E Grommets are intended for thin sheet E


material they are not available at
20-30mm reach, it might be possible to
source a grommet that will remain captive
and fitted at both sides,
There are long reach and short reach
bushes available, that can be used by
either a bush and lock nut or tapping the I am not sure how this sleeve
The Kopex/flexible conduit appears to be a long length, this is very difficult hole and screwing the bushes in to the with remain captive.
to pull cables through, the kopex will also require glanding to prevent cables tapped thread.
chaffing and being pulled away from terminals An achievable method to prevent the
cables chaffing is required.

Fixings will be difficult when


cove is constructed
Coordinate with the Architects construction details

D D
KPF General notes:

1 - Contractor to coordinate access panels -where


required- with the all other treads.
2- Contractor is responsible for the fixing detail of the
services to its architectural context.
3- Coordinate location and height of cables with all
other trades.
4- Contractor not to expose containment in public TCA-JV
areas X
WE CERTIFY THAT THE SUBMITTAL HAS BEEN REVIEWED, CHECKED, COORDINATED AND
APPROVED FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS.
5- Coordinate with Architectural RCP drawings
FOR THE AVOIDANCE OF DOUBT, THIS CERTIFICATION RELIES UPON THE ADEQUACY OF THE
6- Bottom level for all services to be coordinated with New stamp is not in accordance
Tony Hordern 19.06.2017 false ceiling and must be also coordinated with other with contract. Only top sentence
OUR CERTIFICATION DOES NOT CONSTITUTE A SUBSTITE FOR, OR ACT IN LIEU OF, PROPERLY
conditions like door heights, internal elevations and of verification stamp is accepted,
required clear height at each space .....etc. as per SUPERVISORY
CONSULTANT(s) AND/OR previous submittal stamps.
CONSULTANT FROM THIER CONTRACTUAL AND/OR
7- Contractor to coordinate shop drawings with
Briefing Packages
8- All shop drawings approvals are predicated on
material and calculations submittal and approval.
C 9- Comments on one sheet are applicable to similar
C
conditions on other sheets.
10 - In stakeholders and FOH areas it is not accepted
any expressed view of conduit, wiring, boxes, and any ABU DHABI AIRPORTS COMPANY
type of fixation.
I have not yet seen a convincing method of fixing these
drivers and glanding of kopex/flexible conduits. the
items that are of concern are
kopex not glanded
Single insulated cables exposed to touch
~
There is a risk of cables being pulled from the driver
~
terminals

B B

ABU DHABI INTERNATIONAL AIRPORT

~
TYPICAL
A ~ LIGHTING DETAIL PLAN A
LIGHTING FIXTURE TYPE L2b & XS1
SHEET 71

401-AN-E-07-GE-0.00-LT-SD-071 0

NTS D.S.V. K.H.


SDS NO.: AUH.06.10.0401 22-05-17 1 1
--

8 7 6 5 4 2 1
Z:\2-PERMANENT WORK\1-SHOP DRAWING\1-DRAFT\7-ELECTRICAL DETAILS\1-LIGHTING\401-AN-E-07-GE-0.00-LT-SD-071_00.dwg, 5/23/2017 3:26:27 PM, don

You might also like