FOR
INDEX
1.1.1 Purpose:-
To describe the procedure for carring out the installation of Access Fitting with
Solid Plug and Hallow Plug for Corrosion Monitering System work for detection
of level of corrosion inside pipeline at Daderi- bawana Project of GAIL ( India)
Ltd. And provide adequate Quality Assurence / Control of workmanship and
inspection at site.
1.1.2 Scope:-
This procedure covers the method for Installation of Access Fitting with Solid
plug and Hollow Plug.
1.1.4 Procedure:-
Care should be taken during Loading/ unloading of CMS material against falling/
damage of tools and injury to the person who is handling the material .
Making of bore to pipeline should be in line with diameter provided i.e. 1.75”.
Care should be taken while alignment of Access Fitting on bore by considering its
curvature.
Proper welding of well as outside threat of access fitting should be cleaned after
welding.
Care should be taken while screwing up the solid plug and hollow plug.
1.2.1 Pupose:-
To describe the procedure for carring out the installation of Corrosion Coupon for
Corrosion Monitoring System work for detection of level of corrosion inside pipeline at
Daderi- bawana Project of GAIL ( India) Ltd. And provide adequate Quality Assurence /
Control of workmanship and inspection at site.
1.2.2 Scope:-
1.2.3 Procedure:-
1.2.4 Precaution:-
Care should be taken during handling of Retrieval Tool and Service Valve as these
are heavy tools the material .
Ensure that the bleeding valve are closed while starting the starting the procedure
of installation.
Care should be taken while alignment of Retrieval Tool and Service Valve.
Care should be taken while screwing up the solid plug and hollow plug.
1.3.1 Purpose:-
To describe the procedure for carrying out the installation of ER Probe for
Corrosion Monitoring System work for detection of level of corrosion inside
pipeline at Daderi- bawana Project of GAIL ( India) Ltd. And provide adequate
Quality Assurance / Control of workmanship and inspection at site.
1.3.2 Scope:-
1.3.3 Procedure:-
1.3.4 Precaution:-
Care should be taken during handling of Retrieval Tool and Service Valve as these
are heavy tools.
Ensure that the bleeding valve are closed while starting the starting the procedure
of installation.
Care should be taken while alignment of Retrieval Tool and Service Valve.
Care should be taken while screwing up the solid plug and hollow plug.
1.4.1 Purpose:-
To describe the procedure for carrying out the installation of Corrosion Coupon for
Corrosion Monitoring System work for detection of level of corrosion inside pipeline at
Daderi- bawana Project of GAIL ( India) Ltd. And provide adequate Quality Assurance /
Control of workmanship and inspection at site.
1.4.2 Scope:-
.
1.4.3 Equipment / Tools Required:-
Sr. No. Material/ Tools Application/ Purpose
1. Hollow Plug To fix the ER Prove.
2. Tool Box Required tool for fixing the
Allen nut and coupon.
3. Service Valve To blind the Access fitting
4. Retrieval Tool To install Corrosion coupon
1.4.4 Procedure:-
1.4.5 Precaution:-
Care should be taken during handling of Retrieval Tool and Service Valve as these
are heavy tools.
Ensure that the bleeding valve are closed while starting the starting the procedure
of installation.
Care should be taken while alignment of Retrieval Tool and Service Valve.
Care should be taken while screwing up the solid plug and hollow plug.
1.4.6 Quality Assurance:-
1.5.1 Purpose:-
To describe the procedure for laying of Corrosion Monitoring system works for detection
of level of Corrosion inside pipeline at Daderi- bawana Project of GAIL ( India) Ltd.
1.5.2 Scope:-
This procedure covers the method for Laying of Cable for ER Probe.
1.5.4 Procedure:-
1.5.5 Precaution:-
Care should be taken during laying of cable that it should not be cut any place.
The cable termination should be done by electrician.
1.6.1 Purpose:-
1.6.2 Scope:-
This procedure covers the method for Installation, Testing and Commissioning of
Corrosion Monitoring System.
1.6.4 Procedure:-
The installation, Testing and Commissioning of the CMS system should be done
by us and under the supervision of our Corrosion Engineer.
1.6.5 Precaution:-
The installation, Testing and Commissioning of the CMS system should be done
under the supervision of our Corrosion Engineer.