QTY UNIT UNIT COST TOTAL COST

GRAVEL BEDDING
Gravel 3.23 cu.m. ₱ 1,320.00 ₱ 4,267.56
Subtotal ₱ 4,267.56
AREA OF FOOTING 32.33 sq.m. NO. OF UNITS 1
BATCHER 3.67 5
NING BELT 2.97 2
MIXER 4.02 2

CONCRETE
CONCRETE VOLUME 16.01 cu.m. NO. OF UNITS 1
BATCHER 1.85 5
NING BELT 1.19 2
MIXER 2.19 2
Cement 145.00 bags ₱ 195.00 ₱ 28,275.00
ash Sand 8.81 cu.m. ₱ 1,210.00 ₱ 10,654.66
Gravel 16.01 cu.m. ₱ 2,850.00 ₱ 45,628.50
Subtotal ₱ 84,558.16
CUT LENG QTY LENGTH EXCESS
REINFORCEMENT
Column
BATCHER 2.24 55 20.53
NING BELT 1.24 32 6.61
MIXER 1.24 32 6.61
total 33.76

Footing
BATCHER 3.00 55.00 28
1.20 130.00 26
NING BELT 1.96 18 6
1.00 30 5
MIXER 3.34 20 20.00 20-2.66M
1.12 58 3.36
total 87.74
TOTAL 121.50
DIA. DSB 122.00 length ₱ 188.40 ₱ 22,984.80
Ties
BATCHER 0.00
NING BELT 2.00 28 9.33
MIXER 2.50 28 11.67
total 21.00
DIA. DSB 21.00 length ₱ 1,009.00 ₱ 21,189.00
Subtotal ₱ 44,173.80

FORMWORKS
lic Board 8.00 sheets ₱ 1,280.00 ₱ 10,240.00
Subtotal ₱ 10,240.00
TOTAL ₱ 143,239.52