[Attach GAD]
S. No.
Bridge Proposed Waterway Height above
No Location (m) bed-level (m)
S. No.
Bridge Proposed Waterway Height above
No Location (m) bed-level (m)
S.
No. Bridge No Proposed Waterway Height above
Location (m) bed-level (m)
S. No.
Location (km) Type of culvert Waterway (m) Length of barrel (m)
1.4.9 Railway flyovers
Railway Fly Overs shall be provided at the following crossings as per GAD
attached:
S. No.
Bridge No Crossing Length (m) Salient particulars
(Chainage)
(Chainage)
Road over bridges (ROB) shall be provided at the following crossings as per
GAD attached:
S. No.
Chainage LC No. Class Road Width
1.7 Track layouts in station yards
Station yards shall be constructed as per the final engineering scale plans.
[Site details showing the station yard drawings for all stations to be enclosed.]
S. No.
Name Centre Nos. of Minimum Nos. of foot
of line platform width of over bridge
Statio chainage and their platform with width (m)
n individual (m)
length and
width (m)
Nos. of stairs
on each Lifts/ PF Washable Watering Parking
platform Shelter Apron Line
Escal (Nos.)*L (Sq. Metre)
ators *B
[Provide details]
Efficient drainage system for disposal of water from the buildings and for
drainage of the area shall be provided.
[Provide details]
[Provide details]
[Provide details]
All signage, information boards and posts shall be provided which include
train Indication Board (TIB), Coach guidance system (CGS), utility boards
(such as cloak room, parcel, waiting rooms etc.) etc. in accordance with Good
Industry Practice.
Drainage system including surface and subsurface drains for the Railway
Project shall be provided in accordance with the [specify relevant clauses and
name of the manual]
Requirement of retaining walls, boulder pitching, geo grid, turfing etc. shall be
specified.
[Provide details of inventory for civil and track works for stores]
2.1.1 All signalling works including Survey, design, supply, installation, testing and
commissioning shall be executed in accordance with the provisions of the
Indian Railway Signal Engineering Manual.
Type of lifting
Type of block
of
of
Type of point
of
of
&
Type of train
operation &
arrangement
arrangement
interlocking
No of Lines
Signalling
detection
working
locking
locking
barrier
Details
station
system
siding
Name
Type
Std.
1 Survey, design, i.
supply, ii.
installation, iii.
testing, manuals iv.
for new ...
technology ...
equipment
installed each
place, supply of
completion
drawings, and
commissioning
at wayside
stations
2 Inventory. [Specify Quantity with unit
Supply ofthe name of
signalling location(s)
spares: and the
quantity of
2.1 Electronic inventory
Interlocking or to be
Relay supplied at
Interlocking each
equipment location]
2.2 Power supply
system
2.3 Data logger
system
2.4 Axle counter
system
2.5 Signalling
cables
2.6 Power cables
2.7 Relays
2.8 Point
machines with
accessories
2.9 Train
Detection system
2.10 On Board
(Cab) equipment
for TPWS
system
2.11 Line side
equipment for
TPWS system
2.12 TMS (with
remote operation
system)
2.13 Any other
item/items for
functioning of
Signalling
system as per
contract
requirement.
2.14 Testing and
measuring tools
and equipment
as determined in
accordance with
the
manufacturer’s
manuals
3 Integrated
testing and
commissioning
2.1.3 Signalling works at major or junction stations:
The details of signalling works at major/Junction stations are:
of
Type of point
Type of lifting
Type of block
of
of
&
of
operation &
with adjacent
Type of train
arrangement
arrangement
arrangement
interlocking
No of Lines
Signalling
detection
Junction
working
stations
locking
locking
barrier
Details
station
system
siding
Name
Type
Std.
