 6.50 0.009
103 0.00 16.00 0.00 30.78 2.067 5.71 FT 12.00 0.000
SCHED 40 WET STEEL 120 0.55 0 18.50 0.009
103 0.00 16.00 0.00 30.78 2.00 18.81 0.00427 4.75 0.080
104 0.00 16.00 0.00 30.86 2.067 18.81 2FT 14.00 0.000
SCHED 40 WET STEEL 120 1.80 0 18.75 0.080
39 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 32
104 0.00 16.00 0.00 30.86 2.00 0.00 0.01878 5.65 0.331
105 0.00 16.00 0.00 31.19 2.067 41.87 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.00 0 17.65 0.331
105 0.00 16.00 0.00 31.19 2.00 0.00 0.04244 2.25 0.520
106 0.00 16.00 0.00 31.71 2.067 65.06 T 10.00 0.000
SCHED 40 WET STEEL 120 6.22 0 12.25 0.520
107 0.00 12.00 0.00 34.72 2.00 0.00 0.01007 8.10 0.222
108 0.00 12.00 0.00 34.50 2.067 29.89 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.86 0 22.10 0.222
108 0.00 12.00 0.00 34.50 2.00 4.15 0.00026 8.10 0.006
109 0.00 12.00 0.00 34.50 2.067 4.15 2FT 14.00 0.000
SCHED 40 WET STEEL 120 0.40 0 22.10 0.006
109 0.00 12.00 0.00 34.50 2.00 21.58 0.00551 8.10 0.122
110 0.00 12.00 0.00 34.62 2.067 21.58 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.06 0 22.10 0.122
111 0.00 12.60 0.00 38.96 4.00 0.00 0.01850 4.50 0.513
114 0.00 12.60 0.00 38.45 4.026 260.19 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 6.56 0 27.70 0.513
LINED
40 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 33
112 0.00 10.30 0.00 35.24 3.00 0.00 0.03584 11.00 1.309
113 0.00 10.30 0.00 36.55 3.068 181.91 ET 25.52 0.000
SCHED 40 WET STEEL FBE
130 7.89 0 36.52 1.309
LINED
113 0.00 10.30 0.00 36.55 3.00 0.00 0.06950 8.00 2.894
114 0.00 12.60 0.00 38.45 3.068 260.19 2ET 33.64 -0.996
SCHED 40 WET STEEL FBE
130 11.29 0 41.64 1.898
LINED
41 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 34
106 0.00 16.00 0.00 31.71 2.00 0.00 0.07678 2.70 1.129
120 0.00 16.00 0.00 32.84 2.067 89.63 FT 12.00 0.000
SCHED 40 WET STEEL 120 8.57 0 14.70 1.129
107 0.00 12.00 0.00 34.72 2.00 0.00 0.03193 5.75 0.247
121 0.00 12.00 0.00 34.97 2.067 55.78 F 2.00 0.000
SCHED 40 WET STEEL 120 5.33 0 7.75 0.247
110 0.00 12.00 0.00 34.62 2.00 0.00 0.02359 3.00 0.354
121 0.00 12.00 0.00 34.97 2.067 47.36 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.53 0 15.00 0.354
111 0.00 12.60 0.00 38.96 4.00 0.00 0.04080 45.00 4.203
122 0.00 25.00 0.00 37.79 4.026 398.97 3ET 58.00 -5.369
SCHED 40 WET STEEL FBE
130 10.06 0 103.00 -1.166
LINED
116 0.00 18.00 0.00 31.02 3.00 0.00 0.01666 1.50 0.315
123 0.00 18.00 0.00 31.34 3.068 120.23 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 5.22 0 18.90 0.315
LINED
117 0.00 12.00 0.00 33.43 3.00 0.00 0.01775 7.25 0.500
123 0.00 18.00 0.00 31.34 3.068 124.41 FT 20.90 -2.598
SCHED 40 WET STEEL FBE
130 5.40 0 28.15 -2.098
LINED
115 0.00 24.00 0.00 29.45 3.00 0.00 0.01592 6.22 0.432
124 0.00 19.00 0.00 32.04 3.068 117.32 FT 20.90 2.165
SCHED 40 WET STEEL FBE
130 5.09 0 27.12 2.597
LINED
42 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 35
123 0.00 18.00 0.00 31.34 3.00 0.00 0.06201 1.00 1.141
124 0.00 19.00 0.00 32.04 3.068 244.64 T 17.40 -0.433
SCHED 40 WET STEEL FBE
130 10.62 0 18.40 0.708
LINED
124 0.00 19.00 0.00 32.04 3.00 0.00 0.12801 4.10 3.792
125 0.00 16.40 0.00 36.96 3.068 361.96 ET 25.52 1.126
SCHED 40 WET STEEL FBE
130 15.71 0 29.62 4.917
LINED
118 0.00 16.00 0.00 34.32 3.00 0.00 0.02414 3.50 0.504
126 0.00 16.00 0.00 34.83 3.068 146.91 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 6.38 0 20.90 0.504
LINED
119 0.00 12.00 0.00 36.14 3.00 0.00 0.01270 7.50 0.419
126 0.00 16.00 0.00 34.83 3.068 103.81 ET 25.52 -1.732
SCHED 40 WET STEEL FBE
130 4.51 0 33.02 -1.313
LINED
120 0.00 16.00 0.00 32.84 3.00 0.00 0.03902 3.50 0.815
127 0.00 16.00 0.00 33.65 3.068 190.45 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 8.27 0 20.90 0.815
LINED
121 0.00 12.00 0.00 34.97 3.00 0.00 0.01255 7.50 0.414
127 0.00 16.00 0.00 33.65 3.068 103.15 ET 25.52 -1.732
SCHED 40 WET STEEL FBE
130 4.48 0 33.02 -1.318
LINED
126 0.00 16.00 0.00 34.83 3.00 0.00 0.06489 7.60 2.149
128 0.00 19.20 0.00 35.59 3.068 250.72 ET 25.52 -1.386
SCHED 40 WET STEEL FBE
130 10.88 0 33.12 0.764
LINED
127 0.00 16.00 0.00 33.65 3.00 0.00 0.08690 12.70 3.321
128 0.00 19.20 0.00 35.59 3.068 293.60 ET 25.52 -1.386
SCHED 40 WET STEEL FBE
130 12.74 0 38.22 1.936
LINED
125 0.00 16.40 0.00 36.96 6.00 0.00 0.00463 11.10 0.213
129 0.00 16.40 0.00 37.17 6.065 361.96 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 4.02 0 45.90 0.213
LINED
128 0.00 19.20 0.00 35.59 6.00 0.00 0.00986 3.00 0.373
129 0.00 16.40 0.00 37.17 6.065 544.31 T 34.80 1.212
SCHED 40 WET STEEL FBE
130 6.04 0 37.80 1.585
LINED
43 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 36
122 0.00 25.00 0.00 37.79 4.00 0.00 0.04080 45.00 3.162
130 0.00 25.00 0.00 40.95 4.026 398.97 2FT 32.48 0.000
SCHED 40 WET STEEL FBE
130 10.06 0 77.48 3.162
LINED
130 0.00 25.00 0.00 40.95 6.00 0.00 0.05346 231.00 23.326
131 0.00 0.00 0.00 75.10 6.065 1357.58 8ETGC 205.34 10.825
SCHED 40 WET STEEL FBE
130 15.08 0 436.34 34.151
LINED
131 0.00 0.00 0.00 75.10 6.00 0.00 0.05346 10.00 1.401
132 0.00 -3.30 0.00 77.93 6.065 1357.58 E 16.20 1.429
SCHED 40 WET STEEL CEMENT
130 15.08 0 26.20 2.829
LINE
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
44 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 37
45 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 38
46 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 39
47 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 40
48 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 41
Sprinkler Summary
Sprinkler System Type: Dry
Specified Area Of Application: 2386.00 ft²
Adjusted Area Of Application: 3101.80 ft²
Minimum Desired Density: 0.250 gpm/ft²
Application Average Density: 0.569 gpm/ft²
Application Adjusted Density (not required by NFPA 13): 0.438 gpm/ft²
Application Average Area Per Sprinkler: 43.38 ft²
Adjusted Area Per Sprinkler (not required by NFPA 13): 56.40 ft²
Sprinkler Flow: 1357.58 gpm
Average Sprinkler Flow: 24.68 gpm
49 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 42
200
180
160 152
140
Pressure psi
120
100
100
80
60
40
40
20
0
20 40 60 80 100 120 140 160 180 200
Flowrate(x100) gpm
50 of 342
C:\ ...\Z14 Reactors & Exchangers - Train A-latest.fiw Tuesday, January 15, 2019, 8:27 AM
220
350
1" NPD
173
19
0
2
2
1" NPD
EL. 7156
151 363
340 2073
17 74
171
72
0
7
1" NPD
2
Z14-V-5A
75
1748
2
6
8
EL. 6979
20
1" NPD
6
9 0
1" NPD
76 14 5
0
1" NPD
73
240
970
115 5
2
2
15
700 0
2" NPD 2" NPD
3"x2"
537 3"x2" 885
21
3
220
2
1
18 56
D
16
NP
4
0
0
45
3"
1 0
2 0
5
1" NPD
3
1
240
E
L
.7
15
6
220
3" NPD
1441
57 15
0
0
124
220
0
3 0
5
1" NPD
350
"
N
P
D
240
1" NPD
2
173
0
24
2
2
1" NPD
EL. 5406
151 475
220
340 1918
22 79 58
15
171 0
0
77
2
8
1" NPD
0
3
0
5
1" NPD
240
Z14-V-5A 80 3
1748
4
0
10
EL. 5229
220
25 Z14-E-7 59 0
1" NPD
2
6
14 .2
6 0 L
E
81 9 0
1" NPD
13
78
970 116 2
0
0
0
5
1" NPD
4
6
5
0
240
700 2" NPD 2" NPD
4
3"x2"
4
537 3"x2" 1026 26 6
6
3
2
1
650
23
D
3" 4
220
NP
45
E
L
60
.5 7
3" NPD
7 5
0 0
309
15 3
0
1 .3
2 2 L
3 " E
N
P
3" NPD
D
E
766
L
.2
4
0
0
123 E
L
.5 0
4
0
6
5 E
L
.2
2
3
0 5
0
3
8 .3
3" NPD
0 L
E
61
1750
0
0
2
200
2
5
0
0
6
7
2
8
3
220
350
E
L
.3
1" NPD
13
173
0
E EL. 3656 5
L 7
.5 6
29 .4
30
8
0
4
D
4 L 7
2
E 2
P
0
0
1" NPD
2
E D
N
340 P
7
7 L N
3
.3
1"
4
2" NPD
9 "
2
17
.4
8 10
1352
454 5
151 441 L 4 14
0
E
4
172 2 D EL. 2750
652 7 P
2 N
27 " 4
6
272
84 6 0
0 0
172
614 0
2
3" NPD
62
1074
4
"
171
82 2
3
9
3
8
16
5
0
11
N
P
D
5 5
0
624
30
D
1
P
17
1" NPD
0
N
3
0
3
1"
9
7
374
17
7 E
6
L
0
.4 .3
8 114
0
L 13
E
Z14-V-5A 85
4
125 0
P
D
2
0 "
N
6
15
8
202
2 2
E
2 0 E
126 0 2 L 2
L
0
6
4 10 .1 "
63
0
10 9 x1
6
5
65
8
"
4
0
11
0
154
33
3
EL. 3479
0
2"
x1 246
" 4
1" NPD
1027
220 5 2
3 8 2
450
"
Z14-E-6A 0 .3 0
35 N
374
P 5 L
12
30
1" NPD
D 14 E
277
3
5
2
86 9
6 EL. 2900 "
N 0 111
1" NPD
P 0
451 13 220 2 D 5
220 0
8
83 0
0
202
155 4
10 D
0
P 620
4407
2
N
117
2
"
10
2
2"
x1 3 0
22
2" NPD
" 2
4
330
66
1357
3"x2"
2 5
5 9
1" NPD
N 3 7
P
31 246 14
0
D
1" NPD
3 0
3" NPD
2
30
1
450
D
325 2" NPD 874 3
P
4
724
28 0
N
239 0
3
1"
222 0
D
5
17
9
0
"
NP
8
4
x2
5
0
"
9
15
220
45
11
4
88 87 3
3"
"
"x2
3" NPD
2
1250
3 0
220 0
1" NPD
0
34 14
202
4 D 8
118
5
0
2
1
6
"
N
P
64 2
0
13
0
3
6
1 "
N .3
7 P L
D E
0
0
6
"x3
"
13 2
E
L
220
67 .3
3
8
410
D
17
350 " 5
3
4
NP
E
x3 7
9
" L 6
.3
.5
4
6 246
1"
128
6
5 E
L
113
1" NPD
6 E
5 L
Z14-E-6A .8
450
11 5
5 2
2
0 7
5 2 112 6
1
89
1" NPD
2 0 "
92 2 0 N 0
237
9 6 P 0 2
D 0
Z14-V-4A .4
9
220
2
4
.7
5
L
37 12 L
4" NPD
E E
759
489
1029
9
5 2
5
14 4
0
3 4
" 3
6" NPD
N
P
897
D
3
"
N .3
3
0 68
90 0
36 2
8
10
P
D E
L
2" NPD
2
2
16
1130
443
0 0
1" NPD
0 2 0
10 2 0
0 .2
202
0 L
2 2 E
15 5 "
7 .3 x1
7
E
L "
4 122
4
7 71 15
17 17
370
1
17
2" NPD 4
1 0
91 998 9
0
14
E
43 129 L
.5 9 350
4
8 2
5
9
4
4
5
E
L 2
.6 "
3 N
5 P
0 22 D
1" NPD
0
8 0 3 8
2
237
4 D 5
10 D N
P 0 .1
P " L
N 6 E
220 " 3
3
204
2
17
394
1" NPD
173
0
38 3
3
0
202
2
69
2
3" NPD
7
1054
719 5
2" NPD
0 11
326 2 0 2 6
" 5
9
8 "
x1 10 2
2
" 4
5
"x2
93
2" NPD
3
"
x2
970
"
3 0
2
202
2
15
119
4
5
0 50 0
2
45 2
950
2"
x1"
277
719
1027
220 0
47 .6
3
5
0
1" NPD
640 L 0
10
277
98 E 0
237
9
7
.4
L
E
451
1" NPD
220 220
202
55
42
1" NPD
202
0
127
2
2
2
2"
x1
22
2" NPD
E "
Z14-V-4A L
.6
2" NPD
1357
96 2"
330
3 x1
94 EL. 3300
5
0 22
0
"
70
2" NPD
0
1" NPD
44
1210
0
202
7
D
P
N
8 "
4 2
10
41
204
719
0 N 239
620 " 222
6 10 "
3 0
1" NPD
2
x2
5
9 9 3
17
202
" .3
100
15
3
2
" 3
6 99 3
"x2
" E
L
x1
" 220 14
1591
2" NPD
4
0
120
970
7
14
14
3
6
46
3
95
1" NPD
6
506 220
2
3
410
D
9
17
3
9
NP
2" NPD 11 5
.4
9
2 2
11
4
719 719 L 5
1"
E
101
3" NPD
1256
97 49 0
2
220 2
Z14-V-4B 106
40 489 51
683
277
202
220
2"
x1"
102 48 105
345
0
2" NPD
2
1210
2
313
1" NPD
202
16
6
8 0
8
13
17
11 17
1 5
7
2
2" NPD
103 998 104
4
3
5
.3
L
E
220
394
1" NPD
173
52 4
8
0
10 D
2
P
N
2
"
3
2" NPD
509 719
10 "
2
9 x2
107 3
"
"
6 "x2
3 3
14
4
0
7
121
509
508
1" NPD
1" NPD
Z14-V-4B
108 110 EL. 3300
8
0 53 55
3337
5
0
509
508
3
5
2
8
E 6
L
9
.4 14 3
109 14
4
2 9 3
5 4 6
3 7
2" NPD
5 508 509
1" NPD
9
4
2
6
"
N
6 P
8 D
7
5
54
D
P
N
" 0
4 5
6
7
E
L
.8
2
8
4
6" NPD
782
6
"x4
"
130
D
P
N
" 0
6 0
10
4
2
0
5
.7
L
E
1378
6
"
N
6 P
8 D
7
5
E
L
.6
12 6
0 "
4 5 N
10 P
17 D
1069
8
0
0
E
L
.5
0
5
5
4171
6
"
N
D 3 P
V D
4
A
/G
U
/G
131
987
E D
L P
.- N
9 "
8 6 0
7 7
0
2
5
8
5 -A
IN
A
R
T
TIE-IN
8
132 16
0
0
IN
-B
" A
N R D
P T P
D N
"
6
5
8
5
E
L
.-
9
TIE-IN 8
7
51 of 342
UPGRADE HYDROPROCESSING INTEGRITY-RR
Fire Sprinkler Reports
for
SAUDI ARAMCO
Prepared By:
JACOBS ZATE
JACOBS ZATE
ALKHOBAR
SAUDI ARABIA
JANUARY 2018
52 of 342
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 2
General Data
Project Title: UPGRADE HYDROPROCESSING Z14 Reactors & Exchangers - Train
Project File Name:
INTEGRITY-RR B..fiw
Designed By: JACOBS ZATE Date: JANUARY 2018
Code Reference: NFPA 15, API 2030 & SAES-B-017 Approving Agency: SAUDI ARAMCO
Job Number: BI-10-02172-0001
Client Name: SAUDI ARAMCO Phone: SAUDI ARABIA
Address: Z14-V-4C/D,V-5B/7, Z14-E-6B/15
City, State Zip Code: RIYADH REFINERY
(XV-5264)
Company Name: JACOBS ZATE Representative:
Company Address: ALKHOBAR City And State: SAUDI ARABIA
Phone:
Job Number: BI-10-02172-0001
Building Name: Z14-V-4C/D, Z14-V-5B/7, Z14-E-
Building Owner: SAUDI ARAMCO
6B/15
Contact at Building: RIYADH REFINERY Phone at Building:
Address Of Building: AREA F City, State Zip Code: RIYADH
Project Data
Description Of Hazard: HIGH RISK AREA Sprinkler System Type: Dry
Design Area Of Water Application: 2975 ft² Maximum Area Per Sprinkler: 76 ft²
Default Sprinkler K-Factor: 4.48 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: HD FIRE PROTECT Model: MV-A
Size: 1/2" Temperature Rating: 100 F
