Professional Documents
Culture Documents
National Disaster Risk Reduction and Management Center, Camp General Emilio Aguinaldo, Quezon City, Philippines
CHECKLIST
Barangay
Local Disaster Risk Reduction & Management Councils (LDRRMCs)
Gawad KALASAG CY 2017
Telefax: NDRRMC Opcen +63 (2) 911-1406; 912-2665; 912-5668; NDRRMC Secretariat +63 (2) 912-0441; 912-0459;
Office of the Administrator, Office of Civil Defense +63 (2) 912-2424
Email: dopcen@ndrrmc.gov.ph Website: www.ndrrmc.gov.ph
implementation of (CSO’s, Women,
prevention and Youth, and
mitigation others such as
projects/activities of religious,
the DRRMC. business and
other basic
sectors i.e.
Victims of
Disasters and
Calamities,
PWDs. Elderly,
children, etc)
3. Early Warning System (4)
3.1 Established EWS Presence of EWS 4
for specific hazards in protocol per hazard
the locality
Presence of Four
Elements of a sound
EWS:
a. Risk Knowledge
b. Alert and
Monitoring
c. Dissemination
d. Response
Capacity
4. Risk Financing (5)
4.1 LGU facilities and Presence of 2
equipment are covered Insurance Policies
by insurance
4.2 LGU facilitated MOA/MOU of LGU 1
agreement with with the banks,
cooperatives, micro cooperatives, micro
finance institutions, finance institutions
and local financing
institutions to extend
calamity loans to the
affected community
(RA10121 sec 17)
4.3 Accredited Insurance coverage 2
Community Disaster of ACDVs
Volunteers (ACDVs)
5. Environmental (4)
Management
5.1 Environmental Presence of
laws/ordinance/s environmental code 2
enacted and ordinances
5.2 Programs and Number of 2
projects on Programs, Projects,
environmental and Activities
Page 2 of 9
management implemented
6. Infrastructure (6)
Resilience
6.1 Infrastructure Audit 2
Inspection/Assessment Report
of all local government Report/Action
facilities and photos of Inspection
Infrastructure as well
as Infrastructure being
utilized by the public
6.2Ensuring all Number of 2
constructions comply construction of
to accepted standards barangay
and specifications buildings/facilities
are:
o Compliant to
the National
Building Code
of the
Philippines
(PD 1096)
o Compliant to
Accessibility
Law (BP 344)
for public
infrastructure
and those
being used by
the public
6.3 Conduct of Regular risk 2
periodic maintenance assessment
work on public facilities Maintenance work
and infrastructure undertaken
Budget allocated
and utilized for
maintenance
Page 3 of 9
1.1.2 Composition of Me 2
the BDC compliant mbership of
to RA 7160 accredited CSOs to
particularly on the the
membership of non- Council/Committee
state stakeholders. Fun
ctional and
organizational
Charts on display
1.2 Regularity of Minimum: Semestral 1
meetings
1.3 Quorum during Quorum in meetings 1
meetings
1.4 Regularity of Minimum: Quarterly 1
Standing
Committee/Task Unit
meetings
2. Barangay DRRM (11)
Committee
2.1 DRRM Office/Desk Separate and 2
established dedicated
office/desk
2.2 Organizational Organizational and 1
Structure functional chart on
display
2.3 Capacity Number of CapDev 1
Development for activities and
Personnel personnel trained
Page 4 of 9
vulnerabilities, and posted in
EWS, and counter- conspicuous places
measures.
