You are on page 1of 17

NEBOSH International General Certificate

In Occupational Health and Safety

UNIT IGC3: HEALTH AND SAFETY PRACTICAL


APPLICATION

Student Name: TRIMURTHULU KAKI

Student Number: 00332912

Date of Submission:
APPENDIX 1

GC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment i.e. The completed
observation sheets and the report to management, is my own work. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in
the NEBOSH Malpractice policy.

Name (Print) ___________________________________

Signature ____________________________________

Date ____________________________________

For completion by a course provider representative (eg internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to the
penalties set out in the NEBOSH Malpractice policy.

Name (Print) ____________________________________

Signature ____________________________________

Date ____________________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I
recognise that contravention of this statement constitutes malpractice and may result in my being
subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) ____________________________________

Signature ____________________________________

Date ____________________________________

NB: This declaration must be completed in full, submitted and retained with the candidate’s
script. If this declaration is not submitted the candidate’s result may be declared void.
APPENDIX 3

GC3 – THE HEALTH AND Assessor’s marking sheet


SAFETY PRACTICAL APPLICATION

Date of practical application Name of assessor

Course provider Course provider


number name

Student number 00332912 Student name TRIMURTHULU KAKI

NEBOSH
Maximum Assessor’s
moderated
Criteria marks marks
marks
available awarded
(if different)

1 Completion of observation sheets

Range and outline of hazards and


1.1 15
consequences
Identification of suitable control measures and
1.2 15
timescales
Report - Introduction and Executive
2
Summary
Introduction providing an overview of the
2.1 5
chosen area

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of legislation


3.2 5
and/or standards

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action
Recommendations which present realistic
4.2 actions to improve health and safety in the 15
chosen area

TOTAL MARKS 100


Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if
requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:


APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name ph____________________________________ Student number __________________

Place inspected _____________________________________ Date of inspection ___ / _____ / _____

Observations Control measures Timescale


Hazards and consequence Immediate and longer term actions
1. Fall of material, tools and persons Immediate action:
into the excavation of 10 feet depth To provide to provision of signage and One day
due to lack of edge protection causing authorized peoples only.
bone fractures to workers, head
injuries, cuts and bruises. Long term action:
To build the hydraulic shore on the One month
ditch of 10 feet sides to protects the
cave. And its protects the slip and trips
hazard for the employees

2. Fall of workers and objects from the Immediate action:


scaffold at a height of 30 meters due Provision of guard rails, toe boards, One day
the poor surface (uneven floor) and no securing tools, replace the platforms.
guard rail, outriggers broken, the One day
braces and toe boards have large Regular inspections.
gaps on the work platform causing
major head injuries and impact on the Long term action:
workers. All the scaffold materials purchase by One week
the component person and using all
the safety for scaffold erection.

Revise the risk assessments and One week


permits.

3. Failure and toppling of mobile crane Immediate action:


from the oil spillages and wet surfaces Regularly
in the construction site leading to Clean up spillages
collisions with workers and structures Cautions for wet floors and spillages
causing fatalities and property Pre use checks foe mobile cranes.
damage.
Long term action:
Every month
Maintenance of the equipment.
Competent operator.
Communication between all the
operators.
4.Severe back pains and Immediately action:
musculoskeletal disorders while To the supervisor are takes 1 day
workers carrying manually cement responsibility and instruct the worker
bags, bricks and sand causing hernia, carry the safe worker capability of
muscle cramps and slipped disc. load limit.
Long term action:
The organising recognised the
manually handling workers and how One month
to handle the manual workers
organisation training for all the
manual handling workers tell to the
manual techniques and maximum
weight that one can carry and
consequences if they exceed the
weight limits
5. In the construction site the workers Immediate action:
are handling concrete mixer without Provide respiratory protective 1 day
hopper. As a result workers inhale equipment.
cement and dust that may lead to Provide hopper for mixing
respiratory problems and Long term action: 4 weeks
asphyxiation. Conduct health surveillance
programme
12.In the ware house of Immediate action:
construction site Workers performing Perform unloading work in open 1 day
iron pipes unloading work in a place and then put in warehouse
awkward position ,this may cause
back pain ,prolapsed discs, injuries Long term action:
cuts etc. Make warehouse spacious by 3 days
maintaining good storage methods,
and provide place for loading and
unloading work.
13. I observed the workers in the
construction site were shouting each Immediate action:
other and they are blaming each Conduct counselling programme to 1day
other. Here the other workers disturb individuals.
and damage work because of loss of Long term action:
working time. Some workers may Introduce and maintain zero tolerance 1week
lead to stress. policy.
Check workers background during
recruitment time.