WATER SPRAY NOZZLES
53 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 3
54 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 4
55 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 5
56 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 6
57 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 7
58 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 8
59 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 9
60 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 10
61 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 11
62 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 12
63 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 13
64 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 14
65 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 15
35 107 SCHED 40 WET STEEL 1.000 0 F2E 3.20 5.00 8.20 120
40 112 SCHED 40 WET STEEL 1.000 0 F2E 3.20 5.00 8.20 120
45 117 SCHED 40 WET STEEL 1.000 0 F2E 3.20 5.00 8.20 120
50 122 SCHED 40 WET STEEL 1.000 0 2FE 3.30 4.00 7.30 120
52 124 SCHED 40 WET STEEL 1.000 0 F2E 7.00 5.00 12.00 120
66 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 16
54 126 SCHED 40 WET STEEL 1.000 0 2FE 2.62 4.00 6.62 120
56 128 SCHED 40 WET STEEL 1.000 0 F2E 3.30 5.00 8.30 120
58 130 SCHED 40 WET STEEL 1.000 0 F2E 3.30 5.00 8.30 120
59 131 SCHED 40 WET STEEL 1.000 0 2FE 2.62 4.00 6.62 120
60 132 SCHED 40 WET STEEL 1.000 0 F2E 7.00 5.00 12.00 120
61 133 SCHED 40 WET STEEL 1.000 0 F2E 6.50 5.00 11.50 120
64 136 SCHED 40 WET STEEL 1.000 0 2FE 2.62 4.00 6.62 120
65 137 SCHED 40 WET STEEL 1.000 0 F2E 6.60 5.00 11.60 120
66 138 SCHED 40 WET STEEL 1.000 0 F2E 2.62 5.00 7.62 120
67 139 SCHED 40 WET STEEL 1.000 0 F2E 3.30 5.00 8.30 120
69 141 SCHED 40 WET STEEL 1.000 0 F2E 3.30 5.00 8.30 120
67 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 17
80 145 SCHED 40 WET STEEL 2.000 0 2FET 8.50 19.00 27.50 120
100 101 SCHED 40 WET STEEL 2.000 0 T 9.25 10.00 19.25 120
101 102 SCHED 40 WET STEEL 2.000 0 T 6.60 10.00 16.60 120
102 153 SCHED 40 WET STEEL 2.000 0 T 2.00 10.00 12.00 120
103 104 SCHED 40 WET STEEL 2.000 0 T 8.00 10.00 18.00 120
104 105 SCHED 40 WET STEEL 2.000 0 4ET 11.00 30.00 41.00 120
68 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 18
105 154 SCHED 40 WET STEEL 2.000 0 T 7.00 10.00 17.00 120
106 107 SCHED 40 WET STEEL 2.000 0 2FT 9.50 14.00 23.50 120
107 108 SCHED 40 WET STEEL 2.000 0 FT 8.00 12.00 20.00 120
108 156 SCHED 40 WET STEEL 2.000 0 FT 5.00 12.00 17.00 120
109 110 SCHED 40 WET STEEL 2.000 0 2FT 11.00 14.00 25.00 120
110 156 SCHED 40 WET STEEL 2.000 0 FT 4.10 12.00 16.10 120
111 112 SCHED 40 WET STEEL 2.000 0 2FT 10.00 14.00 24.00 120
112 113 SCHED 40 WET STEEL 2.000 0 FT 8.00 12.00 20.00 120
113 157 SCHED 40 WET STEEL 2.000 0 FT 5.00 12.00 17.00 120
114 115 SCHED 40 WET STEEL 2.000 0 2FT 11.00 14.00 25.00 120
115 157 SCHED 40 WET STEEL 2.000 0 FT 4.10 12.00 16.10 120
116 117 SCHED 40 WET STEEL 2.000 0 5FT 9.50 20.00 29.50 120
117 118 SCHED 40 WET STEEL 2.000 0 FT 8.50 12.00 20.50 120
118 158 SCHED 40 WET STEEL 2.000 0 FT 5.00 12.00 17.00 120
119 120 SCHED 40 WET STEEL 2.000 0 F4ET 13.10 32.00 45.10 120
120 158 SCHED 40 WET STEEL 2.000 0 FT 4.10 12.00 16.10 120
121 122 SCHED 40 WET STEEL 2.000 0 T 2.00 10.00 12.00 120
122 162 SCHED 40 WET STEEL 2.000 0 FT 6.10 12.00 18.10 120
123 124 SCHED 40 WET STEEL 2.000 0 T 3.00 10.00 13.00 120
124 125 SCHED 40 WET STEEL 2.000 0 FT 7.00 12.00 19.00 120
125 126 SCHED 40 WET STEEL 2.000 0 3FT 13.00 16.00 29.00 120
126 162 SCHED 40 WET STEEL 2.000 0 FT 3.00 12.00 15.00 120
127 163 SCHED 40 WET STEEL 2.000 0 FT 7.00 12.00 19.00 120
128 129 SCHED 40 WET STEEL 2.000 0 2FT 11.20 14.00 25.20 120
129 130 SCHED 40 WET STEEL 2.000 0 2FT 9.50 14.00 23.50 120
130 163 SCHED 40 WET STEEL 2.000 0 FT 4.00 12.00 16.00 120
69 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 19
131 165 SCHED 40 WET STEEL 2.000 0 F 3.00 2.00 5.00 120
131 132 SCHED 40 WET STEEL 2.000 0 T 2.25 10.00 12.25 120
132 133 SCHED 40 WET STEEL 2.000 0 FT 6.00 12.00 18.00 120
133 134 SCHED 40 WET STEEL 2.000 0 2FT 5.00 14.00 19.00 120
134 135 SCHED 40 WET STEEL 2.000 0 FT 7.00 12.00 19.00 120
135 136 SCHED 40 WET STEEL 2.000 0 T 2.00 10.00 12.00 120
136 137 SCHED 40 WET STEEL 2.000 0 2FT 7.50 14.00 21.50 120
137 138 SCHED 40 WET STEEL 2.000 0 T 1.00 10.00 11.00 120
138 165 SCHED 40 WET STEEL 2.000 0 FT 6.25 12.00 18.25 120
139 166 SCHED 40 WET STEEL 2.000 0 F 4.00 2.00 6.00 120
139 140 SCHED 40 WET STEEL 2.000 0 2FT 9.50 14.00 23.50 120
140 141 SCHED 40 WET STEEL 2.000 0 2FT 9.50 14.00 23.50 120
141 142 SCHED 40 WET STEEL 2.000 0 2FT 9.50 14.00 23.50 120
142 166 SCHED 40 WET STEEL 2.000 0 FT 6.00 12.00 18.00 120
70 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 20
71 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 21
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
72 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 22
73 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 23
74 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 24
75 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 25
76 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 26
77 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 27
78 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 28
79 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 29
80 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 30
81 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 31
82 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 32
83 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 33
84 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 34
85 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 35
86 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 36
100 0.00 10.30 0.00 32.68 2.00 0.00 0.00738 9.25 0.142
101 0.00 10.30 0.00 32.82 2.067 25.28 T 10.00 0.000
SCHED 40 WET STEEL 120 2.42 0 19.25 0.142
87 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 37
101 0.00 10.30 0.00 32.82 2.00 0.00 0.02667 6.60 0.443
102 0.00 10.30 0.00 33.26 2.067 50.61 T 10.00 0.000
SCHED 40 WET STEEL 120 4.84 0 16.60 0.443
103 0.00 10.30 0.00 33.09 2.00 0.00 0.00742 8.00 0.134
104 0.00 10.30 0.00 33.22 2.067 25.35 T 10.00 0.000
SCHED 40 WET STEEL 120 2.42 0 18.00 0.134
104 0.00 10.30 0.00 33.22 2.00 0.00 0.02681 11.00 1.099
105 0.00 10.30 0.00 34.32 2.067 50.75 4ET 30.00 0.000
SCHED 40 WET STEEL 120 4.85 0 41.00 1.099
106 0.00 24.00 0.00 29.16 2.00 0.00 0.00655 9.50 0.154
107 0.00 24.00 0.00 29.31 2.067 23.69 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.26 0 23.50 0.154
107 0.00 24.00 0.00 29.31 2.00 0.00 0.02372 8.00 0.474
108 0.00 24.00 0.00 29.79 2.067 47.51 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.54 0 20.00 0.474
88 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 38
109 0.00 24.00 0.00 30.08 2.00 0.00 0.00674 11.00 0.168
110 0.00 24.00 0.00 30.25 2.067 24.06 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.30 0 25.00 0.168
111 0.00 17.70 0.00 30.76 2.00 0.00 0.00683 10.00 0.164
112 0.00 17.70 0.00 30.93 2.067 24.24 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.32 0 24.00 0.164
112 0.00 17.70 0.00 30.93 2.00 0.00 0.02476 8.00 0.495
113 0.00 17.70 0.00 31.42 2.067 48.61 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.65 0 20.00 0.495
114 0.00 17.70 0.00 31.73 2.00 0.00 0.00703 11.00 0.176
115 0.00 17.70 0.00 31.91 2.067 24.62 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.35 0 25.00 0.176
89 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 39
116 0.00 12.00 0.00 32.89 2.00 0.00 0.00726 9.50 0.214
117 0.00 12.00 0.00 33.10 2.067 25.06 5FT 20.00 0.000
SCHED 40 WET STEEL 120 2.40 0 29.50 0.214
117 0.00 12.00 0.00 33.10 2.00 0.00 0.02634 8.50 0.540
118 0.00 12.00 0.00 33.64 2.067 50.27 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.81 0 20.50 0.540
119 0.00 12.00 0.00 33.82 2.00 0.00 0.00746 13.10 0.336
120 0.00 12.00 0.00 34.16 2.067 25.41 F4ET 32.00 0.000
SCHED 40 WET STEEL 120 2.43 0 45.10 0.336
121 0.00 15.60 0.00 35.19 2.00 0.00 0.00706 2.00 0.085
122 0.00 15.60 0.00 35.27 2.067 24.68 T 10.00 0.000
SCHED 40 WET STEEL 120 2.36 0 12.00 0.085
90 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 40
123 0.00 15.60 0.00 32.23 2.00 0.00 0.00725 3.00 0.094
124 0.00 15.60 0.00 32.33 2.067 25.02 T 10.00 0.000
SCHED 40 WET STEEL 120 2.39 0 13.00 0.094
124 0.00 15.60 0.00 32.33 2.00 0.00 0.02481 7.00 0.471
125 0.00 15.60 0.00 32.80 2.067 48.67 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.65 0 19.00 0.471
125 0.00 15.60 0.00 32.80 2.00 0.00 0.05375 13.00 1.559
126 0.00 15.60 0.00 34.36 2.067 73.91 3FT 16.00 0.000
SCHED 40 WET STEEL 120 7.07 0 29.00 1.559
128 0.00 11.50 0.00 35.78 2.00 0.00 0.00789 11.20 0.199
129 0.00 11.50 0.00 35.98 2.067 26.21 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.51 0 25.20 0.199
129 0.00 11.50 0.00 35.98 2.00 0.00 0.02845 9.50 0.669
130 0.00 11.50 0.00 36.65 2.067 52.41 2FT 14.00 0.000
SCHED 40 WET STEEL 120 5.01 0 23.50 0.669
91 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 41
131 0.00 15.70 0.00 33.62 2.00 0.00 0.06450 2.25 0.790
132 0.00 15.70 0.00 32.83 2.067 81.57 T 10.00 0.000
SCHED 40 WET STEEL 120 7.80 0 12.25 0.790
132 0.00 15.70 0.00 32.83 2.00 0.00 0.03400 6.00 0.612
133 0.00 15.70 0.00 32.21 2.067 57.71 FT 12.00 0.000
SCHED 40 WET STEEL 120 5.52 0 18.00 0.612
133 0.00 15.70 0.00 32.21 2.00 0.00 0.01282 5.00 0.243
134 0.00 15.70 0.00 31.97 2.067 34.06 2FT 14.00 0.000
SCHED 40 WET STEEL 120 3.26 0 19.00 0.243
134 0.00 15.70 0.00 31.97 2.00 9.12 0.00112 7.00 0.021
135 0.00 15.70 0.00 31.95 2.067 9.12 FT 12.00 0.000
SCHED 40 WET STEEL 120 0.87 0 19.00 0.021
135 0.00 15.70 0.00 31.95 2.00 14.32 0.00258 2.00 0.031
136 0.00 15.70 0.00 31.98 2.067 14.32 T 10.00 0.000
SCHED 40 WET STEEL 120 1.37 0 12.00 0.031
136 0.00 15.70 0.00 31.98 2.00 0.00 0.01649 7.50 0.355
137 0.00 15.70 0.00 32.34 2.067 39.03 2FT 14.00 0.000
SCHED 40 WET STEEL 120 3.73 0 21.50 0.355
92 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 42
137 0.00 15.70 0.00 32.34 2.00 0.00 0.04058 1.00 0.446
138 0.00 15.70 0.00 32.78 2.067 63.50 T 10.00 0.000
SCHED 40 WET STEEL 120 6.07 0 11.00 0.446
139 0.00 11.50 0.00 36.18 2.00 0.00 0.01194 9.50 0.281
140 0.00 11.50 0.00 35.90 2.067 32.78 2FT 14.00 0.000
SCHED 40 WET STEEL 120 3.13 0 23.50 0.281
140 0.00 11.50 0.00 35.90 2.00 6.61 0.00062 9.50 0.014
141 0.00 11.50 0.00 35.89 2.067 6.61 2FT 14.00 0.000
SCHED 40 WET STEEL 120 0.63 0 23.50 0.014
141 0.00 11.50 0.00 35.89 2.00 19.64 0.00463 9.50 0.109
142 0.00 11.50 0.00 35.99 2.067 19.64 2FT 14.00 0.000
SCHED 40 WET STEEL 120 1.88 0 23.50 0.109
143 0.00 16.20 0.00 40.87 6.00 0.00 0.02768 6.00 1.129
144 0.00 16.20 0.00 39.74 6.065 951.17 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 10.56 0 40.80 1.129
LINED
93 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 43
144 0.00 16.20 0.00 39.74 6.00 0.00 0.02627 6.00 1.072
169 0.00 16.20 0.00 38.67 6.065 924.66 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 10.27 0 40.80 1.072
LINED
145 0.00 9.20 0.00 38.74 3.00 0.00 0.04696 25.00 3.083
146 0.00 15.00 0.00 39.31 3.068 210.51 2F2ET 40.64 -2.511
SCHED 40 WET STEEL FBE
130 9.14 0 65.64 0.571
LINED
148 0.00 17.20 0.00 31.57 3.00 0.00 0.01612 2.00 0.313
150 0.00 19.10 0.00 31.06 3.068 118.12 T 17.40 -0.823
SCHED 40 WET STEEL FBE
130 5.13 0 19.40 -0.510
LINED
94 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 44
149 0.00 21.00 0.00 29.94 3.00 0.00 0.01529 2.00 0.297
150 0.00 19.10 0.00 31.06 3.068 114.78 T 17.40 0.823
SCHED 40 WET STEEL FBE
130 4.98 0 19.40 1.119
LINED