1 Survey, design, i.
supply, ii.
installation, iii.
testing, manuals iv.
for new ...
technology ...
equipment
installed for
each place,
supply of
completion
drawings, and
commissioning
of
major/junction
stations
2 Inventory: [Specify
Supply of the name of
signalling location(s)
spares: and the
List spares 2.1 quantity of
to 2.14 as under inventory
paragraph 2.1.2 to be
above. supplied at
each
location]
3 Integrated
testing and
commissioning
2.1.4 Block Signalling (BPAC/Token/Tokenless).
of block
section
electromechanical)
Chainage (From)
Chainage (To)
(electronic,
signalling
section
signal
1 Survey, design,
supply,
installation,
testing, manuals
for new
technology
equipment
installed for
each place,
supply of
completion
drawings, and
commissioning
of block
signalling
(BPAC/token/
tokenless)
2 Inventory: [Specify the Quantity with unit
Supply of name of
signalling location(s)
spares: and the
List spares 2.1 quantity of
to 2.14 as under inventory to
paragraph 2.1.2 be supplied
above. at each
location]
3 Integrated
testing and
commissioning
2.1.5
Tachometer
Equipment,
On Board
Antenna,
Chainage Chainage line details
Wayside
Junction
section
station
station
(From) (To) section (pl
Auto
specify)
1 Survey, design,
supply,
installation,
testing, manuals
for new
technology
equipment
installed for
each place,
supply of
completion
drawings, and
commissioning
of train
protection and
warning system
(TPWS)
2 Inventory, [Specify Quantity with unit
Supply of the name of
signalling location(s)
spares: and the
List spares 2.1 quantity of
to 2.14 as under inventory
paragraph 2.1.2 to be
above. supplied at
each
location]
3 Integrated
testing and
commissioning
2.1.7 Sections
Details of Sections
S Description of
N work
System(TMS)/
Indoor/Outdoor Installation for IBS/IBH
Integrated Power supply at stations and
Point Operation and locking arrangement
EI/PI/RRI (New/ Modification)
Management
LC Gate interlocking
LC Gate telephone
Name of section
Block Signalling
UPS at OCC
LC Gate
or ABS
Train
etc.)
1 Survey, design,
supply,
installation,
testing, manuals
for new
technology
equipment
installed for
each place,
supply of
completion
drawings, and
commissioning
Optic fibre cable supply, laying in trench in all types of soil including cable laying
through trenchless technique for road/road crossing, jointing, termination, testing and
design, supply, installation, testing and commissioning of STM, P D/I Mux system
including all associated control equipment to achieve the end goal .
Power supply
equipment Power supply
multiplexer
Any other
equipme
Emerge
Type of
control
station
details
Short
From
Long
Haul
Way
haul
HQ
ncy
To
nt
1 Survey, design,
supply,
installation,
testing, manuals
for new
technology
equipment
installed for each
place, supply of
completion
drawings, and
commissioning
of optical fibre
cable
Communication
system
Six quad telecom cable supply and laying in trench in all types of soil including cable
laying through trenchless technique for road/road crossing, jointing, termination and
testing including provision of EC sockets at every km for emergency communication
and Level crossing gate.
Survey, design, supply, installation, testing and commissioning of mobile train radio
communication, including supply and installation of porta cabins/ service buildings,
towers, power supply equipment and antenna etc.:
direction base
From To
Any other
Name of
No. of 3
No. of 2
station.
Details
service
service
station
station
3.1.1 Regulated conventional type OHE with normal contact wire height 5.80
Metre
3.1.2 Regulated high rise type OHE with normal contact wire height 7.57
Metre
3.1.3 Regulated Tramway type OHE with normal contact wire height 5.80
metre
S.N. From Station to km to km Total Remarks
Station Track km
3.1.4 Regulated tramway type high rise OHE with normal contact wire height
7.57 metre.
3.1.5 Unregulated conventional type OHE with normal contact wire height 5.80
metre.
3.1.6 Unregulated type OHE high rise with normal contact wire height 7.57
metre.
3.2 25 KV Sectioning post (SP) and sub-sectioning post (SSP) (Switching Post)
3.6 High voltage transmission line from grid sub-station to railway TSS
Nominal Voltage
S.N. Location level Number of Remarks
bays
2. Modification of existing
SCADA System
SCADA Equipment at
3 Traction Sub-Station
4 SCADA Equipment at
Switching Posts (SP/SSP)
1. Track
crossing
2. Along
the
Track
Current capacity/
S.N. Location size of conductor Quantity Remarks
All signalling works including design of signalling plan, route control chart or
selection/control table, panel diagram, wiring/circuit diagram, application
logic, interface details, cable route chart, cable core diagram, termination and
equipment position diagram etc. as part of the modification to the existing
signalling system along with supply, installation, testing and commissioning
shall be executed in accordance with the provision of IRSEM and signal and
Interlocking principles issued in the form of typical designs.