14. In the ware house of


construction site under poor lighting Immediate action:
workers needs to get construction To be provides a clear lighting in 1day
materials from the warehouse. Lack the ware house so that workers can
good lighting, workers may slips trips carry out work easily.
and may also falls inside the
warehouse, resulting injuries such as Long term action:
head injury, bone fracture, piercing of To providing natural lighting and 1 week
any sharp laid item on floor. regular house keeping

15. In the work site emergency fire Immediate action:


exit door has been obstructed with a To remove the obstruction objects 1 day
wooden material. Which can obstruct from the emergency fire exit door.
the walk or running in emergency
and that leads to severe injuries by Long term action:
fall and trips. Maintain good house keeping
And provide proper training and fire 2 weeks
drills.

16. I am observed in a Immediate action:


construction site area there are To stop the welding work 1 day
nearly 10 LPG gas cylinders are immediately and cover the area with
stored. And the worker are doing fire retracing materials. Take a gas
welding work on top of the cylinders. cylinders away from work site.
Here the welding sparks ejected are
falling on the gas cylinders. This Long term action:
may cause large fire and explosion The welding activities carry out by
that leads to third degree burn competent persons only.
injuries, and many people may lose Do the major parts of welding at
their lives also. Here not only separate place and assemble can be 10days
workers, but other people such as done at required area.
visitors, office workers and To give a training, instruction,
surrounding living propels also information and supervision properly.
injured.
17. In the construction site, at the Immediate action:
ground floor workers are working on Welding cords to be laid away from One day
to fit the lift. The work area is wet and wet conditions and to maintenance
water also. Here the welding activity good housekeeping.
performed in wet conditions to fix the
lift. Here the welding machine cord Long term action:
and power supply cables are laying The working area should be kept Within 1 day
on the wet floor can cause to clean and dry to be maintained by the
electrical shock and burns to maintenance staff and regular
workers. checking by competent person.

18. In the construction site Immediate action:


workers working with sand, bricks, To control the dust particles by the
cement and rocks, inhalation of dust water damping down. And using the
of these materials cause respiratory respirators. 1 day
problems and also cause skin
allergies. Long term action:
To be provided a well-ventilated
area and sufficient and suitable
personal protect equipment and 1 month
provide dust catch filter face masks
also provided.

19. In the construction site area Immediate action: Immediately


workers are doing electrical works on remove all trailing cables from the monthly
the 2nd floor , wires of equipment walking areas and positioned in
trailing on floor .By the trailing cables secure place.
there may be a chances of fall and
trip leading to bone fractures and Long term action:
head injuries To be provide a training and shows
a videos to workers about the 1 month
accidents relating to trailing cables.

20.In the construction site’s cellar Immediate action:


area the carpenter performing wood Add adjustable top guard fitted above 1 day
work of doors for building. The the blade and provide a suitable
carpenters using bench mounted PPE.
circular saw, the machine don’t have
any guard. And those peoples are Long term action:
working manual chopping of the To provide a proper training about
wood materials and it makes a lot of the bench mounted circular saw. And
noise and dust also, but they are not the properly inspection by the 2 weeks
using any ear protection, hand gloves competent person and routine
and face masks. Circular saw causes inspection.
cuts and severing

21 In the construction site Immediate action: 1day


workers are doing excavation around To stop the excavation work
the underground drainage to be 4 activities.
feet depth has no protected by
barriers and sign boards it may Long term action:
causes to falling people by slip, To provides barrier along with the 1week
topple of excavator. Peoples have excavation area. And provide
injured death to serious injury but not adequate training on safety practices
limited to bone breaks or factures. of excavation process and policy.
22. In the construction site area a Immediate action: 1 day
big generator realises lot of smoke. Workers are using suitable personal
Here the workers are effected by the protect equipment.
smoke, inhalation of smoke causes
respiratory problems, high blood Long term action:
pressure. To be build a smoke exist fans and 1 month
using local exhaust ventilation by
using filters and by using smoke
chimney or ducts. Good servicing
maintenance of generator.

