REV. 1
E14005 CB3-EC-70-MT-001-A4
TABLE OF CONTENT
1 GENERAL................................................................................................................. 4
1.1 Introduction ..................................................................................................... 4
1.2 Scope ............................................................................................................. 4
1.3 Definition ........................................................................................................ 4
1.4 References ..................................................................................................... 5
2 BILL OF QUANTITY (ATTACHMENT) ..................................................................... 5
1 GENERAL
1.1 Introduction
PT. PERTAMINA (Persero) Direktorat Pemasaran dan Niaga intends to build new pipeline
CB-III Lomanis, Central Java – Tasikmalaya, West Java ± 126.25 km. This new pipeline of
CB-III will be installed parallel with the existing pipeline of CB-I. The purpose of the
construction for the new pipeline of CB-III Lomanis – Tasikmalaya is to accommodate the
demand increasing of BBM i.e. Premium, Pertamax, Solar (diesel fuel), and Pertamina Dex
to the customers until the next 20 (twenty) years. Meanwhile, the existing pipeline of CB-I
has life cycle 38 (thirty eight) years beyond the proper life cycle 20 (twenty) years so that it
causes the decreasing of reliability and security of supply being indicated by 38 (thirty
eight) leaks and public facilities on this pipeline.
1.2 Scope
This scope is covering the quantity of equipment for process safety within the Lauching
Station in Terminal BBM Lomanis, Central Java and the Receiving Station in Terminal BBM
Tasikmalaya, West Java for new pipeline CB-III Lomanis, Central Java – Tasikmalaya,
West Java of PT. PERTAMINA (Persero). The contents herein are developed and
described more detail in detail engineering design stage by Contractor.
1.3 Definition
Definitions used in this document will not violate other definitions used in other documents
which is:
PT. Pertamina (Persero) Direktorat Pemasaran &
Company :
Niaga, the owner of the Project FEED Pipanisasi CB-
III (Ex. CB-I) Lomanis – Tasikmalaya.
PT. Erraenersi Konstruksindo (ENERKON), appointed
Consultant :
by Company to execute and to complete overall
works for FEED Pipanisasi CB-III (Ex. CB-I) Lomanis
– Tasikmalaya.
Contractor : All Contractors to be appointed by company.