DATA TYPES
1. MASTER DATA - END USER
2. TRANSACTION DATA - END USER
3. CONFIGURATION DATA - CONSULTANT
6-PROJECT SCOPE
ECC 6.0 SD / MM / FI CO / HR / ABAP / BASIS
13-PROJECT PLAN
EACH AND EVERY ACTIVITY IN THE IMPLEMENTATION WITH THE DATE AND RESPONSIBLE PERSON
NAME.
14-PROJECT DELIVERABLES
FOR THE ABOVE ACTIVITIES ARE ALL MY DELIVERABLES.
TRAINING, TESTING & UPLOADING WILL BE GIVEN ELABORATELY IN THIS.
PROJECT PREPARATION, BUSINESS BLUE PRINT PHASE (ALL THE PHASES),
PREPARE A DOCUMENT, THIS WILL BE CALLED DELIVERABLES.
16-SIGNOFF
PROJECT MANAGER
WIPRO DELIVERY MANAGER
ITC PROJECT MANAGER
15 ACTIVITIES WILL BE MENTIONED. THE ABOVE 4 PERSON WILL BE SINGOFF MEANS THIS PROJECT
PREPARATION PHASE IS OVER. THIS DOCUMENT WILL BE CALLED PROJECT CHARTER.
PROJECT PREPARATION
1 TEAM LEADER
1 SR CONSULTANT
2 ASSOCIATE CONSULTANT (IF IT IS REQUIRED)
1 JUNIOR CONSULTANT
STEERING COMMITTEE
WIPRO
CEO VP CIO SAP DELIVERY MANAGER (INDIA SAP MANAGER) PROGRAM MANAGER PMGR
PROJECT MANAGER
|
TEAM LEADER
|
SENIOR CONSULTANT
(FI / CO / MM / SD / HR / BASIS / ABAP)
|
JUNIOR CONSULTANT
ITC – SIDE
CEO
VP
CIO
SAP PROJECT MANAGER
CORE TEAM
SUPER USER
END USER
CORE TEAM MEMBER WILL COLLECT INFORMATION FROM THEIR SIDE (EXISTING BUSINESS PROCESS –
RELEASING OF AS IS TEMPLATE), WHEN THE PROJECT PREPARATION PHASE STARTS AND AT THE
BEGINNING OF BUSINESS BLUE PRINT PHASE THEY WILL HAND OVER TO PREPARE A TO BE DOCUMENT.
GAP:-
1. NOT POSSIBLE BY SAP AT ALL
2. POSSIBLE BY SAP BUT NOT POSSIBLE BECAUSE OF SCOPE, TIME AND MONEY
SENIOR CONSULTANT WILL PREPARE TO BE DOCUMENT FOR THE PARTICULAR SUB MODULE LIKE AP
AND GL.
1. ORGANIZATION STRUCTURE
2. MASTER DATA
3. BUSINESS PROCESS
4. STANDARD INFORMATION SYSTEM
5. MODULE INTEGRATION
6. REPORTS
7. FORMS
8. GAPS
9. DEVELOPMENT LIST
10. PROCESS CHANGES
DEV – NO DATA
SAND BOX – ALL MASTERS DATA AVAILABLE, READY TO USE. WE CAN MOULD AS YOU WISH.
NO TR WILL MOVE FROM SAND BOX TO DEV. BASIS TEAM WILL MOVE.
IN BLUE PRINT PHASE – ONLY SAND BOX AVAILABLE, NOT OTHER SERVER
IN REALIZATION PHASE – DEV – QTY – PROD
IN REALISATION PHASE WE USE SAND BOX THEN TR WILL BE MOVED FROM SAND BOX TO DEV.
ONCE DONE IN 200 BY FUNCTIONAL CONSULTANT (CONSULTNAT WILL CHK HERE ONLY) FOR TESTING
PURPOSE (MODULE WISE) TR WILL BE MOVED FROM 200 TO 220.
HOW TO TEST
310 - GOLDEN CLIENT, PRE-PRODUCTION OR MIRROR IMAGE OF PRODUCTION SERVER ALSO CALLED
BACK UP SERVER
300 - HERE IF TEST CASES IS FAILED THEN GO BACK TO 200 AND CHANGE THE CONFIGURATION AND
MOVE TR TO 220 THEN QUALITY 300 THEN ALL THE TR FROM 300 TO 310.
1. CUTOVER ACTIVITIES
2. TRAINING - END USER TRNG, END USER MANUAL (STEP WISE PROCEEDURES)
3. UPLOAD DATA - MDM OR FUNCTIONAL CONSULTANT
4. UAT
5. AUTHORIZATION MATRIX
BACIS TEAM WILL GIVE ACCESS TO THE ENDER USER AFTER WE SUBMIT IN EXCEL SHEET.
UAT
END USER ACCEPTANCE TEST. ANY CHANGES GIVEN BY END USER IN THIS TIME WILL BE DONE IN
SUPPORT AFTER GO LIVE.
OPEN ORDER
OPEN DELIVERY - DLY DONE BUT NOT PAID
OPEN PO - INV PAID BUT NOT PAID
OPEN PR
OPEN GL ACCOUNT
FUNCTIONAL PEOPLE WILL ASK CLIENT AND PREPARE FS AND HAND OVER TO ABAPER, THEY WILL
PREPARE TS
4 MONTHS PERIOD IN FINAL CONFIGURATION TIME, 9 HRS THEY WILL PREPARE FOR EXA 30 PROG.
1000 OEPN ORDER WILL CREATE IN SAP IN DEV SERVER ONLY, TEST IT.
CUTTING OVER LEGACY SYSTEM AND MOVING ALL OPEN TRANSACTIONS TO SAP SYSTEM BY USING BDC
PROGRAM.
V – PHASE / GOLIVE