You are on page 1of 6

Activity - Unlaoding of Ethy

Sr. No Sub Activity Hazard Probable Consequences

1.It could be source


of ignition.
Arrival of the 2.Un-worthyness of 1.Fire
1 tanker for taking in
tanker at site site. 2.
For example:leaky
tanker ,

1.Parking at wrong 1.Fire


2 Parking of the palce. 2.Property damage
tanker at the 2.Striking against 3.Near miss
unloading of the structure & facility .
place

1.Falling of the
person from the 1.Fataliy
Taking sample tanker.( Injury & 2.Burn
3 from the tanker fatality ) 3.Exposure
2.Chemical burn 4.Incident
3.Toxic exposure

1.incompatibility of 1.Fire
4 Cheking the the material may leak 2.Explosion
quality of the to the explosion
material recive

1.Wrong line up to
1.Incident
Connecting the the tanker
2.static hazard 2.Fire
5 tanker to the 3.Exposure
unloading line 3.Leading to fire &
explosion 4.Spillage
4.Over fill of the tank
receiving the
material

Unloading
operation & Fire , Spillage , Toxic
6 compilation of
the loading exposure
operation

Removal of the spillage


tanker
7 unloading place
Activity - Unlaoding of Ethyl Acetate Tanker

existing Control measure Risk Addition Control measure Risk Rank


P S R P

Endoformin VG
Risk Rank
S R

You might also like