You are on page 1of 3

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Misamis Oriental 2nd District Engineering Office


OFFICE OF THE DISTRICT ENGINEER
F. Balase Street, Poblacionm El Salvador City

DAILY TIME RECORD


Period Covered:
Monday-Friday: 8:00 - 12:00, 1:00 - 5:00 04/01/19 - 04/31/19
Saturday: 8:00 - 12:00, 1:00 - 5:00
Day IN OUT IN OUT OT UT ACCOMPLISHMENT
01 Mon - - - - - - -
02 Tue - - - - - - -
03 Wed - - - - - - -
04 Thu - - - - - - -
05 Fri - - - - - - -
06 Sat - - - - - - -
07 Sun - - - - - - -
08 Mon 8:00 12:00 - - 0.00 4:00 Orientation with the Construction Section, Contract Documents
09 Tue - - - - - - -
10 Wed 8:30 12:00 1:00 5:00 0.00 0.30 Contract Documents, DPWH Blue Book
11 Thu 7:45 12:00 1:00 5:00 0.00 0.00 Contract Documents, DPWH Blue Book
12 Fri 8:00 12:00 1:00 5:00 0.00 0.00 Contract Documents, DPWH Blue Book, Bar Cutting List
13 Sat - - - - - - -
14 Sun - - - - - - -
15 Mon 7:45 12:00 1:00 5:00 0.00 0.00 Bar Cutting List on Beams
16 Tue 8:00 12:00 1:00 5:00 0.00 0.00 Bar Cutting List on Beams
17 Wed 8:00 12:00 - - 0.00 0.00 Bar Cutting List on Beams
18 Thu - - - - - - -
19 Fri - - - - - - -
20 Sat - - - - - - -
21 Sun - - - - - - -
22 Mon 8:00 12:00 1:00 5:00 0.00 0.00 Bar Cutting List on Columns and Foundations
23 Tue 7:55 12:00 12:57 5:00 0.00 0.00 Paperworks: Billing Documents
24 Wed 7:56 12:00 12:30 5:00 0.00 0.00 Paperworks: Billing Documents
25 Thu 7:50 12:00 12:40 5:00 0.00 0.00 Paperworks: Billing Documents
26 Fri 7:32 12:00 12:35 5:00 0.00 0.00 Paperworks: Billing Documents
27 Sat - - - - - - -
28 Sun - - - - - - -
29 Mon - - - - - - -
30 Tue 7:25 12:00 12:27 5:00 0.00 0.00 Paperworks: Billing Documents
31 Wed - - - - - - -
I certify that the above mentioned statement is correct and that the services rendered were applied
to the public service.
Dated at DPWH - Misamis Oriental 2nd Engineering District, Philippines, 3-Jun-19

Sean Maico W. Wasil


On-the-Job Trainee
Approved:
I certify on my honor that the record of actual working
JIM B. RAMOS hours entered herein was done daily during the time of
Chief, Construction Section arrival and departure from the office.

Timekeeper
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Misamis Oriental 2nd District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
F. Balase Street, Poblacionm El Salvador City

DAILY TIME RECORD


Period Covered:
Monday-Friday: 8:00 - 12:00, 1:00 - 5:00 05/01/19 - 05/31/19
Saturday: 8:00 - 12:00, 1:00 - 5:00
Day IN OUT IN OUT OT UT ACCOMPLISHMENT
01 Wed - - - - - - -
02 Thu 8:02 12:00 12:46 5:00 0.00 0.02 Paperworks: Billing Documents
03 Fri 7:57 10:00 12:26 5:00 0.00 2.00 Paperworks: Billing Documents
04 Sat - - - - - - -
05 Sun - - - - - - -
06 Mon 8:20 12:00 12:20 5:00 0.00 0.20 Construction Estimates: Concrete Volume
07 Tue 8:01 12:00 12:40 4:55 0.00 0.06 Construction Estimates: Concrete Volume
08 Wed 7:46 12:00 12:50 5:00 0.00 0.00 Construction Estimates: Concrete Volume
09 Thu 8:04 12:00 12:30 5:00 0.00 0.04 Construction Estimates: Concrete Masonry Units (CMU)
10 Fri 7:41 12:00 12:39 5:00 0.00 0.00 Construction Estimates: Concrete Masonry Units (CMU)
11 Sat -
12 Sun -
13 Mon - - - - - - -
14 Tue 8:00 12:00 - - 0.00 4:00 Paperworks: Billing Documents
15 Wed - - - - - - -
16 Thu 7:47 12:00 12:23 5:00 0.00 0.00 Paperworks: Billing Documents
17 Fri - - - - - - -
Fieldwork with:
18 Sat 8:00 12:00 1:00 5:00 0.00 0.00
Engr. Generoso G. Abellanosa Jr.

19 Sun - - - - - - -
20 Mon 7:47 12:00 12:43 5:00 0.00 0.00 Paperworks: Billing Documents
21 Tue 7:53 12:00 12:32 5:00 0.00 0.00 Paperworks: Billing Documents
Fieldwork with:
22 Wed 8:00 12:00 1:00 5:00 0.00 0.00
Engr. Maria Luisa M. Mendoza
23 Thu Organizational Chart: Assistance
Fieldwork with:
24 Fri
Engr. Raffy A. Fahigal
Fieldwork with:
25 Sat 8:00 12:00 1:00 5:00 0.00 0.00
Engr. Generoso G. Abellanosa Jr.
26 Sun - - - - - - -
27 Mon Paperworks
28 Tue Paperworks
Fieldwork with:
29 Wed
Engr. Mark Jason L. Jurial
30 Thu - - - - - - -
31 Fri - - - - - - -
I certify that the above mentioned statement is correct and that the services rendered were applied
to the public service.
Dated at DPWH - Misamis Oriental 2nd Engineering District, Philippines, 3-Jun-19

Sean Maico W. Wasil


On-the-Job Trainee
Approved:
I certify on my honor that the record of actual working
JIM B. RAMOS hours entered herein was done daily during the time of
Chief, Construction Section arrival and departure from the office.

Timekeeper

You might also like