BIDDER PRICE ESTIMATE GENERAL SUMMARY

Date:
Project Location:
Project Name:
Bidder Name:

Item Description Unit Price Qty. Required Estimated Tons Total Comments
($) ($)
1.00 Project SOW
1.01 Labor 0
1.02 Travel 0
1.03 Site Living Expenses 0
1.04 Material 304L SS 0
1.05 Material Carbon Steel 0
1.06 Consumables 0
1.07 Equipment Field Rental 0
1.08 Demolition 0
1.09 Installation 0
1.10 Scaffolding 0
1.11 Insulation Installation 0
1.12 Supervision and Project Management 0
1.13 Freight Cost to Jobsite 0
1.14 Insurance, Performance Bond, other. 0
1.15
1.16
2.00 Options/Additional SOW
2.01 0
2.02 0
2.03 0
2.04 0
2.05
2.06
3.00 Service Work Daily and Hourly Rates
3.01 Attached Rate Sheet with Proposal
3.02
3.03
4.00 Terms and Payments
4.01 To provide specific details of terms. Payment Terms
4.01
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.13
5.00 Project General Timeline
5.01 Date of Award/NTP (Notice to Proceed)
5.02 Material Procurement
5.03 Shop Fabrication
5.04 Submittal of Deliverables:
5.05 Schedule
5.06 PEP Manual
5.07 Safety Manual
5.08 QA/QC Plan and ITP Shop Fabrication
5.09 Site Mobilization
5.10 Other as per bidder
5.11
5.12
NOTES/OTHER: