2 RED FILLING QUANTITIES

Right embankment dam filling quantities


D0+562.78 TO D1+599
Material design quantity (cum)
Clay core 184,289
1 Fine Filter 41,580
Coarse Filter 68,622
Rock Fill 507,512
Rip-Rap 94,056
11,094
3 CONCRETE QUANTITIES
uantity (cum) Location Design Total
Unit 1# 37690
Unit 2# 29932
Unit 3# 29812
Unit 4# 29844
powerhose 163173
SP1 46216
SP2 45631
GD1 19579
GD2 20468
Erection B 8895
Downstrea 16000
Silt arreste 870
Apron 4600
Switch Station
Cover plates
LED concrete base