Unit = 1
Detail
Unit Qty Rate per Unit
A FABRICATION
A-1 MATERIAL
1
2 Paint (Paint Synthetic Enamel) Gallon 0.25 725
A-2 EQUIPMENT
A-3 MANPOWER
Total
17 Sundries = 10% 10
Total A
B TRANSPORTATION TO SITE
3 Mobile Crane (for Loading and Unloading) Per Hour 0.25 2887
0.00
MRS Input Rate of Material
181.25
(13.005)
MRS Input Rate of Material
93
(13.017)
MRS Input Rate of Material
2472.99
(01.003)
2,363
2,486 MRS Input Rate of Equipment /
Machinery (EQ-12)
4,331 MRS Input Rate of Equipment /
Machinery (Add. Item 6)
2,205 MRS Input Rate of Equipment /
Machinery (EQ-11)
1483.8 MRS Input Rate of Material
(01.003)
1,575
Quotation attached
225 Quotation attached
330 Quotation attached
7,455
37,276
373