147 0.00 12.10 0.00 35.22 3.00 0.00 0.01795 6.00 0.483
151 0.00 17.50 0.00 33.36 3.068 125.17 FT 20.90 -2.338
SCHED 40 WET STEEL FBE
130 5.43 0 26.90 -1.855
LINED
150 0.00 19.10 0.00 31.06 3.00 0.00 0.05662 3.00 1.615
151 0.00 17.50 0.00 33.36 3.068 232.91 ET 25.52 0.693
SCHED 40 WET STEEL FBE
130 10.11 0 28.52 2.308
LINED
146 0.00 15.00 0.00 39.31 4.00 0.00 0.01250 26.00 0.615
152 0.00 15.00 0.00 39.93 4.026 210.51 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 5.31 0 49.20 0.615
LINED
151 0.00 17.50 0.00 33.36 3.00 0.00 0.12548 18.15 5.480
152 0.00 15.00 0.00 39.93 3.068 358.08 ET 25.52 1.083
SCHED 40 WET STEEL FBE
130 15.54 0 43.67 6.562
LINED
102 0.00 10.30 0.00 33.26 2.00 0.00 0.05673 2.00 0.681
153 0.00 10.30 0.00 33.94 2.067 76.11 T 10.00 0.000
SCHED 40 WET STEEL 120 7.28 0 12.00 0.681
105 0.00 10.30 0.00 34.32 2.00 0.00 0.05738 7.00 0.975
154 0.00 10.30 0.00 35.30 2.067 76.57 T 10.00 0.000
SCHED 40 WET STEEL 120 7.32 0 17.00 0.975
153 0.00 10.30 0.00 33.94 3.00 0.00 0.03474 13.50 1.355
154 0.00 10.30 0.00 35.30 3.068 178.86 ET 25.52 0.000
SCHED 40 WET STEEL FBE
130 7.76 0 39.02 1.355
LINED
152 0.00 15.00 0.00 39.93 6.00 0.00 0.01068 4.00 0.415
155 0.00 15.00 0.00 40.34 6.065 568.59 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 6.31 0 38.80 0.415
LINED
95 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 45
154 0.00 10.30 0.00 35.30 3.00 0.00 0.06716 48.50 7.078
155 0.00 15.00 0.00 40.34 3.068 255.43 2F4ET 56.88 -2.035
SCHED 40 WET STEEL FBE
130 11.09 0 105.38 5.043
LINED
108 0.00 24.00 0.00 29.79 2.00 0.00 0.05047 5.00 0.858
156 0.00 24.00 0.00 30.65 2.067 71.44 FT 12.00 0.000
SCHED 40 WET STEEL 120 6.83 0 17.00 0.858
110 0.00 24.00 0.00 30.25 2.00 0.00 0.02435 4.10 0.392
156 0.00 24.00 0.00 30.65 2.067 48.18 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.61 0 16.10 0.392
113 0.00 17.70 0.00 31.42 2.00 0.00 0.05267 5.00 0.895
157 0.00 17.70 0.00 32.32 2.067 73.11 FT 12.00 0.000
SCHED 40 WET STEEL 120 6.99 0 17.00 0.895
115 0.00 17.70 0.00 31.91 2.00 0.00 0.02541 4.10 0.409
157 0.00 17.70 0.00 32.32 2.067 49.30 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.71 0 16.10 0.409
118 0.00 12.00 0.00 33.64 2.00 0.00 0.05606 5.00 0.953
158 0.00 12.00 0.00 34.60 2.067 75.62 FT 12.00 0.000
SCHED 40 WET STEEL 120 7.23 0 17.00 0.953
120 0.00 12.00 0.00 34.16 2.00 0.00 0.02700 4.10 0.435
158 0.00 12.00 0.00 34.60 2.067 50.95 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.87 0 16.10 0.435
157 0.00 17.70 0.00 32.32 3.00 0.00 0.01722 1.50 0.326
159 0.00 17.70 0.00 32.64 3.068 122.41 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 5.31 0 18.90 0.326
LINED
158 0.00 12.00 0.00 34.60 3.00 0.00 0.01832 7.25 0.516
159 0.00 17.70 0.00 32.64 3.068 126.57 FT 20.90 -2.468
SCHED 40 WET STEEL FBE
130 5.49 0 28.15 -1.952
LINED
156 0.00 24.00 0.00 30.65 3.00 0.00 0.01650 6.25 0.448
160 0.00 18.70 0.00 33.39 3.068 119.62 FT 20.90 2.295
SCHED 40 WET STEEL FBE
130 5.19 0 27.15 2.743
LINED
159 0.00 17.70 0.00 32.64 3.00 0.00 0.06406 1.00 1.179
160 0.00 18.70 0.00 33.39 3.068 248.97 T 17.40 -0.433
SCHED 40 WET STEEL FBE
130 10.81 0 18.40 0.746
LINED
96 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 46
160 0.00 18.70 0.00 33.39 3.00 0.00 0.13238 4.50 3.974
161 0.00 16.20 0.00 38.44 3.068 368.60 ET 25.52 1.083
SCHED 40 WET STEEL FBE
130 16.00 0 30.02 5.057
LINED
122 0.00 15.60 0.00 35.27 2.00 0.00 0.02663 6.10 0.482
162 0.00 15.60 0.00 35.76 2.067 50.57 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.84 0 18.10 0.482
126 0.00 15.60 0.00 34.36 2.00 0.00 0.09318 3.00 1.398
162 0.00 15.60 0.00 35.76 2.067 99.51 FT 12.00 0.000
SCHED 40 WET STEEL 120 9.51 0 15.00 1.398
127 0.00 11.50 0.00 37.47 2.00 0.00 0.00819 7.00 0.156
163 0.00 11.50 0.00 37.62 2.067 26.74 FT 12.00 0.000
SCHED 40 WET STEEL 120 2.56 0 19.00 0.156
130 0.00 11.50 0.00 36.65 2.00 0.00 0.06069 4.00 0.971
163 0.00 11.50 0.00 37.62 2.067 78.93 FT 12.00 0.000
SCHED 40 WET STEEL 120 7.55 0 16.00 0.971
162 0.00 15.60 0.00 35.76 3.00 0.00 0.02511 3.50 0.525
164 0.00 15.60 0.00 36.28 3.068 150.09 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 6.51 0 20.90 0.525
LINED
163 0.00 11.50 0.00 37.62 3.00 0.00 0.01312 7.50 0.433
164 0.00 15.60 0.00 36.28 3.068 105.66 ET 25.52 -1.775
SCHED 40 WET STEEL FBE
130 4.59 0 33.02 -1.342
LINED
131 0.00 15.70 0.00 33.62 2.00 0.00 0.10638 3.00 0.532
165 0.00 15.70 0.00 34.15 2.067 106.91 F 2.00 0.000
SCHED 40 WET STEEL 120 10.22 0 5.00 0.532
138 0.00 15.70 0.00 32.78 2.00 0.00 0.07490 6.25 1.367
165 0.00 15.70 0.00 34.15 2.067 88.44 FT 12.00 0.000
SCHED 40 WET STEEL 120 8.46 0 18.25 1.367
139 0.00 11.50 0.00 36.18 2.00 0.00 0.03557 4.00 0.213
166 0.00 11.50 0.00 36.39 2.067 59.13 F 2.00 0.000
SCHED 40 WET STEEL 120 5.65 0 6.00 0.213
142 0.00 11.50 0.00 35.99 2.00 0.00 0.02221 6.00 0.400
166 0.00 11.50 0.00 36.39 2.067 45.84 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.38 0 18.00 0.400
97 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 47
165 0.00 15.70 0.00 34.15 3.00 0.00 0.04089 3.50 0.855
167 0.00 15.70 0.00 35.00 3.068 195.34 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 8.48 0 20.90 0.855
LINED
166 0.00 11.50 0.00 36.39 3.00 0.00 0.01296 7.50 0.428
167 0.00 15.70 0.00 35.00 3.068 104.97 ET 25.52 -1.819
SCHED 40 WET STEEL FBE
130 4.56 0 33.02 -1.391
LINED
164 0.00 15.60 0.00 36.28 3.00 0.00 0.06732 8.00 2.257
168 0.00 19.20 0.00 36.98 3.068 255.75 ET 25.52 -1.559
SCHED 40 WET STEEL FBE
130 11.10 0 33.52 0.698
LINED
167 0.00 15.70 0.00 35.00 3.00 0.00 0.09062 13.00 3.491
168 0.00 19.20 0.00 36.98 3.068 300.31 ET 25.52 -1.516
SCHED 40 WET STEEL FBE
130 13.03 0 38.52 1.975
LINED
161 0.00 16.20 0.00 38.44 6.00 0.00 0.00479 11.20 0.220
169 0.00 16.20 0.00 38.67 6.065 368.60 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 4.09 0 46.00 0.220
LINED
168 0.00 19.20 0.00 36.98 6.00 0.00 0.01025 3.00 0.388
169 0.00 16.20 0.00 38.67 6.065 556.06 T 34.80 1.299
SCHED 40 WET STEEL FBE
130 6.18 0 37.80 1.687
LINED
155 0.00 15.00 0.00 40.34 6.00 0.00 0.02122 42.00 2.664
170 0.00 16.50 0.00 42.36 6.065 824.02 3ET 83.52 -0.650
SCHED 40 WET STEEL FBE
130 9.15 0 125.52 2.015
LINED
143 0.00 16.20 0.00 40.87 6.00 0.00 0.02914 73.00 5.508
171 0.00 24.00 0.00 43.00 6.065 978.08 2F4ET 116.00 -3.377
SCHED 40 WET STEEL FBE
130 10.86 0 189.00 2.131
LINED
170 0.00 16.50 0.00 42.36 6.00 0.00 0.02122 83.50 3.890
171 0.00 24.00 0.00 43.00 6.065 824.02 4ET 99.76 -3.248
SCHED 40 WET STEEL FBE
130 9.15 0 183.26 0.642
LINED
171 0.00 24.00 0.00 43.00 8.00 0.00 0.02371 245.00 13.075
172 0.00 0.00 0.00 66.46 7.981 1802.10 10ETGC 306.40 10.392
SCHED 40 WET STEEL FBE
130 11.56 0 551.40 23.467
LINED
98 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 48
172 0.00 0.00 0.00 66.46 8.00 0.00 0.02371 25.00 1.088
173 0.00 -3.30 0.00 68.98 7.981 1802.10 E 20.90 1.429
SCHED 40 WET STEEL CEMENT
130 11.56 0 45.90 2.517
LINE
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
99 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 49
100 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 50
101 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 51
102 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 52
103 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 53
104 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 54
Sprinkler Summary
Sprinkler System Type: Dry
Specified Area Of Application: 2975.00 ft²
Adjusted Area Of Application: 3867.50 ft²
Minimum Desired Density: 0.250 gpm/ft²
Application Average Density: 0.606 gpm/ft²
Application Adjusted Density (not required by NFPA 13): 0.466 gpm/ft²
Application Average Area Per Sprinkler: 41.32 ft²
Adjusted Area Per Sprinkler (not required by NFPA 13): 53.72 ft²
Sprinkler Flow: 1802.10 gpm
Average Sprinkler Flow: 25.03 gpm
105 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 55
200
180
160 152
140
Pressure psi
120
100
100
80
60
40
40
20
0
20 40 60 80 100 120 140 160 180 200
Flowrate(x100) gpm
106 of 342
C:\ ...\Z14 Reactors & Exchangers - Train B.fiw Tuesday, January 15, 2019, 8:28 AM
23
1" NPD
210
1" NPD
173
380
171 1214
75
149
2
5
E
L 57
.6
3"x2"
0
0 64
95 19
2
5 48 5
0
2
3"x2"
0
15
6
91
3
5
17
1077
1" NPD
37
7
3 Z14-V-7 0
9 0
0
E
L
4 94 L
.6
4
0 E
0
5
78
0
EL.6193
0
4
92 3
1" NPD
170 22 17 8
6
0 12
0 93
1440
8 260
8
16
6
"
N 20
1" NPD
P
D
21
3" NPD
575
1497
E
L
.4
5
5
3
3" NPD
582
12
8
4
0
5
4
4
D
155
P
N
"
3
11
0
0
6 4
"
13
5
33
8 150 N
P
D .5
30
.5 EL
EL 5
82
.5
EL
575
1" NPD
3" NPD
18 210
481
1" NPD
173
3"x2"
380
211 1596
45
2 8
27
3 2" NPD 14 5
0
4
P
D
N
"
0
65 3
90
2
48
1
2
3"x2"
0
2005
15
148 6
6
"
152 x4
"
53
86
17
3" NPD
521
7
7
2
4 1
"
N
P
D
370
Z14-V-7 30
4
.5
EL 151 18
1" NPD
89 2
146
E
L
.4
78
5
5
0
3
14
6
1" NPD
7 EL.5043 0
4
6 87 3
4
3" NPD
19 D
533
P
0 N 17 6
0 " 8
15
6
P
D
3
17 0
0 12
6
"
N
88
57
6
E
L 1440
.3 3
50
13
260 EL.52 6
3
4 0 2
0 0 190
15
3
5 0
6 D
2
3 P
3
N
1" NPD
" 0
3 0
4 0
3" NPD
2
0
1274
0
.4 19
154 E
L
0
E
L
.3
16 .3
8
3
13 L
E
0
1038
2 03
21
0
.4
D
5
5
EL
8
2
33
N
"
N
3
1"
P
6
D
17
5
3
355
5
EL. 2860 E
7
L
6
.2
5
0
.3
0 7
0
4 D 9
2 2
2
P
L
N 105 2
2
E
" 5
3
1" NPD
8
5
4
13 210
E 211 1596
1" NPD
L
.3 147
380
13 2" NPD 45
0 2
173
3"x2"
85 9
3"x2"
0
17
0
17 17 7 65
D
2
2
2 2 1 1
2
3 5 6
N
"
153 2
"
32
3
5
1"
N N 5 15
P
17
D P 4 3 0
2
D 10
3
3
8
5
5
5
5
4
81 3
2
9
7
0
"
2 N
P
30
"
104 D
D
N
P
8
P
D 16
4
Z14-E-6B
N
5
102
1734
0
5
3
1"
2
"
7
31
17
N
6
246 P
0
D 4
.3
2 1 2 7
4
11
1" NPD
" 2 2
x1 0 Z14-V-7
L
450
" 12
E
7 2 1
2 2 "
E 0 0 x1
0
388
1" NPD
L 6 0 "
.2 2
220
9
103
2" NPD
0 EL. 2750 E
0 L 3
1030
0 8
220 .3 42 12
27 12 5
408
4 D
0
13 P
101 E
4
1" NPD
0 3 N L
" .2
3
0 2
30 84 7 0 7
9
2
17
246
145
470
0
1" NPD
4 0
2 2 3
450
" 4
N 7
1" NPD
P 2
D 2
0 12
0 2 1
0 "x1 0
29
1" NPD
EL.3468 " 0
220 14
80
220
2" NPD
D
2" NPD
P
99 82
542
100 6 "
N
408
2
14
2
83
6
2
246 12
8
12
8
1" NPD
2
0 2
450
8
1440 8
175
260 5
E
76
370
1" NPD
L
.3
10 3
173
220 28 13 0
0 3
4
1" NPD
0 15 1"
4
7
2 2
0
79 N
P
D
9 E
12 L
2 1 0 .2
11 "x1 4
0 2
5
1" NPD
" 0
1120
220
2" NPD
350 3
EL. 1630 13
4
78
408
49
3
350 4
EL. 1280
0
13
5
3 .1
5 EL
2
0
6 77 7
.7 0 0
0
L
E 18 8
.3 6
L 0
E
26
8
950
6
.5 Z14-E-6B
1226
L
E
0
50
0 Z14-E-15 0
0 13
1" NPD
10 .1
238
EL
11
2
5
650
0
8
0
0
3
5
2 0
6 0
D E 7
P L 3
1007
N .5
13
6
"
9
8
0
98 L
.1 0
E 8
1" NPD
0 .4
L
370
E 3 0 E
L
.5 .3 0
8 E
L 10
1079
4
4
25 x1
"
3
3
"
"
5
6 2 14 P
D
0
x6 2 8 N
4
" 6 "
8 2
0
6 .5
"
0
" L
2
N
N E
P
P
D
D
8
2 7
171 2 2 5
204
8
1" NPD
0 12 3
3 13
237
"
N .1
E
L
.8 3
2
2
0
61 1
P
D E
L
5
2
5
31
2
8 4
9
7
75
3" NPD
5
1
1054
220
204
L
60
150
E E 11
L 0 7
. 0 5
6
3 10
160 5 2" 9 3
0 x1 2
" 5 13 6 2
.1 8
0
8
0
168
1" NPD
97 E
L
1" NPD
"
170
155 9
0
"x3
7 6
0
.4 24
2" NPD
220
0
195
1210
6
3338
2
4
0
59 E " E
22
2"x1" L
P
D
"x3 .4
N 6 8
" 8 0
8 6
1" NPD
167
2" NPD
.5 220
5 7
5
432
L 11
1" NPD
EL.4992 E 0
460
0 0
1186
8
202
350
4 0
10 10
35
1" NPD
173
1" NPD
345 2" NPD 410
237
0
8 683
0
13
2
4 " 0
2
0 1111 0
7 x2 73 13 74
1" NPD
132 3
" 319
6
8
0
5
131 "x2
"
0 21
E
L 2
7 3 15 13
.7
2
496
133 10 36 2
0
0
0
6
165
2
9
3
0 96 107 4
0
3
5 .3 8
1 1 E
L .4
5 L
3 5 E
34
108
874
0
2
5
0
D
138
P
N 65
14
" 12
1132
1" NPD
6 3
4
202
0 3
3
2
2 "
2 N
0
P
Z14-V-5B 106
2
D
15
2"
x1 "
" x2
1
3"
1027
156
998
15
Z14-V-4D
1073
66
3" NPD
1270
0
7 22 451
4 D "
9
4 NP x2
3" 3"
330
L
239
E 4
45
537
22
2
63
2" NPD
2
34
202
0
0
62
1" NPD
277 5
E 7 6
L 6 15 1
.6 .4 .7 3
2
EL
13 2
0 2"
x1 137 E L
109 4
0
1" NPD
2 " L E 3
3 .5
3
110
325
7 7 2 69
15 4 1
9 4
1" NPD
2" NPD
64 L
.4
1210
202
8 E 1
" 19 97 17
N 0 2 D 4
4 P 7 P
2 D 6 2 N
0 3 " EL. 6979
272
2" NPD
2
0 14 6 0
0
2
2
155
3" NPD
16
6
766
8 EL. 6979
3
134 2" NPD 8
5 37
313 489 506
