Williams
PROJECT: Calvary Cemetery DATE CHECKED: 12/10/2017 DATE: 12/07/2017
DETAIL: Storm/Roof Drain CHECKED BY: H. Green PAGE NO.: 1
P
Possible
ibl flow
fl rate
t through
th h pipe,
i Q,
Q cfs
f --> Q = V*A
Location Design Flow Combined Flow Length Nominal Area (sf) Area (sf)
cfs cfs Pipe Size Impervious Pervious Weighted C
Yard Inlet 1 to 2 0.37 0.37 57.00 6 1300 2065 0.55
Yard Inlet 2 to 3 0.37 0.75 66.00 8 1300 2065 0.55
Yard Inlet 3 to CO 0.73 1.48 68.00 10 3600 700 0.84
CO to MES 0.00 1.48 71.00 10 0 0
Flow: Q=CiA
C = 0.3 (pervious)
C= 0.95 (impervious)
i(10 year/24 hour)= 8.76 in/hr