You are on page 1of 2

. . .

defining the art of sound

OFFICIAL QUOTATION
QUOTE NO: AAE/Fortuna/091019 DATE : 09/10/2019

TO : Fortuna Air-Conditioning & Electrical Pte Ltd TEL : 9017 4101

ATTN : Mr. Nick Email : nick@fortuna.com.sg

FROM : Mr. Mu Song PAGES : 1 of 2

RE : Boundary noise measurement for Nanhua Primary school

Dear Sir/Mdm,

With reference to your requirement for the above, we are pleased to submit quotation for your kind consideration and
acceptance.

QUOTE NO: AAE/Fortuna/091019

NO. DESCRIPTION QTY UNIT PRICE S$ TOTAL S$

01 Boundary Noise Measurement for 3 time zone for selected 1.00 pt Lump Sum $ 3,500.00
M&E Equipment for Nanhua Primary school c/w report with
detailed readings as per NEA requirement.
The Leq (15 mins) noise measurement shall be taken at the
following (on / off) for day; evening and night periods are
taken at the boundary of the proposed development.
Proposed Number of points: 5

note: during test, no works should be in progress.


Re-test will be quoted accordingly.

SUB TOTAL $ 3,500.00


7% GST $ 245.00
TOTAL $ 3,745.00

QUOTE NO: AAE/Fortuna/091019


Price : Subject to 7% GST
Term & Conditions : As stipulated on the next page
Validity : 30 Days
Delivery : To be advised
Payment Terms : 50% upon confirmation
50% upon submission of report

` Alpha Acoustics EngineeringPte Ltd


2 6 S i n M i n g L a n e # 04 - 1 1 3
Midview City Singapore 573971

Tel : (65) 6846 8872 Fax : (65) 6846 1848


Email : i n f o @ a l p h a a c o u st i c s .c o m
Website : www.alphaacoustics.com
. . . defining the art of sound

Best regards, QUOTE NO: AAE/Fortuna/091019


ALPHA ACOUSTICS ENGINEERING PTE LTD ACKNOWLEDGEMENT NO. & ACCEPTANCE
OF ORDER.

Mu Song
Project Executive (Signature & Company Stamp)
Mu Song

GENERAL TERMS & CONDITIONS

1) On site electricity and water will be supplied free of charge by the Main Contractor/ Customer

2) Adequate material storage space on site will be provided for by the Main Contractor/ Customer.

3) Hoisting facilities for vertical transportation of our material will be provided without charge by the Main
Contractor/Customer.

4) In cases where ceiling height is higher than 3.5 m from the floor level, the Main contractor/Customer
shall provide without charge adequate platform for our workers.

5) Our quotation does not included FSB submission or shop drawing for partition, ceiling, wall paneling
& sprinkle system work.

6) All rubbish on our part of work shall be cleared to a designated dumping area by the Main Contractor.

7) All bricks, concrete & partition walls are to be plastered and made flat before handing over for
acoustic treatment works.

8) All M&E the service works shall be completed before the start of treatment works. Modification to
existing M&E to accommodate acoustic design will be carried out and expense borne by the Main
Contractor/Customer.

9) Any extra material or labor incurred due to variation from initial proposed drawings or changes in
the required scope of work shall be adjusted according to the unit rate quoted.

10) Payment will be made in Dollars Singapore (SGD$) to ALPHA ACOUSTICS ENGINEERING PTE LTD
according to the terms of payments specified in the quotation.

Alpha Acoustics EngineeringPte Ltd


2 6 S i n M i n g L a n e # 04 - 1 1 3
Midview City Singapore 573971

Tel : (65) 6846 8872 Fax : (65) 6846 1848


Email : i n f o @ a l p h a a c o u st i c s .c o m
Website : www.alphaacoustics.com

You might also like