23. In the work site worker are Immediate action:


painted outside of the building by Make surface flat and place sole Immediately
using scaffold. I am observed the boards
scaffold is not erected on the flat Provide with guard rails & toe boards
surface, worker are not using guard and make braces well fit
rails braces are not well fitted. There Long term action:
is no toe board’s .here the hazard is Alteration needed must be done by
collapse the scaffold due to improper competent person and do regular 1 month
fitting and may falls from objects inspection.
causes. The worker are not using
even PPE also.

24. In the construction site on the Immediate action:


1st floor the worker are polished by In the work activity area should be Immediately
the grinding. Here the workers are isolated and people should be
helpers are caused sparks are flying provided with face shield, coveralls.
and lead to eye injury and skin burns.
Long term action:
Training should be provided to 1 day
the workers on safe grinding activity.

25. In the construction site, near the Immediate action:


excavation area has main electric To be put a danger signage 1 day
power supply for the entire boards.
construction site. Here this area was
not protected and no signage of Long term action:
danger being placed that can lead to To be barricade the area from the
electrocution, burns, death and fall excavation by isolating lock out – tag
from height due to throw off can out system. 1 week
cause serious injury of bone fractures Require permit to work.
and head injuries.
26. In the construction site
organisation has provided locker Continue
facility for each and every one
separately for men and women.

27. Observed the first aid provisions It promotes recovery, prevents


were appropriate and accessible to deterioration and preserves life
the workers at the site with the during emergencies.
complete kit.

28. Provision of drinking water facility Good working atmosphere for


at each floor and clearly indicated employees and ability to work with
with sign boards and can easily moral.
access.

29. I am observed that each floor


have fire fighting lines, sprinklers and
smoke detectors. In the Warehouse
area maintained fire cylinders.

30. In the work site separate toilets


for men and women, and maintaining
neat & clean. Here the provision of
hand wash liquids, soaps,
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Structure report under the following headings:

Introduction including overview of area inspected and activities taking place

The above report follows the health and safety inspection in the biggest construction projects of
RUSHITA CONSTRUSTIONS. It is a real estate company in Visakhapatnam, Andhra Pradesh, India.
It is. Here the indoor and outdoor activities and storage of raw materials and marketing of the flats
Clients consultations, site visitors other peoples. In the construction the total number of worker is 70
peoples nearly and it is a 10 cores project. Here total 9 floors and 36 apartments. I am inspecting in
the work site areas warehouse and construction buildings at the time 10 am to 12 noon on 09-04-
2016.

The activities being performed are Workers are doing in the ground level excavation, Workers are
carrying manual handling by the raw materials, and Workers are doing outdoor activities such as
outside painting of the building by using scaffold and cherry picker and spray guns. In door activities
are welding at the lift fitting at a wet floor area by using power. Carpenters are working ground floor
doing wood work activities by using bench mounted circular saw without any guards. Near the
excavation beside the power supply transformer without any barricades and sign boards. Warehouse
indoor activities and safe stacking and storing of construction materials such as cement in the
warehouse and welding roads, bricks, and wood separate storage area. In the warehouse are
vehicles are loading and unloading and also taking reversing when the corners without stoppage and
without banks men and blind sports directions are not there. Worker are manual handling of carrying
cement and bricks construction materials. Poor lighting at the ware house and ventilation at the
cement storage area.

Some workers are using personal protect equipment, All the welfare facilities are provided. The site
engineer, managers and supervisors are doing her activities they are wearing different colours of
helmets, all the floor maintained fire fighting lines, fire cylinders sprinklers, smoke detectors.