38
E
135 136 9
L 3
.5 2
0
1045
8
8
0
2
5
.3
L
220 E
220
161 40
394
3" NPD
350
1441
1" NPD
173
1" NPD
173
4
17
5
0
67 10
4
8 6
6
0
0
2
2
2
6" NPD
2
1" NPD
897
2" NPD 1086 506
719 719 0
8 8
" 4
0 " 12
N 7
11 P
D "x2 1740
9
0
0
6
139
3
"x2
" 41 112
3 3
14 0
2
4
10
166 2
9 113
1026
15
160
1" NPD
719
1" NPD
719 2
6
7
N
P
D
" Z14-V-5B 111
x2
" 3" 157
0
6
15
1" NPD
1" NPD
309
D "
NP x2
3" 3"
4
Z14-V-4D 45
537
140 142 EL. 3300
39
1" NPD
1" NPD
1
159 3
2
114
888
3190
70
1" NPD
0
10
0 68 .5
40
6
3 3
4
4 719 EL 2
1 115
719
694
1
17
3" NPD
0 14 3 EL. 5229
42
1074
0 14
3
141
1" NPD
2" NPD
2 72 43
719 719 2
0
240
3" NPD
E
1750
E L
L .6
.1 3
1010
0 5
10 0
A 220
U
/G
69 2
13
350
/G 8
0
5
0
180
1" NPD
45
173
2
172 17
2
169
0
987
2
2 171
"
2
x1
"
2" NPD
E
L 1180
.-
947
614
9
71
1" NPD
8
7 2
2
0
6
9
117
204
D E 13 D
5 -A L
8
5
R
A
IN
8
"
N
P
0
.6
3
5
49 2
"
N
P 170
65
T D 7 0 2
P 5 0
6
"
N 6 2
8
8
2
2
46 4
2
0
70
454
277
TIE-IN 1
-B 0
118
1" NPD
N
8
0 A
I
3 144 3
5
180
R
0 T
17
9 .6
D L 0
P E 7
N 7
1
6
" .4
4
L
1" NPD
E
4
2
10
16 "
173 "
x1
" 155
220
116
2" NPD
2
N
202
0
P
6
D
164
2
947
2
8 Z14-V-5B
2
5
22
15
2"
x1"
E
L 8
158
2" NPD
4 "
1" NPD
1210
.- x2
54 10 D
3"
202
9 P
8 N
7 "
3
D "
NP x2
53
2" NPD 410 3"
45
4
3"
44
7
TIE-IN 1029
143 4
120
1" NPD
5 "
0
"x2
126 3
1" NPD
"
x2
17
4
7
3
"
65
6 1
1640
119
17 .3 2 0
374
11 3
EL 694 EL. 4030
3
4
9
374
162 8
5 3
2
1 17
1
3
874
D
17
EL. 3479
3
NP
9
4
47
1"
Z14-V-4C
3" NPD
1250
7
4
9
4
2
0 48
L 2
E
122 9
2
998 2
0 52 L
.4
9
2 E
239
50
277
202
220
53 2"
x1" 121
325
0
2
2
51
1" NPD
2" NPD
1210
0
2
202
2
17
1
1" NPD
202
15
7
7
2" NPD
125 443 489 350
124 123
0
2
5
.3
L
E
220
394
1" NPD
173
58 4
8
10 D
0
P
2
N
"
2
3
2" NPD
719 719
4 "
5
0
"x2
3
6
130 "x2
"
3 3
14
9
8
5
163
719
719
1" NPD
1" NPD
129 Z14-V-4C
127
EL. 3300
326
57
719
55 FIRE PROTECTION HYDRAULIC ISOMETRIC-Z14 (TRAIN-B)
14
3 128
Z14-V-4C/4C, 5B, E-6B & E-15
1" NPD
2" NPD
620 640
56
107 of 342
AREA-E&F
108 of 342
UPGRADE HYDROPROCESSING INTEGRITY-RR
Fire Sprinkler Reports
for
SAUDI ARAMCO
Prepared By:
JACOBS ZATE
JACOBS ZATE
ALKHOBAR
SAUDI ARABIA
DECEMBER 2018
109 of 342
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 2
General Data
Project Title: UPGRADE HYDROPROCESSING Z20 Reactor & Exchangers - Area
Project File Name:
INTEGRITY-RR E..fiw
Designed By: JACOBS ZATE Date: DECEMBER 2018
Code Reference: NFPA 15, API 2030 & SAES-B-017 Approving Agency: SAUDI ARAMCO
Job Number: BI-10-02172-0001
Client Name: SAUDI ARAMCO Phone: SAUDI ARABIA
Address: Z20-V-1, Z20-E-1A/B/C/D (XV-5153) City, State Zip Code: RIYADH REFINERY
Company Name: JACOBS ZATE Representative:
Company Address: ALKHOBAR City And State: SAUDI ARABIA
Phone:
Job Number: BI-10-02172-0001
Building Name: Z20-V-1, Z20-E-1A/B/C/D Building Owner: SAUDI ARAMCO
Contact at Building: RIYADH REFINERY Phone at Building:
Address Of Building: AREA F City, State Zip Code: RIYADH
Project Data
Description Of Hazard: HIGH RISK AREA Sprinkler System Type: Dry
Design Area Of Water Application: 2560 ft² Maximum Area Per Sprinkler: 76 ft²
Default Sprinkler K-Factor: 4.48 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: HD FIRE PROTECT Model: MV-A
Size: 1/2" Temperature Rating: 100 F
WATER SPRAY NOZZLES
110 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 3
111 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 4
112 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 5
113 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 6
114 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 7
115 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 8
116 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 9
117 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 10
118 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 11
119 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 12
120 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 13
59 104 SCHED 40 WET STEEL 2.000 0 2FT 14.54 14.00 28.54 120
62 103 SCHED 40 WET STEEL 2.000 0 2FET 15.80 19.00 34.80 120
65 103 SCHED 40 WET STEEL 2.000 0 2ET 16.34 20.00 36.34 120
76 107 SCHED 40 WET STEEL 2.000 0 2FT 9.40 14.00 23.40 120
121 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 14
100 101 SCHED 40 WET STEEL 2.000 0 FT 4.87 12.00 16.87 120
101 102 SCHED 40 WET STEEL 2.000 0 FT 4.84 12.00 16.84 120
102 113 SCHED 40 WET STEEL 2.000 0 FT 3.61 12.00 15.61 120
122 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 15
111 114 SCHED 40 WET STEEL 2.000 0 ET 9.20 15.00 24.20 120
112 114 SCHED 40 WET STEEL 2.000 0 T 1.84 10.00 11.84 120
113 116 SCHED 40 WET STEEL 2.000 0 2ET 10.70 20.00 30.70 120
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
123 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 16
124 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 17
125 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 18
126 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 19
127 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 20
128 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 21
129 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 22
130 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 23
131 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 24
132 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 25
133 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 26
134 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 27
135 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 28
136 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 29
137 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 30
100 0.00 10.20 0.00 33.48 2.00 0.00 0.02719 4.87 0.459
101 0.00 10.20 0.00 33.93 2.067 51.14 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.89 0 16.87 0.459
101 0.00 10.20 0.00 33.93 2.00 0.00 0.05784 4.84 0.974
102 0.00 10.20 0.00 34.91 2.067 76.91 FT 12.00 0.000
SCHED 40 WET STEEL 120 7.35 0 16.84 0.974
103 0.00 11.70 0.00 36.72 3.00 0.00 0.02643 3.36 0.549
104 0.00 12.40 0.00 36.97 3.068 154.28 T 17.40 -0.303
SCHED 40 WET STEEL FBE
130 6.70 0 20.76 0.245
LINED
104 0.00 12.40 0.00 36.97 3.00 0.00 0.05641 1.07 1.042
105 0.00 7.30 0.00 40.22 3.068 232.45 T 17.40 2.208
SCHED 40 WET STEEL FBE
130 10.09 0 18.47 3.250
LINED
138 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 31
106 0.00 7.30 0.00 37.73 3.00 0.00 0.04451 4.52 0.976
107 0.00 11.80 0.00 36.75 3.068 204.49 T 17.40 -1.949
SCHED 40 WET STEEL FBE
130 8.87 0 21.92 -0.973
LINED
107 0.00 11.80 0.00 36.75 3.00 0.00 0.08092 0.56 1.453
108 0.00 12.40 0.00 37.95 3.068 282.48 T 17.40 -0.260
SCHED 40 WET STEEL FBE
130 12.26 0 17.96 1.193
LINED
108 0.00 12.40 0.00 37.95 3.00 0.00 0.16157 6.37 6.464
109 0.00 15.20 0.00 43.20 3.068 410.50 2ET 33.64 -1.212
SCHED 40 WET STEEL FBE
130 17.82 0 40.01 5.252
LINED
105 0.00 7.30 0.00 40.22 3.00 0.00 0.12813 18.14 6.634
110 0.00 15.20 0.00 43.43 3.068 362.14 2ET 33.64 -3.421
SCHED 40 WET STEEL FBE
130 15.72 0 51.78 3.214
LINED
109 0.00 15.20 0.00 43.20 6.00 0.00 0.00585 4.64 0.231
110 0.00 15.20 0.00 43.43 6.065 410.50 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 4.56 0 39.44 0.231
LINED
139 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 32
102 0.00 10.20 0.00 34.91 2.00 0.00 0.09939 3.61 1.551
113 0.00 10.20 0.00 36.46 2.067 103.05 FT 12.00 0.000
SCHED 40 WET STEEL 120 9.85 0 15.61 1.551
111 0.00 28.90 0.00 27.65 2.00 0.00 0.22228 9.20 5.379
114 0.00 21.50 0.00 36.23 2.067 159.21 ET 15.00 3.204
SCHED 40 WET STEEL 120 15.22 0 24.20 8.583
112 0.00 21.50 0.00 33.13 2.00 0.00 0.26213 1.84 3.104
114 0.00 21.50 0.00 36.23 2.067 174.05 T 10.00 0.000
SCHED 40 WET STEEL 120 16.64 0 11.84 3.104
114 0.00 21.50 0.00 36.23 3.00 0.00 0.10987 7.90 3.672
115 0.00 14.30 0.00 43.02 3.068 333.26 ET 25.52 3.118
SCHED 40 WET STEEL FBE
130 14.46 0 33.42 6.789
LINED
113 0.00 10.20 0.00 36.46 2.00 0.00 0.28396 10.70 8.718
116 0.00 14.30 0.00 43.40 2.067 181.74 2ET 20.00 -1.775
SCHED 40 WET STEEL 120 17.38 0 30.70 6.942
115 0.00 14.30 0.00 43.02 4.00 0.00 0.02925 1.50 0.383
116 0.00 14.30 0.00 43.40 4.026 333.26 E 11.60 0.000
SCHED 40 WET STEEL FBE
130 8.40 0 13.10 0.383
LINED
116 0.00 14.30 0.00 43.40 4.00 0.00 0.06544 1.31 1.604
117 0.00 14.30 0.00 45.01 4.026 515.01 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 12.98 0 24.51 1.604
LINED
110 0.00 15.20 0.00 43.43 6.00 0.00 0.01884 24.10 1.569
118 0.00 14.30 0.00 45.39 6.065 772.64 FET 59.16 0.390
SCHED 40 WET STEEL FBE
130 8.58 0 83.26 1.958
LINED
117 0.00 14.30 0.00 45.01 6.00 0.00 0.00890 10.65 0.384
118 0.00 14.30 0.00 45.39 6.065 515.01 2E 32.48 0.000
SCHED 40 WET STEEL FBE
130 5.72 0 43.13 0.384
LINED
118 0.00 14.30 0.00 45.39 6.00 0.00 0.04847 107.00 13.736
2F5ET2G
119 0.00 0.00 0.00 65.32 6.065 1287.65 176.36 6.192
C
SCHED 40 WET STEEL FBE
130 14.30 0 283.36 19.928
LINED
140 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 33
119 0.00 0.00 0.00 65.32 6.00 0.00 0.04847 18.33 2.459
120 0.00 -3.40 0.00 69.25 6.065 1287.65 2E 32.40 1.472
SCHED 40 WET STEEL CEMENT
130 14.30 0 50.73 3.931
LINE
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
141 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 34
142 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 35
143 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 36
144 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 37
Sprinkler Summary
Sprinkler System Type: Dry
Specified Area Of Application: 2560.00 ft²
Adjusted Area Of Application: 3328.00 ft²
Minimum Desired Density: 0.250 gpm/ft²
Application Average Density: 0.503 gpm/ft²
Application Adjusted Density (not required by NFPA 13): 0.387 gpm/ft²
Application Average Area Per Sprinkler: 50.20 ft²
Adjusted Area Per Sprinkler (not required by NFPA 13): 65.25 ft²
Sprinkler Flow: 1287.65 gpm
Average Sprinkler Flow: 25.25 gpm
145 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 38
200
180
162
160
140
Pressure psi
120
100
100
90
80
60
40
20
0
10 20 30 40 50 60 70 80 90 100
Flowrate(x100) gpm
146 of 342
C:\ ...\Z20 Reactor & Exchangers - Area E.fiw Tuesday, January 15, 2019, 8:24 AM
D
32
P
N
5
1"
6
2
2
1360
6
5
150 13
31 0
0 6
0
2
4
33
1
8
7
4
5
83 15 .8
7
9
9
7
5
82 84
0 E
L
1270
7 0
.8 5
5
L
E
Z20-V-1
356
111
240
85
556
9
9 86 88 17
0
5
34
87
2" NPD
5 0
4
1993
17
13
1230
280
35 37
36
0
5
5
.8
L
E
D
39
P
0
5
5
254
5
6
1"
.6
2
1360 L
6
" E
5
150 13 "x2
0 6 3
0 0
38
2
4
1
3
8
0
5 90 15
40 4
"
N
P
D
4 3
5 0
5
0 89 91 16
2
1270
5
.6 0
0
E
L 4
N
P
D 114
"
Z20-V-1 2
356
112
2003
3" NPD
240
92
556
9
9
93 95 17
0
5
115
41 5 94 0
17 4 "
13 "x3
1230 4
200
280
23 42 44
E
L 0 0
.3
7
8
17 43 .8
5
5
2
0
E
L 4 5
0 116
250
"
N
P
D
15 4
3" NPD
0
24 0
0 117
275
"
15 17
0 46 3
7
7
6
"x4
74
0
0 47 E
L
.3
15
45
250
0
0
2
18 E
1300 220 L
.3
1" NPD
2" NPD
25 12 10
150
7 0
972
0
5 12 E
0
Z20-E-1F 19
0
17
0
9
5 97 5
3
2
3
7
L
.4
3
0
16 4
353
75 7
5 7
250
7 D
E
L
15
0
96 98 "
N
P
525
E .4 2
L
.2 6
2 10
0 Z20-V-1
1
2
3 2 .3
0
48
173
0 L
E
L
15
3
3 3
3 109 E
0
.3
7 17
26
0
0
2
12 51 113
525
8 4
0 20 16
76 8 49 50 9
353
8
6
2 0
0 8
3 4
D 15
250
5
0 71 15
3
"
N
P
0
7
6
0 0 5
173
0 3 9
3 9
0
841
0
17 2 2
0
5
12
99 0
172
15
27 21 1235
255
0
102
2
0
4
3
72 100
250
77 19 108 17 0
8
0
0 30 2 .3
6
8
5
2
5
E
L
101 6
"
4
0 5 5 15 N
17 16 D
3 D P
D
P P
N N
"
172
" 2
0 3
1" NPD
19 17 5
0
0 28 16 D 118
78 P 387
250
5 N
0
250
0 "
5 3
3
8
D
"
N
P
107
29 2
250
7 274
6
1" NPD
12 0 0 274
0 16
353
11 2
16 8 5
9 15
0 D 9
6
81 "
N "
N
P
6
2
1 6
"
0
0
353
15 79 2 2
13
P
D
110
6
E
L
.4 N
P
D
1378
3
0 0
173
0 3
80
173
3
E 0
L 3 10
.2 3
2 3
3 0 7
0 16
Z20-E-1E 22 0
0
4
16 D
353
4 P
5 N
0 2 "
17 3 3
0
0
0 73 0
173
0
3
3
66 16
0
E
L
.3 15
7
8
0
353
17 3
N
P
D
3
4
7
" .4
15
9 2
E
L
173
0 15
0 0
0
426
0 3 5
17 3 16
67
6
D
P
0
N
3
"
3
250
1" NPD
0
16
353
4
3 2
6
17 18 7
0
P
D
E
L
.3
15
0
10 0
0
3
"
N
106 7
7 0 5
8 0 3
0
0
12 0 68 3 6
173
3 "
3
60 17
173
5 5 N
0 3 P
0 9 D
17 2
11
250
Z20-E-1D 5 8
0
1
0 14
11 0 9
2
250
19 .3
253
L
13
0
0 69 19 E
E
L
.2 61 17
0 70
0
836
5 15 2
5
5 0 17 18
0
250
15
0 13
678
2
63
250
0
5
16
173
0
17
14
0
62 11
6
2
17 5
6 13 19 10
3
8
.3
0
8
678
2
0
0 .- E
L
L
64 E
2391
16
0 1
0
250
9
3
57
173
0
17
201
TIE-IN
2201
0
12
2
7 5 D
8
P E
13 N L
4
.8
678
2 "
E 65 9
120 12 8
4 6
"
L 2 7 N
.2 0 2 2 5 3 P
D
2 16 0
0 0 .3 2
884
3 1 L 0
0 E 1 0
1 58 5 5
3 A
/G
173
0 19
353
17
0 17 P
D U
/G
0 N
" 0
3 2 8
4 3
10
8
173
6 3
3
8 .- 5
0
0 2 L 6 0
3 E
3 D "
N 119
1038
P P D
N TIE-IN D V
"
2
0
16
15 2 59 2
3
0
201
.2
353
0
L
E
15 0
5
0
0 10
173
52 3
3
0
Z20-E-1C 2
7
7 E
L
0 2 .-
16 2
" 10
N 3
P 8
3
D 17
103
353
5
3 8
" 3
19 N 7
0 P 2 D
0 D P
173
E N
53 3
0
L
.3
5
3
"
3 7
9
2
5
5
0
0
16
1024
4
353
54 19 17
0
0
0
173
241
0
3
3
17
0
14
6
5
55 2
"
N
P
D 17
5
3
"
N 104
P
D
WATER SPRAY PIPING HYDRAULICS NODE DIAGRAM-Z20, AREA-E
325
2
2
0
0 Z20-V-1, Z20-E-1C/D/E/F
5
16 D
3
"
N
P 105
1" NPD
173
5
3
9
D 2
P 11
N
"
2
0
8
14
253
5
56
2
18
147 of 342
UPGRADE HYDROPROCESSING INTEGRITY-RR
Fire Sprinkler Reports
for
SAUDI ARAMCO
Z29-V-2, Z29-E-1A/1B/1C/1D,E-2A/2B/2C/2D
RIYADH REFINERY (XV-5154)
Prepared By:
JACOBS ZATE
JACOBS ZATE
ALKHOBAR
SAUDI ARABIA
DECEMBER 2018
148 of 342
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 2
General Data
Project Title: UPGRADE HYDROPROCESSING Z29 Reactor & Exchangers - Area
Project File Name:
INTEGRITY-RR F..fiw
Designed By: JACOBS ZATE Date: DECEMBER 2018
Code Reference: NFPA 15, API 2030 & SAES-B-017 Approving Agency: SAUDI ARAMCO
Job Number: BI-10-02172-0001
Client Name: SAUDI ARAMCO Phone: SAUDI ARABIA
Address: Z29-V-2, Z29-E-1A/1B/1C/1D,E-
City, State Zip Code: RIYADH REFINERY (XV-5154)
2A/2B/2C/2D
Company Name: JACOBS ZATE Representative:
Company Address: ALKHOBAR City And State: SAUDI ARABIA
Phone:
Job Number: BI-10-02172-0001
Building Name: Z29-V-2, Z29-E-1A/1B/1C/1D,E-
Building Owner: SAUDI ARAMCO
2A/2B/2C/2D
Contact at Building: RIYADH REFINERY Phone at Building:
Address Of Building: AREA F City, State Zip Code: RIYADH
Project Data
Description Of Hazard: HIGH RISK AREA Sprinkler System Type: Dry
Design Area Of Water Application: 2865 ft² Maximum Area Per Sprinkler: 76 ft²
Default Sprinkler K-Factor: 4.48 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: HD FIRE PROTECT Model: MV-A
Size: 1/2" Temperature Rating: 100 F
WATER SPRAY NOZZLES
149 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 3
150 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 4
151 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 5
152 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 6
153 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 7
154 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 8
155 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 9
156 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 10
157 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 11
158 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 12
159 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 13
160 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 14
32 101 SCHED 40 WET STEEL 1.000 0 F2E 3.28 5.00 8.28 120
161 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 15
55 124 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
56 125 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
57 126 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
58 127 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
59 128 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
60 129 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
61 130 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
62 131 SCHED 40 WET STEEL 1.000 0 F2E 3.54 7.00 10.54 120
63 132 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
64 133 SCHED 40 WET STEEL 1.000 0 F2E 3.54 5.00 8.54 120
162 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 16
89 141 SCHED 40 WET STEEL 2.000 0 2FT 12.30 14.00 26.30 120
97 144 SCHED 40 WET STEEL 2.000 0 2FET 9.50 19.00 28.50 120
100 101 SCHED 40 WET STEEL 2.000 0 2F2ET 11.60 24.00 35.60 120
101 143 SCHED 40 WET STEEL 2.000 0 T 3.28 10.00 13.28 120
102 103 SCHED 40 WET STEEL 2.000 0 T 4.92 10.00 14.92 120
103 104 SCHED 40 WET STEEL 2.000 0 T 4.00 10.00 14.00 120
104 105 SCHED 40 WET STEEL 2.000 0 T 4.10 10.00 14.10 120
163 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 17
105 106 SCHED 40 WET STEEL 2.000 0 T 4.10 10.00 14.10 120
106 143 SCHED 40 WET STEEL 2.000 0 ET 9.52 15.00 24.52 120
107 108 SCHED 40 WET STEEL 2.000 0 T 9.10 10.00 19.10 120
108 109 SCHED 40 WET STEEL 2.000 0 T 8.86 10.00 18.86 120
109 145 SCHED 40 WET STEEL 2.000 0 2FT 11.50 14.00 25.50 120
110 111 SCHED 40 WET STEEL 2.000 0 T 6.10 10.00 16.10 120
111 112 SCHED 40 WET STEEL 2.000 0 T 5.60 10.00 15.60 120
112 113 SCHED 40 WET STEEL 2.000 0 T 5.60 10.00 15.60 120
113 145 SCHED 40 WET STEEL 2.000 0 2FT 8.10 14.00 22.10 120
114 115 SCHED 40 WET STEEL 2.000 0 T 6.60 10.00 16.60 120
115 116 SCHED 40 WET STEEL 2.000 0 T 5.60 10.00 15.60 120
116 117 SCHED 40 WET STEEL 2.000 0 T 6.30 10.00 16.30 120
117 118 SCHED 40 WET STEEL 2.000 0 ET 9.70 15.00 24.70 120
118 146 SCHED 40 WET STEEL 2.000 0 T 3.10 10.00 13.10 120
119 120 SCHED 40 WET STEEL 2.000 0 2FT 9.40 14.00 23.40 120
120 147 SCHED 40 WET STEEL 2.000 0 FT 3.24 12.00 15.24 120
121 122 SCHED 40 WET STEEL 2.000 0 FT 6.40 12.00 18.40 120
122 123 SCHED 40 WET STEEL 2.000 0 2FT 6.25 14.00 20.25 120
123 147 SCHED 40 WET STEEL 2.000 0 T 3.15 10.00 13.15 120
124 125 SCHED 40 WET STEEL 2.000 0 2FT 7.32 14.00 21.32 120
125 148 SCHED 40 WET STEEL 2.000 0 FT 3.44 12.00 15.44 120
126 127 SCHED 40 WET STEEL 2.000 0 FT 5.60 12.00 17.60 120
127 128 SCHED 40 WET STEEL 2.000 0 2FT 5.12 14.00 19.12 120
128 148 SCHED 40 WET STEEL 2.000 0 T 1.95 10.00 11.95 120
129 130 SCHED 40 WET STEEL 2.000 0 2FT 7.32 14.00 21.32 120
130 149 SCHED 40 WET STEEL 2.000 0 FT 3.44 12.00 15.44 120
164 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 18
131 132 SCHED 40 WET STEEL 2.000 0 FT 5.60 12.00 17.60 120
132 133 SCHED 40 WET STEEL 2.000 0 2FT 5.12 14.00 19.12 120
133 149 SCHED 40 WET STEEL 2.000 0 T 1.95 10.00 11.95 120
134 135 SCHED 40 WET STEEL 2.000 0 2FT 9.40 14.00 23.40 120
135 136 SCHED 40 WET STEEL 2.000 0 FT 6.40 12.00 18.40 120
136 150 SCHED 40 WET STEEL 2.000 0 FT 2.15 12.00 14.15 120
137 138 SCHED 40 WET STEEL 2.000 0 FT 6.40 12.00 18.40 120
138 150 SCHED 40 WET STEEL 2.000 0 FT 4.10 12.00 16.10 120
147 152 SCHED 40 WET STEEL 2.000 0 ET 5.10 15.00 20.10 120
148 152 SCHED 40 WET STEEL 2.000 0 ET 2.20 15.00 17.20 120
149 151 SCHED 40 WET STEEL 2.000 0 ET 2.20 15.00 17.20 120
150 151 SCHED 40 WET STEEL 2.000 0 2F3ET 23.30 29.00 52.30 120
165 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 19
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
166 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 20
167 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 21
168 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 22
169 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 23
170 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 24
171 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 25
172 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 26
173 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 27
174 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 28
175 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 29
176 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 30
177 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 31
178 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 32
179 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 33
180 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 34
100 0.00 1.10 0.00 33.63 2.00 0.00 0.05763 11.60 2.051
101 0.00 6.10 0.00 33.52 2.067 76.75 2F2ET 24.00 -2.165
SCHED 40 WET STEEL 120 7.34 0 35.60 -0.114
102 0.00 7.30 0.00 28.73 2.00 0.00 0.00652 4.92 0.097
103 0.00 7.30 0.00 28.83 2.067 23.64 T 10.00 0.000
SCHED 40 WET STEEL 120 2.26 0 14.92 0.097
181 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 35
103 0.00 7.30 0.00 28.83 2.00 0.00 0.02355 4.00 0.330
104 0.00 7.30 0.00 29.16 2.067 47.32 T 10.00 0.000
SCHED 40 WET STEEL 120 4.52 0 14.00 0.330
104 0.00 7.30 0.00 29.16 2.00 0.00 0.05007 4.10 0.706
105 0.00 7.30 0.00 29.86 2.067 71.14 T 10.00 0.000
SCHED 40 WET STEEL 120 6.80 0 14.10 0.706
105 0.00 7.30 0.00 29.86 2.00 0.00 0.08591 4.10 1.211
106 0.00 7.30 0.00 31.07 2.067 95.24 T 10.00 0.000
SCHED 40 WET STEEL 120 9.11 0 14.10 1.211
107 0.00 1.30 0.00 36.48 2.00 0.00 0.00824 9.10 0.157
108 0.00 1.30 0.00 36.64 2.067 26.83 T 10.00 0.000
SCHED 40 WET STEEL 120 2.57 0 19.10 0.157
108 0.00 1.30 0.00 36.64 2.00 0.00 0.02977 8.86 0.562
109 0.00 1.30 0.00 37.20 2.067 53.71 T 10.00 0.000
SCHED 40 WET STEEL 120 5.14 0 18.86 0.562
182 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 36
110 0.00 7.30 0.00 32.66 2.00 0.00 0.00735 6.10 0.118
111 0.00 7.30 0.00 32.78 2.067 25.21 T 10.00 0.000
SCHED 40 WET STEEL 120 2.41 0 16.10 0.118
111 0.00 7.30 0.00 32.78 2.00 0.00 0.02653 5.60 0.414
112 0.00 7.30 0.00 33.20 2.067 50.47 T 10.00 0.000
SCHED 40 WET STEEL 120 4.83 0 15.60 0.414
112 0.00 7.30 0.00 33.20 2.00 0.00 0.05642 5.60 0.880
113 0.00 7.30 0.00 34.08 2.067 75.88 T 10.00 0.000
SCHED 40 WET STEEL 120 7.26 0 15.60 0.880
114 0.00 7.30 0.00 31.31 2.00 0.00 0.00706 6.60 0.117
115 0.00 7.30 0.00 31.43 2.067 24.68 T 10.00 0.000
SCHED 40 WET STEEL 120 2.36 0 16.60 0.117
115 0.00 7.30 0.00 31.43 2.00 0.00 0.02550 5.60 0.398
116 0.00 7.30 0.00 31.82 2.067 49.40 T 10.00 0.000
SCHED 40 WET STEEL 120 4.72 0 15.60 0.398
116 0.00 7.30 0.00 31.82 2.00 0.00 0.05424 6.30 0.884
117 0.00 7.30 0.00 32.71 2.067 74.28 T 10.00 0.000
SCHED 40 WET STEEL 120 7.10 0 16.30 0.884
183 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 37
117 0.00 7.30 0.00 32.71 2.00 0.00 0.09316 9.70 2.301
118 0.00 7.30 0.00 35.01 2.067 99.51 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.51 0 24.70 2.301
119 0.00 31.30 0.00 26.23 2.00 0.00 0.00605 9.40 0.141
120 0.00 31.30 0.00 26.38 2.067 22.69 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.17 0 23.40 0.141
121 0.00 31.30 0.00 25.57 2.00 0.00 0.00590 6.40 0.109
122 0.00 31.30 0.00 25.68 2.067 22.40 FT 12.00 0.000
SCHED 40 WET STEEL 120 2.14 0 18.40 0.109
122 0.00 31.30 0.00 25.68 2.00 0.00 0.02133 6.25 0.432
123 0.00 31.30 0.00 26.11 2.067 44.85 2FT 14.00 0.000
SCHED 40 WET STEEL 120 4.29 0 20.25 0.432
184 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 38
124 0.00 27.00 0.00 28.31 2.00 0.00 0.00636 7.32 0.136
125 0.00 27.00 0.00 28.45 2.067 23.32 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.23 0 21.32 0.136
126 0.00 27.00 0.00 27.69 2.00 0.00 0.00623 5.60 0.110
127 0.00 27.00 0.00 27.80 2.067 23.06 FT 12.00 0.000
SCHED 40 WET STEEL 120 2.21 0 17.60 0.110
127 0.00 27.00 0.00 27.80 2.00 0.00 0.02251 5.12 0.430
128 0.00 27.00 0.00 28.23 2.067 46.17 2FT 14.00 0.000
SCHED 40 WET STEEL 120 4.41 0 19.12 0.430
129 0.00 21.00 0.00 30.46 2.00 0.00 0.00681 7.32 0.145
130 0.00 21.00 0.00 30.61 2.067 24.20 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.31 0 21.32 0.145
131 0.00 21.00 0.00 29.80 2.00 0.00 0.00660 5.60 0.116
132 0.00 21.00 0.00 29.92 2.067 23.80 FT 12.00 0.000
SCHED 40 WET STEEL 120 2.28 0 17.60 0.116
185 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 39
132 0.00 21.00 0.00 29.92 2.00 0.00 0.02398 5.12 0.458