2.8 Pre-positioned Presence of 1
stockpiles of relief stockpile items or
goods (food and negotiated credit line
non-food) or a as evidenced by a
negotiated MOU/MOA
agreement with
local suppliers
2.9 Submission of the Reports received by 1
Barangay DRRM the BDC
Fund Utilization
Report to the BDC
3. Plans (3)
3.1 Barangay DRRM Availabl 1
Plan e, Approved and
updated plan
Page 5 of 9
4.5 Fire Suppression At least (1) training .5
conducted during
the review year
4.6 Medical Services At least (1) training .5
(Basic Life Support, conducted during
First Aid) the review year
4.7 Incident Command At least (1) training .5
System (ICS) conducted during
the review year
4.8 Family and At least (1) training 1
Community-Based conducted during
Disaster the review year
Preparedness &
Monitoring System
4.9 Psycho-social At least (1) training .5
Intervention conducted during
the review year
4.10 Involvement of Participation as 1
NGOs/CSOs/Busin resource person or
ess & Private in the participant
conduct of training
(enabler and
receiver)
5. Partnership (3)
Mechanisms/Linkages
5.1 Participation of MOA/MOU of the 1
NGOs, Business and partnership relating
Private Sectors, and to preparedness
others (excluding the
conduct of training)
5.2 Resource Acknowledgement 1
Mobilization Receipts
(Monetary and Non- Photo
Monetary) documentation of
the Actual
Operations
5.3 Inter-LGU Established inter- 1
Cooperation and LGU alliance
Alliances
Page 6 of 9
Operating SOPs/ Protocols
Procedures (SOPs) in known to operatives
place for specific and responders
hazards in the area
1.1.2 Availability of Checklist/Operations 1
Templates for LCE Listavailable and on
directives display
1.1.3 Readiness to Structure available 3
deploy functional and on display (per
Incident hazard)
Management Team Knowledgeable and
by the first responder skilled operatives
on site and responders
1.1.4. Availability of Written SOPs 3
timely, accurate and Number of
reliable response conducted drills,
SimEx, rehearsals
1.1.5 Identification of List of sites and 2
relief distribution centers/maps
points/centers
1.1.6. Determination List of sites and 2
of clinics, hospitals centers with
and RHUs to address description (bed
any medical capacity, hospital
emergency type) /maps
1.1.7. Identification of List of sites and 1
Standard-based centers/maps
Evacuation Sites Available and posted
and/or Centers and in conspicuous
Routes places
1.1.8 Readiness to List of vehicles and 1
provide transportation drivers and/or MOA
for Evacuation with transport groups
if available
1.1.9. Establishment Evacuation center 2
of Standard constructed
Evacuation Center(s) purposely for
evacuation
OR
1.2 With disaster (20)
response operations
1.2.1 Real time/near Established 2
real time, end to end reporting system
reporting system Presence of reports
such as:
o PDRA
o Sitrep
o RDANA
o DANA
Page 7 of 9
1.2.2 Conduct of Pre- PDRA 2
Disaster Risk report/proceedings
Assessment
1.2.3 Activated ICS team reports 3
functional Incident
Command System
(ICS) by the first
responder
1.2.4 Issuance of Copies of issuances 3
public advisories in and public advisories
accordance with the
protocols developed
1.2.5 Executive Copy of the EO and 4
Order/System on protocols
Forced Evacuation
1.2.6 Activation of A copy of the 2
relief distribution adopted relief
points/centers using distribution
the relief distribution mechanism
mechanism Reports
1.2.7 Coordination Activation of EOC 2
with appropriate and Cluster System
agencies
1.2.8 Conduct of Copy of RDANA 2
Rapid Damage Reports
Assessment and
Needs Analysis
(RDANA) within 72
hours after the
occurrence of the
disaster
Page 8 of 9
planning,
implementation and
monitoring of
mitigating projects
OR
2. With Disaster (15)
2.1 Conduct of DANA report 5
Damage and Needs
Assessment (DANA)
2.2 Recovery Plan Formulated based 5
on the DANA Report
Compliance with the
build back better
principle
PPAs identified for
all sectors affected
with corresponding
budget and budget
source
Involvement of multi-
stakeholder in
planning,
implementation and
monitoring of the
recovery plan
2.3 Restoration Compliance with 5
Build-back Better
Principle
Status of projects in
the recovery plan
Rating Scheme:
Excellent 91 – 100% Non-operational 51 – 60%
Very Good 81 – 90% Defective 41 – 50%
Good 71 – 80% Non-existent 0 – 40%
Weak 61 – 70%
Comments, if any:
Certified by:
___________________________
Signature over Printed Name/ Date
Page 9 of 9