JOB CONTROL 2011

PRIORIT
SERIAL JOB NO DATE MACHINE NO LINE LIMIT DAY CRAFT DESCRIPTION
Y

1/1/2011 1/7/2011 Clean out the accumelated dust and material beside blower also old
4 4 361.070 Line'I' B P belt and wood on the room.

6 6 1/1/2011 361.080 Line'I' B 1/7/2011 P Clean out the accumelated material under fan for air slide.

1/1/2011 1/7/2011 Remove the accumelated material over CF Silo and around the
7 7 361.030 Line'I' B P filter 361.020 .

clean out the material accumelated between the belt convayor and
43 43 1/5/2011 481.300 Line'I' A 1/5/2011 P the concrete building of additives hopper to prevent the belt
damage.
Clean out the accumelated material around the belt and under the
66 66 1/8/2011 481BC610 Line'II' B 14/1/2011 P feeding chutes to prevent material accumelation and stacking at the
iddlers.

1/16/2011 1/20/2011 Relining the exposed area front roller No 1,3 also under air seal
116 116 341.020 Line'I' B P tube by denist casting.

1/16/2011 1/22/2011 Clean and remove all the accumelated and participated
128 128 481SL100 Line'II' B P materialabove the clinker silo.

Clean and remove the accumelated and participated material and


133 133 1/16/2011 761.010 Line'I' B 1/22/2011 P mud which serrounding and over the external grill causes
decreases in Cooling efficiency.

1/20/2011 1/26/2011 Clean out the accumelated material between ladder for sand
173 173 312BC200 Line'II' B P 312BC200,312BC300

191 191 1/21/2011 133.060 Line'I' B 1/23/2011 P Remove material at that Bc 5m after the chute that block the way

1/23/2011 1/29/2011 10 gas nozzles for PC with hoses and connection to replace the oil
206 206 431.100 Line'I' B P nozzle in both line I,II .
STATUS

Finished

Finished

Finished

Finished

Finished

Finished

Finished

Finished

Finished

Finished