Requirement of quantity
Name of Project:-Construction of Nuwakot District Hospital
Location:-Nuwakot, Nepal
Piping and others materials
Total Power Tools & Controls Heat Cool Trading Advance Engineering
S.N Description of Works Units
Quantity Unit (Rate) Total (Rate) Unit (Rate) Total (Rate) Unit (Rate) Total (Rate)
1 Copper Pipe Roll 5
Size: 1/4 1,800.00 9,000.00 1,650.00 8,250.00 1,820.00 9,100.00
2 Copper Pipe Roll 5
Size: 1/2 4,800.00 24,000.00 4,300.00 21,500.00 4,500.00 22,500.00