The document provides a progress update for work on 6 generator sets (G1-G6). It lists 14 tasks related to installation and commissioning of the generator sets and daily fuel tanks. It notes that generator sets 1-6 have been completed for all tasks except insulating the exhaust line. The overall progress of the generator set work is reported as 91% complete.
Original Description:
Berikut ini adalah Dokumen, yang berisi Progress Dan Step-Steo dalam Instalasi Generator
The document provides a progress update for work on 6 generator sets (G1-G6). It lists 14 tasks related to installation and commissioning of the generator sets and daily fuel tanks. It notes that generator sets 1-6 have been completed for all tasks except insulating the exhaust line. The overall progress of the generator set work is reported as 91% complete.
The document provides a progress update for work on 6 generator sets (G1-G6). It lists 14 tasks related to installation and commissioning of the generator sets and daily fuel tanks. It notes that generator sets 1-6 have been completed for all tasks except insulating the exhaust line. The overall progress of the generator set work is reported as 91% complete.
2 Install Dynabolt to Lock genset on structure 1 1 1 1 1 1 3 Install Cable ladder 1 1 1 1 1 1 4 Pulling cable control dan power 1 1 1 1 1 1 5 Connecting cable control and power to genset 1 1 1 1 1 1 6 Pulling Grounding cable to genset location 1 1 1 1 1 1 7 Connecting grounding cable to genset 1 1 1 1 1 1 8 Daily Tank Placement to the location 1 1 1 1 1 1 9 Install Dynabolt to Lock Daily Tank on structure 1 1 1 1 1 1 10 Install Silencer 1 1 1 1 1 1 11 Install Fuel Line from daily Tank to genset 1 1 1 1 1 1 12 Install exhaust line 1 1 1 1 1 1 13 Comisioning and ready to use 1 Install insulation for Exhaust line Genset 1-6 sudah selesai, tapi ada bagian yang belum 14 1 1 1 1 1 1 terinsulasi (masih kelihatan rockwollnya)