In addition to above, augmentation of existing service buildings to
accommodate additional signalling equipment/ racks etc shall be carried out.
The released materials shall be transported to the railway depot within the
Site, as nominated by the Authority’s Engineer.
train
system
(Junction)/
Motor
Type of Signal feed
and
other
Std of interlocking
Cables (Sig/Tele)
(local or remote)
Wayside station
Details of siding
Name of station
Block working
Power supply
immunisation
arrangement
requirement
of
No of Lines
of
protection
detection
Earthing
carbon)
Major
Point
Type
Type
Etc.)
Any
1 Survey, Design,
Supply, Installation,
Testing, supply of
manuals for new
technology equipment
for each place, supply
of completion
drawings, and
commissioning of
2 Supply of signalling Name of station Quantity with unit
spares:
2.1 Electronic
Interlocking or Relay
Interlocking equipment
2.2 Power supply
system
2.3 Data logger system
2.4 Axle counter system
2.5 Signalling cables
2.6 Power cables
2.7 Relays
2.8 Point machines with
accessories
2.9 Train Detection
system
2.10 Any other item/items
for functioning of
Signalling system as per
contract requirement.
2.11 Testing and
measuring tools and
equipment as determined
in accordance with the
manufacturer’s manuals
3 Integrated testing and
commissioning
other
feed (local or
and
Type of Signal
&
Power supply
arrangement
LC Gate No.
requirement
protection
(Sig/Tele)
Earthing
remote)
locking
Cables
barrier
Any
1 Survey, Design, Supply, Installation, Testing, supply
of manuals for new technology equipment for each
place, supply of completion drawings, and
commissioning of
3.20.1 General
Civil works include building works (staff quarters, service building, tower wagon
shed and siding, platform shed) raising height of FOB/ROB and any other work
necessary for completion of the electrification works.
Type-II
Type-III
Type-IV
Type-V
Construction of tower wagon shed and siding including inspection pit, earthwork,
approach road, water supply arrangement, ballast supply and its spreading, permanent
way work with all Contractor’s permanent way material for M+7 sleeper density with
60 Kg (90 UTS) rail and sleeper (Drg. No. T/2496), track connection with main line
including thermit welding, insertion of glued joint, internal electrical wiring with
allied works and electrical power supply arrangement with transformer/main
distribution supply, as per the Schedule D.
Construction of service buildings including electrical internal wiring with allied work,
electrical power supply arrangement with transformer/main distribution supply,
sewerage system, water supply arrangement, augmentation of water supply, provision
of bore well with electrical pump and pump house, approach road, levelling and earth
filling of land, boundary wall, street lighting arrangement etc.
Administrative Offices
OHE Depot
Construction of trip shed and siding including inspection pit, earthwork, water supply
arrangement, ballast supply and its spreading, Permanent way work with all
Contractor’s permanent way material for M+7 sleeper density with 60 Kg (90 UTS)
rail and sleeper (Drg. No. T/2496), track connection with main line including thermit
welding, insertion of glued joint, approach road, levelling and earth filling of land,
street lighting arrangement, internal wiring with allied works and electrical power
supply arrangement with transformer/main distribution supply.
Raising height of FOB with running out of ramp up to specified height including
material required for this work, design and drawings and temporary arrangement
drawing adhering approved FOB drawing.
Raising height of ROB with running out of approach road up to specified height
including material required for this work, design and drawings and Temporary
arrangement drawing adhering approved ROB drawing.
(a) Service roads for traction sub station and switching posts,
(b) Tree plantation
(c) Fencing
(d) Bore wells
(e) Pump house
(f) General power supply sub-station
(g) Number plates
(h) [others (to be specified)]