On 27 May 2019, Community Development visited TK Angkasa Sri Bintan as a follow up of
visit request from the school party. Community Development met bapak Aloysius Sugimin, Facility Coordinator, teacher of TK, and one TNI staff.
TK Angkasa Building
The result of the site visit is:
1. TK Angkasa has two main building. The first building is functioned as the main class and the other one is functioned as playground activity. 2. The building used for playground activity is not in proper condition where it has no wall and ceiling. It causes rain water bias enter the room and make the floor wet. 3. The two main building are not connected with canopy make it difficult to cross when it rains hard. 4. Some parts of the school area are not fenced off. This may cause students to trespass the school border while they are playing around. Main Classes / Main building (Office included) Building for Playground Activity School area which needs fence installation
The school proposes the following things:
1. PT BRC helps renovating the playgroung by providing the ceiling or wall or some kind of things to prevent water bias. 2. PT BRC provides fence installation in some school parts 3. PT BRC provides canopy to connect two buildings
Follow up for the visit:
1. The renovation of the playground is urgent so that it is about to be fixed first 2. Make a budget estimation of renovation 3. Seek management approval for the renovation