133 0.00 21.00 0.00 30.38 2.067 47.78 2FT 14.00 0.000
SCHED 40 WET STEEL 120 4.57 0 19.12 0.458
134 0.00 8.70 0.00 30.06 2.00 0.00 0.00687 9.40 0.161
135 0.00 8.70 0.00 30.23 2.067 24.31 2FT 14.00 0.000
SCHED 40 WET STEEL 120 2.32 0 23.40 0.161
135 0.00 8.70 0.00 30.23 2.00 0.00 0.02482 6.40 0.457
136 0.00 8.70 0.00 30.68 2.067 48.68 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.65 0 18.40 0.457
137 0.00 8.70 0.00 30.89 2.00 0.00 0.00704 6.40 0.130
138 0.00 8.70 0.00 31.02 2.067 24.64 FT 12.00 0.000
SCHED 40 WET STEEL 120 2.36 0 18.40 0.130
186 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 40
139 0.00 7.30 0.00 32.11 3.00 0.00 0.04107 3.73 0.868
140 0.00 7.30 0.00 32.98 3.068 195.80 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 8.50 0 21.13 0.868
LINED
141 0.00 7.30 0.00 33.11 3.00 0.00 0.03261 0.53 0.585
142 0.00 7.30 0.00 33.70 3.068 172.86 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 7.50 0 17.93 0.585
LINED
101 0.00 6.10 0.00 33.52 2.00 0.00 0.09745 3.28 1.294
143 0.00 7.30 0.00 34.30 2.067 101.96 T 10.00 -0.520
SCHED 40 WET STEEL 120 9.75 0 13.28 0.775
106 0.00 7.30 0.00 31.07 2.00 0.00 0.13142 9.52 3.222
143 0.00 7.30 0.00 34.30 2.067 119.84 ET 15.00 0.000
SCHED 40 WET STEEL 120 11.46 0 24.52 3.222
143 0.00 7.30 0.00 34.30 3.00 0.00 0.05172 3.80 1.097
144 0.00 7.30 0.00 35.39 3.068 221.80 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 9.63 0 21.20 1.097
LINED
109 0.00 1.30 0.00 37.20 2.00 0.00 0.06338 11.50 1.616
145 0.00 6.80 0.00 36.43 2.067 80.81 2FT 14.00 -2.382
SCHED 40 WET STEEL 120 7.73 0 25.50 -0.765
187 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 41
113 0.00 7.30 0.00 34.08 2.00 0.00 0.09689 8.10 2.141
145 0.00 6.80 0.00 36.43 2.067 101.64 2FT 14.00 0.217
SCHED 40 WET STEEL 120 9.72 0 22.10 2.358
118 0.00 7.30 0.00 35.01 2.00 0.00 0.14288 3.10 1.872
146 0.00 7.30 0.00 36.88 2.067 125.38 T 10.00 0.000
SCHED 40 WET STEEL 120 11.99 0 13.10 1.872
145 0.00 6.80 0.00 36.43 3.00 0.00 0.03604 1.00 0.663
146 0.00 7.30 0.00 36.88 3.068 182.44 T 17.40 -0.217
SCHED 40 WET STEEL FBE
130 7.92 0 18.40 0.447
LINED
120 0.00 31.30 0.00 26.38 2.00 0.00 0.02185 3.24 0.333
147 0.00 31.30 0.00 26.71 2.067 45.44 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.35 0 15.24 0.333
123 0.00 31.30 0.00 26.11 2.00 0.00 0.04542 3.15 0.597
147 0.00 31.30 0.00 26.71 2.067 67.49 T 10.00 0.000
SCHED 40 WET STEEL 120 6.45 0 13.15 0.597
125 0.00 27.00 0.00 28.45 2.00 0.00 0.02298 3.44 0.355
148 0.00 27.00 0.00 28.80 2.067 46.70 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.46 0 15.44 0.355
128 0.00 27.00 0.00 28.23 2.00 0.00 0.04791 1.95 0.573
148 0.00 27.00 0.00 28.80 2.067 69.46 T 10.00 0.000
SCHED 40 WET STEEL 120 6.64 0 11.95 0.573
130 0.00 21.00 0.00 30.61 2.00 0.00 0.02461 3.44 0.380
149 0.00 21.00 0.00 30.99 2.067 48.46 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.63 0 15.44 0.380
133 0.00 21.00 0.00 30.38 2.00 0.00 0.05113 1.95 0.611
149 0.00 21.00 0.00 30.99 2.067 71.95 T 10.00 0.000
SCHED 40 WET STEEL 120 6.88 0 11.95 0.611
136 0.00 8.70 0.00 30.68 2.00 0.00 0.05284 2.15 0.748
150 0.00 8.70 0.00 31.43 2.067 73.23 FT 12.00 0.000
SCHED 40 WET STEEL 120 7.00 0 14.15 0.748
138 0.00 8.70 0.00 31.02 2.00 0.00 0.02544 4.10 0.410
150 0.00 8.70 0.00 31.43 2.067 49.33 FT 12.00 0.000
SCHED 40 WET STEEL 120 4.72 0 16.10 0.410
149 0.00 21.00 0.00 30.99 2.00 0.00 0.13258 2.20 2.280
151 0.00 22.00 0.00 32.84 2.067 120.41 ET 15.00 -0.433
SCHED 40 WET STEEL 120 11.51 0 17.20 1.847
188 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 42
150 0.00 8.70 0.00 31.43 2.00 0.00 0.13700 23.30 7.165
151 0.00 22.00 0.00 32.84 2.067 122.57 2F3ET 29.00 -5.759
SCHED 40 WET STEEL 120 11.72 0 52.30 1.406
147 0.00 31.30 0.00 26.71 2.00 0.00 0.11774 5.10 2.367
152 0.00 28.00 0.00 30.50 2.067 112.93 ET 15.00 1.429
SCHED 40 WET STEEL 120 10.80 0 20.10 3.795
148 0.00 27.00 0.00 28.80 2.00 0.00 0.12404 2.20 2.133
152 0.00 28.00 0.00 30.50 2.067 116.16 ET 15.00 -0.433
SCHED 40 WET STEEL 120 11.11 0 17.20 1.700
151 0.00 22.00 0.00 32.84 3.00 0.00 0.06123 4.35 1.332
153 0.00 26.20 0.00 32.35 3.068 242.98 T 17.40 -1.819
SCHED 40 WET STEEL FBE
130 10.55 0 21.75 -0.487
LINED
152 0.00 28.00 0.00 30.50 3.00 0.00 0.05491 2.00 1.065
153 0.00 26.20 0.00 32.35 3.068 229.09 T 17.40 0.779
SCHED 40 WET STEEL FBE
130 9.94 0 19.40 1.845
LINED
153 0.00 26.20 0.00 32.35 3.00 0.00 0.20923 7.21 6.848
154 0.00 25.00 0.00 39.72 3.068 472.06 ET 25.52 0.520
SCHED 40 WET STEEL FBE
130 20.49 0 32.73 7.368
LINED
154 0.00 25.00 0.00 39.72 6.00 0.00 0.04316 48.50 6.399
155 0.00 9.40 0.00 40.07 6.065 1209.30 4ET 99.76 -6.755
SCHED 40 WET STEEL FBE
130 13.43 0 148.26 -0.356
LINED
146 0.00 7.30 0.00 36.88 3.00 0.00 0.09486 9.60 4.102
155 0.00 9.40 0.00 40.07 3.068 307.83 2ET 33.64 -0.909
SCHED 40 WET STEEL FBE
130 13.36 0 43.24 3.192
LINED
155 0.00 9.40 0.00 40.07 6.00 0.00 0.02506 12.63 1.189
156 0.00 9.40 0.00 38.88 6.065 901.48 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 10.01 0 47.43 1.189
LINED
144 0.00 7.30 0.00 35.39 3.00 0.00 0.10180 9.60 4.402
156 0.00 9.40 0.00 38.88 3.068 319.80 2ET 33.64 -0.909
SCHED 40 WET STEEL FBE
130 13.88 0 43.24 3.492
LINED
189 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 43
156 0.00 9.40 0.00 38.88 6.00 0.00 0.01114 3.60 0.428
157 0.00 9.40 0.00 38.46 6.065 581.68 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 6.46 0 38.40 0.428
LINED
157 0.00 9.40 0.00 38.46 4.00 0.00 0.08197 1.30 2.008
158 0.00 9.40 0.00 36.45 4.026 581.68 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 14.66 0 24.50 2.008
LINED
142 0.00 7.30 0.00 33.70 3.00 0.00 0.08532 9.25 3.659
158 0.00 9.40 0.00 36.45 3.068 290.69 2ET 33.64 -0.909
SCHED 40 WET STEEL FBE
130 12.62 0 42.89 2.750
LINED
158 0.00 9.40 0.00 36.45 4.00 0.00 0.02276 8.20 0.715
159 0.00 9.40 0.00 35.73 4.026 290.99 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 7.33 0 31.40 0.715
LINED
140 0.00 7.30 0.00 32.98 3.00 0.00 0.08548 9.25 3.666
159 0.00 9.40 0.00 35.73 3.068 290.99 2ET 33.64 -0.909
SCHED 40 WET STEEL FBE
130 12.63 0 42.89 2.757
LINED
154 0.00 25.00 0.00 39.72 6.00 0.00 0.07941 95.60 17.543
160 0.00 0.00 0.00 68.09 6.065 1681.37 5E2GC 125.32 10.825
SCHED 40 WET STEEL FBE
130 18.67 0 220.92 28.368
LINED
160 0.00 0.00 0.00 68.09 6.00 0.00 0.07941 42.00 5.908
161 0.00 -5.30 0.00 76.29 6.065 1681.37 2E 32.40 2.295
SCHED 40 WET STEEL CEMENT
130 18.67 0 74.40 8.203
LINE
161 0.00 -5.30 0.00 76.29 6.00 0.00 0.07941 29.00 7.639
162 0.00 -5.30 0.00 83.93 6.065 1681.37 2ET 67.20 0.000
SCHED 40 WET STEEL CEMENT
130 18.67 0 96.20 7.639
LINE
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
190 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 44
191 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 45
192 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 46
193 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 47
194 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 48
195 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 49
Sprinkler Summary
Sprinkler System Type: Dry
Specified Area Of Application: 2865.00 ft²
Adjusted Area Of Application: 3724.50 ft²
Minimum Desired Density: 0.250 gpm/ft²
Application Average Density: 0.587 gpm/ft²
Application Adjusted Density (not required by NFPA 13): 0.451 gpm/ft²
Application Average Area Per Sprinkler: 41.52 ft²
Adjusted Area Per Sprinkler (not required by NFPA 13): 53.98 ft²
Sprinkler Flow: 1681.37 gpm
Average Sprinkler Flow: 24.37 gpm
196 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 50
200
180
162
160
140
Pressure psi
120
100
100
90
80
60
40
20
0
10 20 30 40 50 60 70 80 90 100
Flowrate(x100) gpm
197 of 342
C:\ ...\Z29 Reactor & Exchangers - Area F.fiw Tuesday, January 15, 2019, 8:25 AM
E
L
.3
2
3
5
9
4
0
3
"
N 0
P 5
D 8
.2 0
E
L 18
0
0
4
1" NPD
N
P
D
4
940
210
"
4
2
5 0
8 0 0
D 0
4
N
P 18
"
2
1" NPD
139 5 3
210
16 D
P
N
"
3
0
17 18
0
73 0
3"
7
1" NPD
3 D
11
N
P
2
210
"
3
159
940
2" NPD
0
18
200
17
0
7
72
1" NPD
2
5
6 1
210
0
2
5
0
8
D
P
N
"
4
133
283 17
77 0
0
2
140 0
0 71
4
16 D
P
N
"
3
1486
E
L
.3
8
E 0 15
L
.3 0
2
3
5
70 2
"
N
P
D
E
L
.2
17 2
3
5 13 0
9 3 D
4 3 P
0 N
"
2
3
"
N 187
76
P
D 7
2
8
9
4
0
Z29-E-2B
3
2
.2
L
E
Z29-E-2A 75
940
187
18
0 6 2
6
1
5
0
7
4
3
0
14
5 14
0
74
1" NPD
0
2
0
4
5
12 3
4 5
5
187
210
345
15
0
1" NPD
17 2
"
11 N
115
P
D
3 17 E
1" NPD
7 2 L
3 5 .6
210
3
0 0
3
11
6 8
158 2
0 8
0
80
940
7 2
16
N
P
D
86 15
"
N
P
D
79
2
"
81 7
0
5
6 2
E 10
184
D L
.2 15
0 P D
3 N 2 P 18
5 " 3 N
0 1" 5
3 0
78
16
180
5
9
2 2 15
0 15 0
0 D
4
D
16
2 142 2
3
2
1"
N
P
2
"
4
"
N
P
141 10 N
P
D
2
180
1" NPD
0 E
0 L
5 .3
220
2 9
"
N
P
D
2
9
0
15 2
9 13
0
2
16
1" NPD
D 0
P 7
N 2
3"
"
325
3
16 0
18
85 0
0
4
16
N
P
D
2 14
2
"
84 10
E 7
5
0
L
.2 12 18
2
3
1" NPD
0 11
Z29-E-2D 8
0
210
2
"
N
P
E D
0
L
.3 2
3 Z29-E-2C
2
3 .2
5 L
E
13
1" NPD
0 13
210
18
2" NPD
5
0
2 83
1640
2
0
9 5 14
4
1" NPD
0 8 5
3
3
210
3
"
N
P
D
24 3
5
0
82 2
"
N
P
23 D
E
L
.3
1" NPD
13
990
210
" 0
"x4
6
5
5 8
8 0
0
157 2 92 6
11
0 "
N
P
D
91
93 17
2
0 5
8 2
E
5 15
L D
.2 P 18
N
2
3
0
1" 5
0 90
180
5
9
2 2 3
15 5
0
D
15 P
N 2
2 1" "
0
5
22 N
P
D
15
180
990
156 P
D 9
5
E
L
.3
N 2 13
" 0
2
20 21
D 170
5 P
7 N
184
6 "
3
0
5
8 6.1/8"
3
D 19 19
7
P 3
N
18
" 0
6
5 144 28 4.1/16"
4
11
143 3
2
2
6.1/8"
7
2
89 5
5 E
18
0 L
.7
8
3 0
1" NPD
5 0 4.1/16"
0 18
430
220
16
2
D
2
"
N
P 4
27 3
0
0
P D 0 15
N 3 0
88
3"
" 3 5
1" NPD
3 0 0
0
2
7 26 425
135
325
13
0 0 E
0 L
97 18 .3
1" NPD
3
0
2" NPD
5 D
3 P D
32
210
5 N P
" N 10
2 1" 6 5
0
8
2 12 D 0
5
0 96 0
2
"
N
P
430
E
L
.2
E 2
L
1" NPD
.3 3
2
3 0
0
25
210
208
5 3
2
.2 Z29-E-1B 95
2
L 15
8
E 5
5
0 5
0
0
18
0 Z29-E-1A
9 2 2
2 "
4 0 N
0 5 P
D
3 15
1" NPD
"
N
P
D 101 94 0
5
210
2" NPD
E 5 D
37 L
.3
3
"
N
P
13
0
2
18
0
18
1085
990
6.1/8"
1" NPD
7
2
18
36 0
0
210
2 4.1/16"
5
0
0
18 2
"
405
2
3
0
E 106 87 N
P
D
.2 L 15
1" NPD
49
1" NPD
L .7 12 0
E 8 5
0 0
35
210
175
E
17 L
0 .3
0 5
11 3
0
17
48 15 0
9
2
5 18
5
2
" 2
3
2
105
1" NPD
N 12
5 P 5
155 4 D D 0
34
990
3 P
118
210
N
"
1" NPD
2
0
18
220
0
1" NPD
0 D
213
6 P
N
" 12
104
210
3 0
0 33
146 117 47
2
0 3
2
3" NPD
5
13 19
D
P
172
N 10 13
1" NPD
" 5
6
103 0
220
2
145 "
N
P
46
450
D
31 15
0
2
102
250
3
" 2 E
2
16 x2 L
"
N
P
D 3
"
116 17
0
0
.2
2
3
1" NPD
0
3
30
220
2
7
5
0
18
2" NPD
5
3 D
2
"
N
P Z29-E-1D
2
1425
0
5
7
8
40 Z29-E-1C 100
18
.2
E
L
115 3
2
2
4
6
18 2 5
354 5
0
45
1" NPD
245
7
39 99 0 D 5
220
14 5 P 0
8 3
7
5 N
6 "
18
0 5 2
.2
L 18
E
2
0
2 2 38
44 7
29
7
3 0 0
2
109 0
18
0 2 4
"
114 N
P
D
1" NPD
15
0
220
108 E
18
2 L
6 .2
7
15 2
18
3
0 19
17 5
0 5
0 2
3
2
113 43 107 2
"
N
P 2
1" NPD
D "
N
15
98 P
220
0 D
15
0
3
2 42 E
L
.3
8 E
2 0 L
.3
E 17 3
L 2 0 0
.9 2 0
1" NPD
8
5
4
9
5
112
220
6
"
N
P
D
41
17 2
3
111 0
0 2
1" NPD
220
5
14
2
"
N
P
D
110 15
0
51
E
L
54 987 2"NPD 256
.2
2
3
1" NPD
0
(
TYP.
150
2 )
18
0 12
6 4
9
147 120 3
3
8
2
587
123
Z29-V-2 119
1243
50
2" NPD
53
784
776
52
3
7
8
8
6
5
0
909 0
122 180
EL.954
4
6
P
D
9 N
"
6
121
300
4
6
0
0
285
3
5
.8
L
1" NPD
D E 2"NPD
P 783 283
N
115
"
" 2 (
TYP.
)
x2 0
0 7
253
" 2 2 6
3 18 2 10
6
59 5
9
4
125 6
D 0
5 148
N
P 2
56
533
"
3
2
16 128
152
1066
Z29-V-2 124
350
554
153
2
9
0
127 55
7
126
7
6
733
180
EL.823
D 0
P
N
3
"
0
0 58
18
57
3" NPD
1327
300
4
6
0
9
285
4
6
.6
L
1" NPD
E
783 2"NPD 283
D
115
P
N (
TYP.
)
" 7
2 2 6
0 18 2 10
0
2 6
7
6 64 5
9
4
130
6
E
L
.7 L
.7
9
D 0
5
149
5 E P 2
9 N
533
7 3
"
61
16
2
133
151
3" NPD
6
1066
"
3" NPD
397
N
18
P
D Z29-V-2 129
350
745
0
8
2
9 132 60
2" NPD
131
745
7
7
6
154 733
180
EL.634
9
4747
17 63
10
5 62
4
4
7
0
7 3
9 5
5 .5
.7 E
L
L
E
8
2
18 67 66
3
11
1" NPD
5013
(TYP.
)
2880
0 12
6 4
0 9 3
.2
8
5 135
L E
E L 3
8
.
