You are on page 1of 3

Problem 1:

Solution:

Length of N-5 stretch = 4 miles

AADT (in 2005) = 160,500

Lanes = 8

Capacity = 1750 veh/hr/ln

Conversion factor (AADT to AWDT) = 1.12

SEGMENT CAPACITY CAPACITY AADT AWDT RATIO


NAME (c) C = (c) * 8
(veh/hr/ln) (veh/hr) AADT* C.F AWDT/C
N-5 Near
Shahdara 1750 14000 160500 179760 12.8

(Using Table 5.1 of Sinha Book and Interpolating Value)

11
Time 12 – 1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9 - 10 10 - 11 am-12
am am am am am am am am am am am pm
Distance
4 4 4 4 4 4 4 4 4 4 4 4
(Mile)
Speed
59.24 59.56 59.68 59.74 59.60 58.59 54.06 34.36 28.69 28.71 35.68 44.15
(Mile/Hr)
Hourly
Travel Time 4.1 4.0 4.0 4.0 4.0 4.1 4.4 7.0 8.4 8.4 6.7 5.4
(Mins)

15 -
Time 12 -13 13 -14 14 -15 16 - 17 17 18 18 - 19 19 20 20 -21 21-22 22-23 23-24
16 pm
pm pm pm pm pm pm pm pm pm pm
pm
Distance
(Mile) 4 4 4 4 4 4 4 4 4 4 4 4

Speed
(Mile/Hr) 48.93 51.00 49.30 41.47 29.99 25.24 24.27 27.91 39.84 53.48 57.45 58.37

Hourly
Travel
Time 4.9 4.7 4.9 5.8 8.0 9.5 9.9 8.6 6.0 4.5 4.2 4.1
(Mins)
Hourly Travel Time Profile
12.0

10.0
Travel Time (minutes)

8.0

6.0

4.0 Hourly Travel Time


Profile in Minutes

2.0

0.0
0 2 4 6 8 10 12 14 16 18 20 22 24
HOURS (1.00 - 24.00)

Problem 2:

Solution:

Length of Road stretch = 4-miles

No of Lanes on Highway Facility = 10

Capacity = 1900 veh/hr/ln

Avg. vehicle occupancy = 1.07

AWDT
AADT SPEED
CAPACITY CAPACITY (same TRAVEL
(Using table
SEGMENT traffic for TIME
(same 5.1)
NAME (c) C = (c) * 10 working & AWDT/C T = D/S*60
demand as 8.00am-9.00am
non-
in 2005)
(veh/hr/ln) (veh/hr) working (min)
(mph)
days)
N-5 Near
1900 19,000 160,500 160,500 8.5 53.14 4.5
Shahdara
TRAVEL TIME SAVINGS:

 Travel Time saving for morning peak from = Travel Time (2005) – Travel Time (2010)
8.00am – 9.00am

= 8.4min – 4.5min = 3.9min

Travel Time saving for morning peak from 8.00am – 9.00am = 0.065 hr

 Travel Time saving value in 2010 = Travel Time saving value in 2005 x CPI (2010)
CPI (2005)

Travel Time saving value in 2010 = Rs. 14.5 x 190.85 / 160.40

= Rs. 17.3 /person/hr

(Considering 20% traffic flowing in morning peak hour 8 to 9 am)

 Total Benefits for Travel Time savings = 0.2*160500*1.07*17.3*0.065


= Rs. 38,623 /day

 Total Benefits for Travel Time savings/year = Rs. 38,623 *365

 (Annual Vehicle Travel Time saving) = Rs. 14.09 million

You might also like