This report is clearly inspection report to highlight the areas of construction site and existing health
and safety hazards and to reduce the accidents and incidents statistics, and minted of the health and
safety policy. To be minted safe system of work, safe plant and machinery, safe system of work
environment to be provided. To follow the minimum welfare facilities and reduced the accidents such
as “0” percentage accident, injuries and fatalities. And finally to check whether it meets the legal
standards.
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Executive Summary

I thanks to the RUSHITA construction for giving me the opportunity to carry out the health and safety
inspection. It’s appreciated that the construction site has good practices like

Drinking water facility at each floor level for employees hot and cold option according to the worker
need. Locker facility allocated for employees separately according to their needs and nearest to the
work place area workers easy to access. First aid appropriate and accessible to with workers at the
site with the complete kit. In this site each floor has minted fire fighting lines and sprinklers and smoke
detectors. Toilets have been maintained clean and tidy with all provision to the workers like soaps,
hand wash liquids etc.

In the construction site I am observed some major hazards. The management has to look and rectify
issues they are

Scaffold is not erected on the flat surface, no guard rails, braces and it is not fitted properly. Not follow
the safety rules such as toe boards have huge gaps can lead to scaffold collapse. Peoples and object
fall from height. Workers are working at high risk of the excavation of storage of fire fighting safety
(sump) here the construction of hydraulic shoring or any wood sheet and iron sheet are not at this
area. In the welders are doing her welding activities closer the LPG storage area. Which can lead to
expose and fire causes form several injuries and property damage. In the warehouse transport
peoples are not stopping at the blind corners and can lead to collision with other vehicle and workers
also. Here the no banks men. It is May cause death and property damages. In this are one of the
worker has painted outside of the building at 9 th floor. He didn’t have any edge protection and safety
belt. He is using only boatswains chair and brushes only.

The above observation breaches the following legal compliances Acts are:
1. Indian factory Act 1948 section 32C-subsection 3e
2. Fire prevention and fire safety Act 1986 by the government of India.
3. Scaffolding and lifting Act 1912 and regulation 1950.
4. Indian electricity Act and rules 1956 rule 29.
5. Chemical regulation 1990 (No 177).
6. Control of substances hazards to health (COSHH 2002).
7. Safety and health in construction convention (C167 ) capital ILO

Therefore I recommend the management to improve the training, information, instruction and
supervision and safe methods of working practices especially on fire, scaffold, excavation, electrical
and chemical related work activate
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Main findings of the inspection

1. Fire hazard (Observation no: 16)

In the construction site workers are working welding the rods which is closer to gas cylinders
(LPG) storage area and sparks while welding can contact with the LPG gas lead s to cause fire and
explosion property damage and mass casualties in the workplace. Here the loss of origination may
casualties and property damage cost Rs 100000/- and other indirect costs of court fines.

Which breaches the international legislation of convention C167 safety and health in construction
convention in 1988 Article no 167 and fire protection and prevention Act1997.
Indian factory act 1948 section 32C-subsection 3e.
Fire prevention and fire safety act 1986 by the government of India.

Recommendation:

The origination to be provided a separate covered welding area. The whole construction site
where all welding works can be take place separately. Which eventually presents mass casualties and
property damage. It is may be cost of the 50000/-.

2. Scaffold collapse, falling of people and objects (observation no: 2, 23)

In the construction major accidents may causes scaffolds collapse, falling from edges and
Falling objects. Scaffold being used by the workers at construction site different types of heights and
even surface area also, out riggers were broken and not being replaced, toe board have huge gaps
and some braces been missing and other peoples are not fitted properly which may lead to collapse
of scaffold, falling of people and object form height can lead to injured seriously from head injury to
muscle stress and pains.
The international legislation of convention C167- health and safety in construction in 1988 article no
167 and health and safety at work 1974 (HASWA).
Scaffolding and lifting act 1912 and regulation 1950.