2 2
136
587
6
5
371
18 0
0 4
0 4 0
0
.2
5
8
N
P
D
Z29-V-2 134
E
L 2
"
3
4 150 65
784
7
69
872
68
1700
3
7
8
E 8
L 6
.8 5
8
4 909
180
"
N
P
D
138 EL.265
0
6 0 V
0 D
2
3
137
E
L
.8
8
4
319
U
A
/G
/G WATER SPRAY PIPING HYDRAULICS NODE DIAGRAM-Z29, AREA-F
160
2173
8
8 0
0 16
16 .-
.- E
L
L
E
6 5
" 2
N
P 15
8 D
7
0
0
12 8
5 0
7 "
N 16
9
P
D 6 P
D .-
N 9 L
" 0 E
12 0
4
3
0 7
0 D
12 P
D
N
P
N "
12
"
161 12
TIE-IN
12
"
N
6 P
9 D
0
0
4
3
7
D
P
N
"
12
8
0
16
.-
E
L
162
TIE-IN
198 of 342
AREA-G
199 of 342
UPGRADE HYDROPROCESSING INTEGRITY-RR
Fire Sprinkler Reports
for
SAUDI ARAMCO
Z12-E-2A1/2A2/2A3/2A4/2A5/2A6 (XV-5162)
RIYADH REFINERY
Prepared By:
JACOBS ZATE
JACOBS ZATE
ALKHOBAR
SAUDI ARABIA
DECEMBER 2018
200 of 342
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 2
General Data
Project Title: UPGRADE HYDROPROCESSING Z12 Train A - Exchangers - Area
Project File Name:
INTEGRITY-RR G..fiw
Designed By: JACOBS ZATE Date: DECEMBER 2018
Code Reference: NFPA 15, API 2030 & SAES-B-017 Approving Agency: SAUDI ARAMCO
Job Number: BI-10-02172-0001
Client Name: SAUDI ARAMCO Phone: SAUDI ARABIA
Address: Z12-E-2A1/2A2/2A3/2A4/2A5/2A6
City, State Zip Code: RIYADH REFINERY
(XV-5162)
Company Name: JACOBS ZATE Representative:
Company Address: ALKHOBAR City And State: SAUDI ARABIA
Phone:
Job Number: BI-10-02172-0001
Building Name: TRAIN A: Z12-E-
Building Owner: SAUDI ARAMCO
2A1/2A2/2A3/2A4/2A5/2A6
Contact at Building: RIYADH REFINERY Phone at Building:
Address Of Building: AREA G City, State Zip Code: RIYADH
Project Data
Description Of Hazard: HIGH RISK AREA Sprinkler System Type: Dry
Design Area Of Water Application: 3820 ft² Maximum Area Per Sprinkler: 76 ft²
Default Sprinkler K-Factor: 4.48 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: HD FIRE PROTECT Model: MV-A
Size: 1/2" Temperature Rating: 100 F
WATER SPRAY NOZZLES
201 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 3
202 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 4
203 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 5
204 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 6
205 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 7
206 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 8
207 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 9
208 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 10
209 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 11
210 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 12
211 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 13
212 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 14
213 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 15
214 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 16
38 122 SCHED 40 WET STEEL 1.000 0 F2E 3.50 5.00 8.50 120
39 123 SCHED 40 WET STEEL 1.000 0 F2E 3.00 5.00 8.00 120
50 134 SCHED 40 WET STEEL 1.000 0 F2E 2.50 5.00 7.50 120
215 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 17
216 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 18
94 169 SCHED 40 WET STEEL 2.000 0 2FT 7.50 14.00 21.50 120
100 101 SCHED 40 WET STEEL 2.000 0 ET 11.00 15.00 26.00 120
101 102 SCHED 40 WET STEEL 2.000 0 T 5.00 10.00 15.00 120
102 103 SCHED 40 WET STEEL 2.000 0 ET 5.50 15.00 20.50 120
103 104 SCHED 40 WET STEEL 2.000 0 3ET 20.00 25.00 45.00 120
104 172 SCHED 40 WET STEEL 2.000 0 T 2.00 10.00 12.00 120
217 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 19
105 106 SCHED 40 WET STEEL 2.000 0 T 9.50 10.00 19.50 120
106 107 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
107 108 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
108 171 SCHED 40 WET STEEL 2.000 0 ET 8.50 15.00 23.50 120
109 110 SCHED 40 WET STEEL 2.000 0 2ET 10.00 20.00 30.00 120
110 111 SCHED 40 WET STEEL 2.000 0 2ET 9.00 20.00 29.00 120
111 112 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
112 171 SCHED 40 WET STEEL 2.000 0 2FT 8.50 14.00 22.50 120
113 114 SCHED 40 WET STEEL 2.000 0 T 2.20 10.00 12.20 120
114 115 SCHED 40 WET STEEL 2.000 0 ET 11.00 15.00 26.00 120
115 116 SCHED 40 WET STEEL 2.000 0 T 5.00 10.00 15.00 120
116 117 SCHED 40 WET STEEL 2.000 0 ET 5.50 15.00 20.50 120
117 174 SCHED 40 WET STEEL 2.000 0 3ET 21.00 25.00 46.00 120
118 119 SCHED 40 WET STEEL 2.000 0 T 9.00 10.00 19.00 120
119 120 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
120 121 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
121 173 SCHED 40 WET STEEL 2.000 0 ET 6.50 15.00 21.50 120
122 123 SCHED 40 WET STEEL 2.000 0 2ET 10.00 20.00 30.00 120
123 124 SCHED 40 WET STEEL 2.000 0 2FT 7.50 14.00 21.50 120
124 125 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
125 126 SCHED 40 WET STEEL 2.000 0 ET 9.50 15.00 24.50 120
126 173 SCHED 40 WET STEEL 2.000 0 T 2.00 10.00 12.00 120
127 128 SCHED 40 WET STEEL 2.000 0 T 2.20 10.00 12.20 120
128 129 SCHED 40 WET STEEL 2.000 0 ET 11.50 15.00 26.50 120
129 130 SCHED 40 WET STEEL 2.000 0 T 5.00 10.00 15.00 120
130 131 SCHED 40 WET STEEL 2.000 0 ET 5.50 15.00 20.50 120
218 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 20
131 132 SCHED 40 WET STEEL 2.000 0 3ET 20.00 25.00 45.00 120
132 176 SCHED 40 WET STEEL 2.000 0 T 2.00 10.00 12.00 120
133 134 SCHED 40 WET STEEL 2.000 0 2ET 10.50 20.00 30.50 120
134 135 SCHED 40 WET STEEL 2.000 0 2FT 8.00 14.00 22.00 120
135 136 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
136 175 SCHED 40 WET STEEL 2.000 0 ET 8.10 15.00 23.10 120
137 138 SCHED 40 WET STEEL 2.000 0 2ET 11.00 20.00 31.00 120
138 139 SCHED 40 WET STEEL 2.000 0 2ET 9.00 20.00 29.00 120
139 140 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
140 175 SCHED 40 WET STEEL 2.000 0 ET 11.00 15.00 26.00 120
141 142 SCHED 40 WET STEEL 2.000 0 T 2.20 10.00 12.20 120
142 143 SCHED 40 WET STEEL 2.000 0 ET 11.00 15.00 26.00 120
143 144 SCHED 40 WET STEEL 2.000 0 T 5.00 10.00 15.00 120
144 145 SCHED 40 WET STEEL 2.000 0 ET 5.50 15.00 20.50 120
145 146 SCHED 40 WET STEEL 2.000 0 3ET 20.00 25.00 45.00 120
146 178 SCHED 40 WET STEEL 2.000 0 T 4.00 10.00 14.00 120
147 148 SCHED 40 WET STEEL 2.000 0 T 9.00 10.00 19.00 120
148 149 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
149 150 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
150 177 SCHED 40 WET STEEL 2.000 0 ET 8.00 15.00 23.00 120
151 152 SCHED 40 WET STEEL 2.000 0 2ET 11.00 20.00 31.00 120
152 153 SCHED 40 WET STEEL 2.000 0 2ET 9.00 20.00 29.00 120
153 154 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
154 177 SCHED 40 WET STEEL 2.000 0 ET 10.00 15.00 25.00 120
155 156 SCHED 40 WET STEEL 2.000 0 T 2.20 10.00 12.20 120
156 157 SCHED 40 WET STEEL 2.000 0 ET 11.00 15.00 26.00 120
219 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 21
157 158 SCHED 40 WET STEEL 2.000 0 T 5.00 10.00 15.00 120
158 159 SCHED 40 WET STEEL 2.000 0 ET 5.50 15.00 20.50 120
159 160 SCHED 40 WET STEEL 2.000 0 3ET 20.00 25.00 45.00 120
160 180 SCHED 40 WET STEEL 2.000 0 T 4.00 10.00 14.00 120
161 162 SCHED 40 WET STEEL 2.000 0 T 9.50 10.00 19.50 120
162 163 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
163 164 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
164 179 SCHED 40 WET STEEL 2.000 0 ET 8.00 15.00 23.00 120
165 166 SCHED 40 WET STEEL 2.000 0 2ET 11.50 20.00 31.50 120
166 167 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
167 168 SCHED 40 WET STEEL 2.000 0 T 7.50 10.00 17.50 120
168 179 SCHED 40 WET STEEL 2.000 0 ET 10.00 15.00 25.00 120
220 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 22
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
221 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 23
222 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 24
223 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 25
224 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 26
225 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 27
226 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 28
227 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 29
228 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 30
229 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 31
230 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 32
231 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 33
232 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 34
233 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 35
234 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 36
235 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 37
100 0.00 3.10 0.00 28.24 2.00 0.00 0.02179 11.00 0.567
101 0.00 3.10 0.00 28.80 2.067 45.37 ET 15.00 0.000
SCHED 40 WET STEEL 120 4.34 0 26.00 0.567
101 0.00 3.10 0.00 28.80 2.00 0.00 0.04606 5.00 0.691
102 0.00 3.10 0.00 29.49 2.067 67.99 T 10.00 0.000
SCHED 40 WET STEEL 120 6.50 0 15.00 0.691
102 0.00 3.10 0.00 29.49 2.00 0.00 0.07881 5.50 1.616
103 0.00 3.70 0.00 30.85 2.067 90.90 ET 15.00 -0.260
SCHED 40 WET STEEL 120 8.69 0 20.50 1.356
103 0.00 3.70 0.00 30.85 2.00 0.00 0.12067 20.00 5.430
104 0.00 10.80 0.00 33.21 2.067 114.44 3ET 25.00 -3.074
SCHED 40 WET STEEL 120 10.94 0 45.00 2.356
236 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 38
105 0.00 14.50 0.00 29.04 2.00 0.00 0.00660 9.50 0.129
106 0.00 14.50 0.00 29.17 2.067 23.79 T 10.00 0.000
SCHED 40 WET STEEL 120 2.27 0 19.50 0.129
106 0.00 14.50 0.00 29.17 2.00 0.00 0.02384 7.50 0.417
107 0.00 14.50 0.00 29.58 2.067 47.63 T 10.00 0.000
SCHED 40 WET STEEL 120 4.55 0 17.50 0.417
107 0.00 14.50 0.00 29.58 2.00 0.00 0.05073 7.50 0.888
108 0.00 14.50 0.00 30.47 2.067 71.64 T 10.00 0.000
SCHED 40 WET STEEL 120 6.85 0 17.50 0.888
109 0.00 14.50 0.00 28.82 2.00 0.00 0.00655 10.00 0.197
110 0.00 14.50 0.00 29.02 2.067 23.70 2ET 20.00 0.000
SCHED 40 WET STEEL 120 2.27 0 30.00 0.197
110 0.00 14.50 0.00 29.02 2.00 0.00 0.02340 9.00 0.678
111 0.00 14.50 0.00 29.70 2.067 47.15 2ET 20.00 0.000
SCHED 40 WET STEEL 120 4.51 0 29.00 0.678
237 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 39
111 0.00 14.50 0.00 29.70 2.00 0.00 0.05012 7.50 0.877
112 0.00 14.50 0.00 30.58 2.067 71.17 T 10.00 0.000
SCHED 40 WET STEEL 120 6.81 0 17.50 0.877
113 0.00 3.10 0.00 29.86 2.00 0.00 0.00626 2.20 0.076
114 0.00 3.10 0.00 29.94 2.067 23.13 T 10.00 0.000
SCHED 40 WET STEEL 120 2.21 0 12.20 0.076
114 0.00 3.10 0.00 29.94 2.00 0.00 0.02306 11.00 0.600
115 0.00 3.10 0.00 30.54 2.067 46.78 ET 15.00 0.000
SCHED 40 WET STEEL 120 4.47 0 26.00 0.600
115 0.00 3.10 0.00 30.54 2.00 0.00 0.04874 5.00 0.731
116 0.00 3.10 0.00 31.27 2.067 70.11 T 10.00 0.000
SCHED 40 WET STEEL 120 6.70 0 15.00 0.731
116 0.00 3.10 0.00 31.27 2.00 0.00 0.08341 5.50 1.710
117 0.00 3.70 0.00 32.72 2.067 93.73 ET 15.00 -0.260
SCHED 40 WET STEEL 120 8.96 0 20.50 1.450
238 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 40
118 0.00 14.50 0.00 29.60 2.00 0.00 0.00672 9.00 0.128
119 0.00 14.50 0.00 29.73 2.067 24.02 T 10.00 0.000
SCHED 40 WET STEEL 120 2.30 0 19.00 0.128
119 0.00 14.50 0.00 29.73 2.00 0.00 0.02427 7.50 0.425
120 0.00 14.50 0.00 30.16 2.067 48.09 T 10.00 0.000
SCHED 40 WET STEEL 120 4.60 0 17.50 0.425
120 0.00 14.50 0.00 30.16 2.00 0.00 0.05165 7.50 0.904
121 0.00 14.50 0.00 31.06 2.067 72.34 T 10.00 0.000
SCHED 40 WET STEEL 120 6.92 0 17.50 0.904
122 0.00 14.50 0.00 27.90 2.00 0.00 0.00618 10.00 0.185
123 0.00 14.50 0.00 28.08 2.067 22.96 2ET 20.00 0.000
SCHED 40 WET STEEL 120 2.19 0 30.00 0.185
123 0.00 14.50 0.00 28.08 2.00 0.00 0.02237 7.50 0.481
124 0.00 14.50 0.00 28.57 2.067 46.02 2FT 14.00 0.000
SCHED 40 WET STEEL 120 4.40 0 21.50 0.481
239 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 41
124 0.00 14.50 0.00 28.57 2.00 0.00 0.04806 7.50 0.841
125 0.00 14.50 0.00 29.41 2.067 69.58 T 10.00 0.000
SCHED 40 WET STEEL 120 6.65 0 17.50 0.841
125 0.00 14.50 0.00 29.41 2.00 0.00 0.08299 9.50 2.033
126 0.00 14.50 0.00 31.44 2.067 93.48 ET 15.00 0.000
SCHED 40 WET STEEL 120 8.94 0 24.50 2.033
127 0.00 3.10 0.00 29.80 2.00 0.00 0.00625 2.20 0.076
128 0.00 3.10 0.00 29.88 2.067 23.10 T 10.00 0.000
SCHED 40 WET STEEL 120 2.21 0 12.20 0.076
128 0.00 3.10 0.00 29.88 2.00 0.00 0.02301 11.50 0.610
129 0.00 3.10 0.00 30.49 2.067 46.73 ET 15.00 0.000
SCHED 40 WET STEEL 120 4.47 0 26.50 0.610
129 0.00 3.10 0.00 30.49 2.00 0.00 0.04865 5.00 0.730
130 0.00 3.10 0.00 31.22 2.067 70.04 T 10.00 0.000
SCHED 40 WET STEEL 120 6.70 0 15.00 0.730
130 0.00 3.10 0.00 31.22 2.00 0.00 0.08324 5.50 1.706
131 0.00 3.70 0.00 32.66 2.067 93.63 ET 15.00 -0.260
SCHED 40 WET STEEL 120 8.95 0 20.50 1.447
240 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 42
131 0.00 3.70 0.00 32.66 2.00 0.00 0.12736 20.00 5.731
132 0.00 10.80 0.00 35.32 2.067 117.83 3ET 25.00 -3.074
SCHED 40 WET STEEL 120 11.27 0 45.00 2.657
133 0.00 14.50 0.00 30.88 2.00 0.00 0.00695 10.50 0.212
134 0.00 14.50 0.00 31.10 2.067 24.47 2ET 20.00 0.000
SCHED 40 WET STEEL 120 2.34 0 30.50 0.212
134 0.00 14.50 0.00 31.10 2.00 0.00 0.02497 8.00 0.549
135 0.00 14.50 0.00 31.65 2.067 48.84 2FT 14.00 0.000
SCHED 40 WET STEEL 120 4.67 0 22.00 0.549
135 0.00 14.50 0.00 31.65 2.00 0.00 0.05339 7.50 0.934
136 0.00 14.50 0.00 32.58 2.067 73.65 T 10.00 0.000
SCHED 40 WET STEEL 120 7.04 0 17.50 0.934
137 0.00 14.50 0.00 30.48 2.00 0.00 0.00690 11.00 0.214
138 0.00 14.50 0.00 30.69 2.067 24.38 2ET 20.00 0.000
SCHED 40 WET STEEL 120 2.33 0 31.00 0.214
241 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 43
