You are on page 1of 5

JOB NO. DOCUMENT NO.

REV. 1
E14005 CB3-EC-70-MT-001-A4

DATE 08 Jun 2015 PAGE 1 OF 5

MTO FOR PROCESS SAFETY

JASA KONSULTANSI FEED PIPANISASI CB-III (Ex. CB-I)


LOMANIS – TASIKMALAYA

DIREKTORAT PEMASARAN & NIAGA


PT. PERTAMINA (PERSERO)
2015

1 08 Jun 2015 Issued For Bid DIC AFN DK


0 20 May 2015 Issued For Approval DIC AFN DK

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED CLIENT


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) Lomanis – Tasikmalaya
REVISION HISTORICAL SHEET

Rev No. Date Page Description

0 20 May 2015 Issued for Approval


1 08 Jun 2015 Issued for Bid

Doc. No. CB3-EC-70-MT-001-A4 Page 2 of 5 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) Lomanis – Tasikmalaya

TABLE OF CONTENT

1 GENERAL................................................................................................................. 4
1.1 Introduction ..................................................................................................... 4
1.2 Scope ............................................................................................................. 4
1.3 Definition ........................................................................................................ 4
1.4 References ..................................................................................................... 5
2 BILL OF QUANTITY (ATTACHMENT) ..................................................................... 5

Doc. No. CB3-EC-70-MT-001-A4 Page 3 of 5 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) Lomanis – Tasikmalaya

1 GENERAL
1.1 Introduction
PT. PERTAMINA (Persero) Direktorat Pemasaran dan Niaga intends to build new pipeline
CB-III Lomanis, Central Java – Tasikmalaya, West Java ± 126.25 km. This new pipeline of
CB-III will be installed parallel with the existing pipeline of CB-I. The purpose of the
construction for the new pipeline of CB-III Lomanis – Tasikmalaya is to accommodate the
demand increasing of BBM i.e. Premium, Pertamax, Solar (diesel fuel), and Pertamina Dex
to the customers until the next 20 (twenty) years. Meanwhile, the existing pipeline of CB-I
has life cycle 38 (thirty eight) years beyond the proper life cycle 20 (twenty) years so that it
causes the decreasing of reliability and security of supply being indicated by 38 (thirty
eight) leaks and public facilities on this pipeline.
1.2 Scope
This scope is covering the quantity of equipment for process safety within the Lauching
Station in Terminal BBM Lomanis, Central Java and the Receiving Station in Terminal BBM
Tasikmalaya, West Java for new pipeline CB-III Lomanis, Central Java – Tasikmalaya,
West Java of PT. PERTAMINA (Persero). The contents herein are developed and
described more detail in detail engineering design stage by Contractor.
1.3 Definition
Definitions used in this document will not violate other definitions used in other documents
which is:
PT. Pertamina (Persero) Direktorat Pemasaran &
Company :
Niaga, the owner of the Project FEED Pipanisasi CB-
III (Ex. CB-I) Lomanis – Tasikmalaya.
PT. Erraenersi Konstruksindo (ENERKON), appointed
Consultant :
by Company to execute and to complete overall
works for FEED Pipanisasi CB-III (Ex. CB-I) Lomanis
– Tasikmalaya.
Contractor : All Contractors to be appointed by company.

Third Party Inspector : A third party inspector to be appointed by company to


inspect the works of Contractor.

Site : The right-of-way and places provided by company


where the construction works are to be executed and
any other places as may be specifically designated in
the Contract as forming part of the Site.

Issuer : The person / party who develop and release the


document and correspondence.

Project Documents : All documents which are prepared, revised, and


issued for accelerating the project execution, such as
correspondence, drawings, specifications, requisitions,
purchase orders, vendor prints, etc.

Doc. No. CB3-EC-70-MT-001-A4 Page 4 of 5 Rev.1


Jasa Konsultansi FEED Pipanisasi CB-III (Ex. CB-I) Lomanis – Tasikmalaya
1.4 References
PROJECT DOCUMENTS
CB3-EC-70-SP-001-A4 : Specification of Fire Protection System
CB3-EC-70-DG-001-A3 : Preliminary Layout of Fire Protection Equipment Lomanis-
Tasikmalaya
CB3-EC-70-DG-002-A3 : Preliminary Layout of Fire Detection & Alarm System for
Launching & Receiving Facility & Pumping Area
OTHER REFERENCE
NFPA 10 : Standard for Portable Fire Extinguisher
NFPA 12 : Standard on Carbon Dioxide Extinguishing
System

2 BILL OF QUANTITY (ATTACHMENT)

Doc. No. CB3-EC-70-MT-001-A4 Page 5 of 5 Rev.1