Architects in construction plays an important role and they are responsible for visual
appearance of the buildings and structures before final structural design.
Architect is a person appointed by the client, who develops a facility as per the design
concept and the requirements specified by the client. The architects develop design that
are more creative in aesthetics.
The architect makes use of vision and creative ideas to satisfy the client. But the design
evolved by the architects have to satisfy with the building laws and the regulations of the
state.
An edifice is designed by the architect that will satisfy the client. The architect brings
more of creativity and artistic elements on the building. This creation of design will be
repeated till both the parties i.e. the client and the designer are satisfied.
Most of the cases the architects have to work with the civil or structural engineers for
communication and discussion relating the technical issues faced in the design and the
implementation.
o Quantifying and qualifying the project will involve the discussion about the expected budget, the
characteristics of the site and other planning regulation of the area under consideration.
o Next is the difference sequence of operations, guarantees, and responsibilities offered by the
architect. This will include:
o Suggesting and studying all possible solutions if the work is renovation or rehabilitation or a
new construction
o Procedures planned and prepared are kept in line to make communication easier.
This early submission of drawings helps in avoiding the delaying of the project. The
drawings are the basis on which detailed estimation, material procurement and work at
site is carried out.
Initially, the sketch designs are prepared which will shows the building location. This
gives an idea about the layout of different spaces within and nearby as well as different
links to the sit. The overall massing and the appearance of the project too is reflected on
the sketch design.
The sketch design is the basis on which the client agrees to certain principles and
agreements. The end of sketch design will follow the contract proposal that will move to
the next phase of cost estimation and the timescale of the project.
The construction of a building or a structure is now performed by both the architect and a
civil engineer provided they have adequate experience and skill. The different drawings
an architect can render will include the floor plan, the site plan, the elevation and the
isometric vies, Other detailed structural drawings, 3D models and 3D views.
Mainly these works or details provided by the architect will depend on the work provided
to him. Sometimes there comes situations where we have a structural designer to design
the plan and the structural building.
We need to have a good elevation for the given plan. Here, we will approach the architect
to deal with the front elevation and the landscaping details. This will hence ask for
cooperation and discussion between the engineer and the architect.
The architects do have an important role in visualizing top to down of the whole building
structure, that results in emerging with new ideas and designs. This brings difficulty in
their implementation without the help of engineers and without understanding the
practicality of construction.
Hence, the greatest challenge or the responsibility of the architect is not to underestimate
the cost of materials and the construction time. This point helps in bringing out effective
cost estimation.
The extent and details of cost estimation conducted by the architect too is dependent on
the extent of work is carrying out. If the client is completely providing the project over to
him, where the engineers comes later or under, the complete construction estimation is
performed by the architect.
Now, if the architect is placed only for the façade improvement or for landscaping
modeling and implementation, he brings a cost estimation for the same.
The activity of contract agreement must be transparent and fair. The architects have role
in suggesting and choosing the contractors for different activities of construction.
After receiving the tender, the architect carries out a tender analysis report. These results
are compared with the client’s expectations and budget.
What type of work the architect is engaged is based on the contract agreement. Most of
the project, the architect takes in hand with civil structural engineers is to move the
construction. Huge construction will of course demand somebody with huge technical
knowledge to know about the stability and strength factors.
The contract with the architect by the client will decide what trade the architect must
focus on. Based on the demand the architect will coordinate the construction activity as
per the standard codes and regulations.
The architect has the role of checking the invoices at the month end to check the payment
requested is corresponding to the completed works at the site.
The design to the construction process also includes the following responsibilities for the
architect:
o The design can be redesigned if necessary. This can also bring change to the scope in order to
satisfy any rules or regulations
o Certification to know that the work has been completed in the correct manner
The role of architect from the construction process to the maintenance will insist the
architect to handover an owner’s manual that will have recommendations for the future
maintenance and repairs.
It is not a practice everywhere, but there are architects who offers such a facility. The
architect has to be contacted in future if any issues arise, and it’s the duty of the architect
to be available when needed.
https://theconstructor.org/construction/architects-roles-responsibilities-construction/18511/
https://www.slideshare.net/clairey97/the-role-of-an-architect-56059478?qid=c6388e46-3f9a-41f6-
a2eb-873089558c83&v=&b=&from_search=6