138 0.00 14.50 0.00 30.69 2.00 0.00 0.02472 9.00 0.717
139 0.00 14.50 0.00 31.41 2.067 48.57 2ET 20.00 0.000
SCHED 40 WET STEEL 120 4.64 0 29.00 0.717
139 0.00 14.50 0.00 31.41 2.00 0.00 0.05290 7.50 0.926
140 0.00 14.50 0.00 32.33 2.067 73.28 T 10.00 0.000
SCHED 40 WET STEEL 120 7.01 0 17.50 0.926
141 0.00 3.10 0.00 28.85 2.00 0.00 0.00606 2.20 0.074
142 0.00 3.10 0.00 28.93 2.067 22.71 T 10.00 0.000
SCHED 40 WET STEEL 120 2.17 0 12.20 0.074
142 0.00 3.10 0.00 28.93 2.00 0.00 0.02230 11.00 0.580
143 0.00 3.10 0.00 29.51 2.067 45.95 ET 15.00 0.000
SCHED 40 WET STEEL 120 4.39 0 26.00 0.580
143 0.00 3.10 0.00 29.51 2.00 0.00 0.04714 5.00 0.707
144 0.00 3.10 0.00 30.21 2.067 68.86 T 10.00 0.000
SCHED 40 WET STEEL 120 6.58 0 15.00 0.707
242 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 44
144 0.00 3.10 0.00 30.21 2.00 0.00 0.08067 5.50 1.654
145 0.00 3.70 0.00 31.61 2.067 92.06 ET 15.00 -0.260
SCHED 40 WET STEEL 120 8.80 0 20.50 1.394
145 0.00 3.70 0.00 31.61 2.00 0.00 0.12349 20.00 5.557
146 0.00 10.80 0.00 34.09 2.067 115.88 3ET 25.00 -3.074
SCHED 40 WET STEEL 120 11.08 0 45.00 2.483
147 0.00 14.50 0.00 30.61 2.00 0.00 0.00693 9.00 0.132
148 0.00 14.50 0.00 30.74 2.067 24.43 T 10.00 0.000
SCHED 40 WET STEEL 120 2.34 0 19.00 0.132
148 0.00 14.50 0.00 30.74 2.00 0.00 0.02500 7.50 0.438
149 0.00 14.50 0.00 31.18 2.067 48.87 T 10.00 0.000
SCHED 40 WET STEEL 120 4.67 0 17.50 0.438
149 0.00 14.50 0.00 31.18 2.00 0.00 0.05318 7.50 0.931
150 0.00 14.50 0.00 32.11 2.067 73.49 T 10.00 0.000
SCHED 40 WET STEEL 120 7.03 0 17.50 0.931
243 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 45
151 0.00 14.50 0.00 30.12 2.00 0.00 0.00683 11.00 0.212
152 0.00 14.50 0.00 30.33 2.067 24.23 2ET 20.00 0.000
SCHED 40 WET STEEL 120 2.32 0 31.00 0.212
152 0.00 14.50 0.00 30.33 2.00 0.00 0.02445 9.00 0.709
153 0.00 14.50 0.00 31.04 2.067 48.29 2ET 20.00 0.000
SCHED 40 WET STEEL 120 4.62 0 29.00 0.709
153 0.00 14.50 0.00 31.04 2.00 0.00 0.05233 7.50 0.916
154 0.00 14.50 0.00 31.96 2.067 72.85 T 10.00 0.000
SCHED 40 WET STEEL 120 6.97 0 17.50 0.916
155 0.00 3.10 0.00 28.18 2.00 0.00 0.00592 2.20 0.072
156 0.00 3.10 0.00 28.25 2.067 22.43 T 10.00 0.000
SCHED 40 WET STEEL 120 2.14 0 12.20 0.072
156 0.00 3.10 0.00 28.25 2.00 0.00 0.02180 11.00 0.567
157 0.00 3.10 0.00 28.82 2.067 45.38 ET 15.00 0.000
SCHED 40 WET STEEL 120 4.34 0 26.00 0.567
157 0.00 3.10 0.00 28.82 2.00 0.00 0.04607 5.00 0.691
158 0.00 3.10 0.00 29.51 2.067 68.01 T 10.00 0.000
SCHED 40 WET STEEL 120 6.50 0 15.00 0.691
244 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 46
158 0.00 3.10 0.00 29.51 2.00 0.00 0.07884 5.50 1.616
159 0.00 3.70 0.00 30.86 2.067 90.92 ET 15.00 -0.260
SCHED 40 WET STEEL 120 8.69 0 20.50 1.356
159 0.00 3.70 0.00 30.86 2.00 0.00 0.12069 20.00 5.431
160 0.00 10.80 0.00 33.22 2.067 114.45 3ET 25.00 -3.074
SCHED 40 WET STEEL 120 10.94 0 45.00 2.357
161 0.00 14.50 0.00 29.79 2.00 0.00 0.00674 9.50 0.131
162 0.00 14.50 0.00 29.93 2.067 24.06 T 10.00 0.000
SCHED 40 WET STEEL 120 2.30 0 19.50 0.131
162 0.00 14.50 0.00 29.93 2.00 0.00 0.02434 7.50 0.426
163 0.00 14.50 0.00 30.35 2.067 48.18 T 10.00 0.000
SCHED 40 WET STEEL 120 4.61 0 17.50 0.426
163 0.00 14.50 0.00 30.35 2.00 0.00 0.05181 7.50 0.907
164 0.00 14.50 0.00 31.26 2.067 72.46 T 10.00 0.000
SCHED 40 WET STEEL 120 6.93 0 17.50 0.907
245 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 47
165 0.00 14.50 0.00 29.59 2.00 0.00 0.00647 11.50 0.204
166 0.00 14.50 0.00 29.79 2.067 23.54 2ET 20.00 0.000
SCHED 40 WET STEEL 120 2.25 0 31.50 0.204
166 0.00 14.50 0.00 29.79 2.00 0.00 0.02385 7.50 0.417
167 0.00 14.50 0.00 30.21 2.067 47.64 T 10.00 0.000
SCHED 40 WET STEEL 120 4.55 0 17.50 0.417
167 0.00 14.50 0.00 30.21 2.00 0.00 0.05108 7.50 0.894
168 0.00 14.50 0.00 31.11 2.067 71.91 T 10.00 0.000
SCHED 40 WET STEEL 120 6.88 0 17.50 0.894
169 0.00 14.50 0.00 31.61 3.00 0.00 0.03840 4.50 1.153
170 0.00 12.70 0.00 33.54 3.068 188.81 ET 25.52 0.779
SCHED 40 WET STEEL FBE
130 8.19 0 30.02 1.932
LINED
108 0.00 14.50 0.00 30.47 2.00 0.00 0.08720 8.50 2.049
171 0.00 14.50 0.00 32.52 2.067 96.01 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.18 0 23.50 2.049
112 0.00 14.50 0.00 30.58 2.00 0.00 0.08643 8.50 1.945
171 0.00 14.50 0.00 32.52 2.067 95.55 2FT 14.00 0.000
SCHED 40 WET STEEL 120 9.14 0 22.50 1.945
246 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 48
104 0.00 10.80 0.00 33.21 2.00 0.00 0.17507 2.00 2.101
172 0.00 12.70 0.00 34.48 2.067 139.94 T 10.00 -0.823
SCHED 40 WET STEEL 120 13.38 0 12.00 1.278
171 0.00 14.50 0.00 32.52 3.00 0.00 0.03944 4.50 1.184
172 0.00 12.70 0.00 34.48 3.068 191.56 ET 25.52 0.779
SCHED 40 WET STEEL FBE
130 8.31 0 30.02 1.963
LINED
121 0.00 14.50 0.00 31.06 2.00 0.00 0.08878 6.50 1.909
173 0.00 14.50 0.00 32.97 2.067 96.95 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.27 0 21.50 1.909
126 0.00 14.50 0.00 31.44 2.00 0.00 0.12753 2.00 1.530
173 0.00 14.50 0.00 32.97 2.067 117.91 T 10.00 0.000
SCHED 40 WET STEEL 120 11.27 0 12.00 1.530
117 0.00 3.70 0.00 32.72 2.00 0.00 0.12768 21.00 5.873
174 0.00 14.50 0.00 33.92 2.067 117.99 3ET 25.00 -4.676
SCHED 40 WET STEEL 120 11.28 0 46.00 1.197
173 0.00 14.50 0.00 32.97 3.00 0.00 0.04877 2.00 0.946
174 0.00 14.50 0.00 33.92 3.068 214.86 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 9.32 0 19.40 0.946
LINED
136 0.00 14.50 0.00 32.58 2.00 0.00 0.09198 8.10 2.125
175 0.00 14.50 0.00 34.70 2.067 98.82 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.45 0 23.10 2.125
140 0.00 14.50 0.00 32.33 2.00 0.00 0.09119 11.00 2.371
175 0.00 14.50 0.00 34.70 2.067 98.36 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.40 0 26.00 2.371
132 0.00 10.80 0.00 35.32 2.00 0.00 0.18442 2.00 2.213
176 0.00 12.70 0.00 36.71 2.067 143.93 T 10.00 -0.823
SCHED 40 WET STEEL 120 13.76 0 12.00 1.390
175 0.00 14.50 0.00 34.70 3.00 0.00 0.04161 4.00 1.228
176 0.00 12.70 0.00 36.71 3.068 197.18 ET 25.52 0.779
SCHED 40 WET STEEL FBE
130 8.56 0 29.52 2.008
LINED
150 0.00 14.50 0.00 32.11 2.00 0.00 0.09140 8.00 2.102
177 0.00 14.50 0.00 34.21 2.067 98.48 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.42 0 23.00 2.102
247 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 49
154 0.00 14.50 0.00 31.96 2.00 0.00 0.09020 10.00 2.255
177 0.00 14.50 0.00 34.21 2.067 97.78 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.35 0 25.00 2.255
146 0.00 10.80 0.00 34.09 2.00 0.00 0.17921 4.00 2.509
178 0.00 14.50 0.00 35.00 2.067 141.71 T 10.00 -1.602
SCHED 40 WET STEEL 120 13.55 0 14.00 0.907
177 0.00 14.50 0.00 34.21 3.00 0.00 0.04125 1.55 0.782
178 0.00 14.50 0.00 35.00 3.068 196.26 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 8.52 0 18.95 0.782
LINED
164 0.00 14.50 0.00 31.26 2.00 0.00 0.08906 8.00 2.048
179 0.00 14.50 0.00 33.31 2.067 97.11 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.29 0 23.00 2.048
168 0.00 14.50 0.00 31.11 2.00 0.00 0.08808 10.00 2.202
179 0.00 14.50 0.00 33.31 2.067 96.54 ET 15.00 0.000
SCHED 40 WET STEEL 120 9.23 0 25.00 2.202
160 0.00 10.80 0.00 33.22 2.00 0.00 0.17511 4.00 2.452
180 0.00 14.50 0.00 34.07 2.067 139.95 T 10.00 -1.602
SCHED 40 WET STEEL 120 13.38 0 14.00 0.849
179 0.00 14.50 0.00 33.31 3.00 0.00 0.04024 1.55 0.763
180 0.00 14.50 0.00 34.07 3.068 193.65 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 8.40 0 18.95 0.763
LINED
170 0.00 12.70 0.00 33.54 3.00 0.00 0.10651 2.00 2.066
181 0.00 12.70 0.00 35.61 3.068 327.72 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 14.22 0 19.40 2.066
LINED
172 0.00 12.70 0.00 34.48 3.00 0.00 0.10879 2.00 2.111
182 0.00 12.70 0.00 36.59 3.068 331.50 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 14.39 0 19.40 2.111
LINED
181 0.00 12.70 0.00 35.61 4.00 0.00 0.02836 11.50 0.984
182 0.00 12.70 0.00 36.59 4.026 327.72 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 8.26 0 34.70 0.984
LINED
174 0.00 14.50 0.00 33.92 3.00 0.00 0.10961 4.50 2.784
183 0.00 12.70 0.00 37.48 3.068 332.85 FT 20.90 0.779
SCHED 40 WET STEEL FBE
130 14.45 0 25.40 3.564
LINED
248 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 50
182 0.00 12.70 0.00 36.59 6.00 0.00 0.01405 12.00 0.885
183 0.00 12.70 0.00 37.48 6.065 659.22 2FT 51.04 0.000
SCHED 40 WET STEEL FBE
130 7.32 0 63.04 0.885
LINED
176 0.00 12.70 0.00 36.71 3.00 0.00 0.11470 1.50 2.168
184 0.00 12.70 0.00 38.88 3.068 341.11 T 17.40 0.000
SCHED 40 WET STEEL FBE
130 14.80 0 18.90 2.168
LINED
183 0.00 12.70 0.00 37.48 6.00 0.00 0.02992 12.00 1.400
184 0.00 12.70 0.00 38.88 6.065 992.07 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 11.02 0 46.80 1.400
LINED
180 0.00 14.50 0.00 34.07 3.00 0.00 0.11007 8.50 5.532
185 0.00 12.70 0.00 40.38 3.068 333.60 3ET 41.76 0.779
SCHED 40 WET STEEL FBE
130 14.48 0 50.26 6.312
LINED
178 0.00 14.50 0.00 35.00 3.00 0.00 0.11276 8.00 5.611
186 0.00 12.70 0.00 41.39 3.068 337.98 3ET 41.76 0.779
SCHED 40 WET STEEL FBE
130 14.67 0 49.76 6.390
LINED
185 0.00 12.70 0.00 40.38 4.00 0.00 0.02930 11.10 1.005
186 0.00 12.70 0.00 41.39 4.026 333.60 T 23.20 0.000
SCHED 40 WET STEEL FBE
130 8.41 0 34.30 1.005
LINED
184 0.00 12.70 0.00 38.88 6.00 0.00 0.05169 8.50 3.078
187 0.00 12.70 0.00 41.96 6.065 1333.17 2FT 51.04 0.000
SCHED 40 WET STEEL FBE
130 14.81 0 59.54 3.078
LINED
186 0.00 12.70 0.00 41.39 6.00 0.00 0.01454 4.50 0.571
187 0.00 12.70 0.00 41.96 6.065 671.58 T 34.80 0.000
SCHED 40 WET STEEL FBE
130 7.46 0 39.30 0.571
LINED
187 0.00 12.70 0.00 41.96 8.00 0.00 0.02888 22.00 2.411
188 0.00 16.80 0.00 42.59 7.981 2004.75 ET 61.50 -1.775
SCHED 40 WET STEEL FBE
130 12.86 0 83.50 0.636
LINED
188 0.00 16.80 0.00 42.59 8.00 0.00 0.02888 17.50 2.316
189 0.00 9.80 0.00 47.94 7.981 2004.75 3E 62.70 3.031
SCHED 40 WET STEEL FBE
130 12.86 0 80.20 5.347
LINED
249 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 51
189 0.00 9.80 0.00 47.94 8.00 0.00 0.02888 76.50 5.227
190 0.00 3.00 0.00 56.11 7.981 2004.75 5E 104.50 2.944
SCHED 40 WET STEEL FBE
130 12.86 0 181.00 8.172
LINED
190 0.00 3.00 0.00 56.11 8.00 0.00 0.02888 15.50 3.428
191 0.00 0.00 0.00 60.84 7.981 2004.75 2E2GC 103.20 1.299
SCHED 40 WET STEEL FBE
130 12.86 0 118.70 4.727
LINED
191 0.00 0.00 0.00 60.84 8.00 0.00 0.02888 36.50 2.261
192 0.00 -2.00 0.00 63.97 7.981 2004.75 2E 41.80 0.866
SCHED 40 WET STEEL CEMENT
130 12.86 0 78.30 3.127
LINE
Fitting Legend: F = 45 Degree Elbow, E = 90 Degree Elbow, L = Long Turn Elbow, T = Tee or Cross, B = Butterfly Valve, G = Gate
Valve, C = Check Valve
250 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 52
251 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 53
252 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 54
253 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 55
254 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 56
255 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 57
Sprinkler Summary
Sprinkler System Type: Dry
Specified Area Of Application: 3820.00 ft²
Adjusted Area Of Application: 4966.00 ft²
Minimum Desired Density: 0.250 gpm/ft²
Application Average Density: 0.525 gpm/ft²
Application Adjusted Density (not required by NFPA 13): 0.404 gpm/ft²
Application Average Area Per Sprinkler: 45.48 ft²
Adjusted Area Per Sprinkler (not required by NFPA 13): 59.12 ft²
Sprinkler Flow: 2004.75 gpm
Average Sprinkler Flow: 23.87 gpm
256 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
Jacobs ZATE UPGRADE HYDROPROCESSING INTEGRITY-RR
Al-Khobar, 31952 Page 58
200
180
160
146
140
Pressure psi
120
100
100
80
60
40
30
20
0
20 40 60 80 100 120 140 160 180 200
Flowrate(x100) gpm
257 of 342
C:\ ...\Z12 Train A - Exchangers - Area G.fiw Tuesday, January 15, 2019, 8:26 AM
8
3
5
.-
L
E
192 0
3
15
TIE-IN
D
P
N
"
12
0
3
15
8
3
5
.-
L
E
8
"
N
P
8 D
TIE-IN 0
0
0
8
3
5
.-
L
E
E
L
.9
10
8
"
N
P
910
3 D
8
10
A 0
/G 6
5
U 2
/G
8
191 D
V
"
N
538
P
5 D
10
0
2073
E
L
.2
9
8
0 3
5
190 17
2
7
5
0
0
5
5
11
E
L
.2
9
8
3
16
0
0
16
189 0
0
2127
188
E
L
.5
11
0
E 0
N
P
D
L
.4
4
11
81 5
3
" 0
8 5 15
4 6
173
5 3
0
9
15
2
10
0
9
165 82
77 5
2
7
11 0
3 15 8
E 2
1" NPD
L 4
.4 7
4
Z12-E-2A6 83
1" NPD
11
173
173
4
6
5
0
8
2
71 11
2
2
1" NPD
3 0
0
2 78
173
4
0
166
1" NPD
0
84
173
161
658
2 0
" 8
N 2
1" NPD
P
2 D
2
11 167 0
0
173
3
2
2
162
0
0 79
1" NPD
173
67 7
72 1"
15
2
N 2
19 15 PD 11
E
L
.4 3 8 3 168
1" NPD
3 6 2
722
1" NPD
8
4 5 .9
11
E
L 2
" 80 N
P
D
173
188
N
1" NPD
5 P " 0
2
1" NPD
289
5
9
4 5 D
163 2
173
6 3 14
68 2
173
40
5 0
12 0
5
" 3
9 73 3 8
17
3 8
125
15 8 5 6
2 0 18 7
7
0 0 2
63 5 3
155 Z12-E-2A6 15 8
776
3 3
0 D
180
355
8 5
151 5
0 8
2 "
N
P
0 13
5
6
164 2
9
15
E
L
.4
E 2
2 15
16 156 179 7
6
L
.4 69 74 6
2" NPD
152
1111
4
1" NPD
11 6
64 5
184
0
0 13
3
18 5
76
3" NPD
2
776
0 19 2
3 0
912
7 6 3 9
5
1" NPD
8
57 3
1" NPD
3 4 D
P
188
N
2 1" 56
173
4
0 75 160
1" NPD
0
Z12-E-2A5 70 2
4
184
5
53 147 8
270
5
6 .3
13 0 L
2 0 3 5 E
E 0
776
" 3
658
L 7
.4 0 N 3 2 .3 10
1" NPD
2 3 P " L
4 2 8 2 D N E
5
157
1" NPD
2
11 7
153 P 2
1" NPD
3 0 14 D 5
0 4
173
3 0 4
188
0 D
1" NPD
289
173
2
9
3 2 P
15 N
54 148
1913
0
173
40
0
65 2
"
0
0
185
1" NPD
11
184
6 9
0
206
2 15 8 15
2 3
18 5
17
3
2 0
58
1"
N 3
7 154 14
7 159
9
2 137 5
0 8
8
2
15 PD
3 3
0
3
158
5
D
E 6
.9 66 D 3 P
722
L 2 P
185
L " N 8 N
1" NPD
.4 6
N 1" 48
1" NPD
"
4 49 15 E
149 P 2 5
0
173
16 D 13
188
2
184
11 6 5 2 14
0 5 0
3
15
2
138 55 12
5
3 0
" 3
E
L
.9
2
0
59 Z12-E-2A5 3 8
1" NPD
8
148 144
0 5 3 8
50 6
17
5
18
173
125