Recommendation:

The origination peoples are selected the competent persons to makes scaffold be perfect using
purpose. And purchase of new scaffold materials. And provide safety nets at working area. To be
saved the many peoples life and prevents falling of objects and collapsing of scaffold which would
cost 70000/-
3. Excavation or caves (observation no: 1)

In the site area worker are ditch of 10feet in depth excavation. Here water to be storage because
of any fire fighting issues (sump) on the building area in the futures and it is an Act of law. I am found
there is no protection form the excavation peoples slip and fall into the ditch as well as there is no
protection and signage boards.
In the ILO legislation of convention C 167 safety and health in construction convention in 1988 Article
no 167.
Safety and health in construction convention (C167) capital ILO.

Recommendation:

Here the origination should provide Hydraulic shoring of trench would prevent workers to fall from
height by slip or soil to cave in and would cost approximately 20000/- and it is easier to fix by one
person and can be used for new upcoming projects.

4. Electrician hazard (observation no: 17, 25)

In the work site, the main electric power supply for the entire construction site that located near the
excavation area is unprotected and no signage of danger being placed, can lead to electrocution,
shocks, burns and death. In the secondary effects such as fall from height due to throw off can cause
serious injury of bone fractures and head injury.

The breaches of the law Indian electricity act and rules 1956 rule 29.

Recommendation:
Management should allocate resources for barricading the high danger electricity power supply area
by isolating and that would cost around Rs18000/- .can prevent burns, electrocution and even
death .Danger Signage boards should also positioned near the power supply area.

5. Chemical Hazard Observation No: 10


Painter was working at 6th floor outside the building by using spray. These spray paints forms small
droplets in the atmosphere and creates volatile vapours around working area and the person working
there may inhale of these volatile paint vapour which lead to suffocation and respiratory problems and
leading to heath issues and acute effects. It also cause skin cancers and burning sensation in eyes

In breaches law Chemicals regulation, 1990 (No 177) and Control of substances hazards to health
(COSHH 2002)

Recommendation:
Management have to ensure that worker are wearing respiratory protective equipment to prevent
respiratory problems, coveralls to prevent from skin allergies and goggles to protect eyes. These
protective equipment would cost approx. Rs25000/-
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Conclusions

In this construction origination I am observed my health and safety knowledge find major problems in
this origination. In this origination major findings needs to be immediate action towards the safety of
workers from health and safety management. These are excavation falling peoples, electricity shocks
and burners, fire explosion, collision with vehicle pedestrians at warehouse by vehicles or forklifts
which can be controlled and followed the safety policy and rules.

Other safety concerns such as manual handling, vibration, noise, stress, biological effect, chemical
exposure, heat, stress, lighting and ventilation can also be controlled with suitable preventive control
measures which also recommended on the observation sheet.

The workforces were seemed to be very happily because of the origination to be followed welfare
facilities such as locker, first aid provisions, drinking water, rest room ,toilet facilities both men and
women separately and smoker zones areas. The origination is followed the health and safety policy is
maimed sufficiently.

And finally I would request to the management please takes any accidental issue may be occur in the
site take immediately action on the suitable recommendation for the good implementation of health
and safety culture. The origination people should be followed by the International labour origination
acts and minted.
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number_____________________________________

Location___________________________________________ Date of review / /

Recommendations – include as a table in the following format:

Recommendation Likely resource implications Priority Target date


Observation No:2 & 23 Purchase new scaffold
Purchase of new scaffold material cost 50000/-
materials
select the competent Training by a competent High One month
person person cost around Rs 8000/-
training to all scaffold per hour
employees
2hours training to employees
Observation No:1 Hydraulic shoring it may be
Trench for the excavation cost of 25000/- High
Hydraulic shoring to 1 month
prevent fall of edges
Observation No:16 Cost of fire retardant material
1Cover the welding area Rs 2000/-
with fire retardant materials high 1 month

2 Damp the work area


Cost of fire extinguisher Rs
3. Fire extinguishers 3000/-

Observation No:10 Cost of RPE ,Coveralls and


Painting at outside of the goggles cost around Rs
building area.to be 25000/- High 1 day
provided with RPE,
Coveralls, Goggles

Observation No:17&25 Here the cost of the barricade


Barricade the high voltage would be Rs 5000/- High 1 month
main power supply in the
construction area.

Place Danger sign boards Sign board cost Rs 500/-