2) DRIVING HEAD:
7) UPSTREAM TRANSITION:
The length of U/s transition (or) The Horizontal length of U/s sloped wing
= 8.273 m
say 8.280 m
Outer width of transition
= 5.970 m
say 6.000 m
7) DOWNSTREAM TRANSITION:
Drawing
T SIDE OF APPROACH CHANNEL
DHARMASAGAR TANK
8274 1200 0.0 30000 13020 600 SOUTH CANAL
0 Duty : 150 Ac / Cusec
SL.NO Description Units Parent Canal O.T
300
0 11 Top Width of Banks.(R/L) m 30 / 30 0/ 0
+160.995 2910 1980 600 12 G.L m + 167.000 + 167.000
+160.395 150 mm Thick Bed 13 C.B.L m + 161.070 + 161.040
+160.095 300 Cone Under Pipe 14 F.S.L m + 166.936 + 161.490
8874 44220 -14220 15 T.B.L m + 168.000 + 168.000
16 Depth of Cutting. m 5.930 5.960
Provide 30000 mm Length Pipe 2500 mm Length 12 No's
NOTE
1 All the Dimensions are in Millimeters and Levels are in Merters.
G.L 2 Do Not Scale the Drawing.
300
600 SPECIFICATIONS
1980
300
300
600
300
0
Canal Flow
6000
450
450
6 Platform : Using 20MSA with 10mm
1200 dia Bars @ 150 C/C Both
Ways.
500 2250 850 m
0
300 150 0
1650
600
450
850 m
450
300 +0.000 150 150
600 +167.386 3180 STRESS TABLE
Description Concrete Soil
600 +161.490 500 +166.586 150 Max Min Max Min
Head wall U/S 34.170 -2.753 28.727 2.861
PIPE C/S Wing Wall U/S 15.961 10.174 15.407 12.474
6391
1980
5516
300
300
300
300
300
2) DRIVING HEAD:
F.S.L in parent canal = 166.936 m
3/4 of F.S.D + CBL = 165.469 m
F.S.L. in offtake canal = 161.490 m
Driving head = 165.469 - 161.490
= 3.979 m
3) AREA OF VENTWAY:
Q = Cd A sqrt (2gh) for circular vent Cd = 0.75
(A) Hoist platform level = Sill level + twice the height of gate + 0.3 + 0.15
Height of gate = 0.450 m
Hoist platform level = 161.040 + 2 x 0.45 + 0.3 + 0.15
= 162.390 m
6) PROTECTION WORK:
Provide 10m length of lining in CCM10 on D/ s of structure in the OT canal.
and the same for 5m length on either side of U/s transition to the sides of parent canal.
7) UPSTREAM TRANSITION:
STRESS TABLE
Max Min
Concrete 34.17 -2.753
Soil 28.727 2.861
Force(Tones)
Sl.No Description. L.A(m) L.A(m)
1 W1 = 0.60 X 6.39 X 2.4 9.203 - 2.61 24.019
2 W2 = 2.31 X 6.39 X 0.5 X 2.4 17.72 - 1.54 27.281
3 W3 = 2.31 X 6.39 X 0.5 X 2.1 15.5 - 0.77 11.935
4 Pv = 0.0384 X 6.39 X 6.39 X 2.1 3.293 - - -
5 Ph = 0.1340 X 6.39 X 6.39 X 2.1 - 11.49 2.556 29.376
∑Force. 45.712 ∑Moment. 92.611
∑Moment.
Leaver Arm. = ∑Force.
92.611
= 45.712
= 2.025 m
Base = 2.91 m
Base/2 = 1.46 m
45.712 6x 0.57
Max.Comp.Stress. = 2.910 x 1 + 2.91
= 34.17 t/Sqm.
45.712 6x 0.57
Min.Comp.Stress. = 2.910 x 1 - 2.91
= -2.753 t/Sqm.
Force(Tones)
Sl.No Description. L.A(m) L.A(m)
1 W1 = 0.60 X 6.39 X 2.4 9.203 - 2.91 26.780
2 W2 = 2.31 X 6.39 X 0.5 X 2.4 17.72 - 1.84 32.595
3 W3 = 2.31 X 6.39 X 0.5 X 2.1 15.5 - 1.07 16.586
4 W4 = 0.30 X 6.39 X 2.1 4.026 - 0.15 0.603
5 W5 = 3.51 X 0.60 X 2.4 5.054 - 1.76 8.869
6 Pv = 0.0384 X 6.99 X 6.99 X 2.1 3.941 - - -
7 Ph = 0.1340 X 6.99 X 6.99 X 2.1 - ### 2.796 38.458
∑Force. 55.440 ∑Moment. 123.891
∑Moment.
Leaver Arm. = ∑Force.
123.891
= 55.440
= 2.234 m
Base = 3.51 m
Base/2 = 1.76 m
55.440 6x 0.479
Max.Comp.Stress. = 3.510 x 1 + 3.51
= 28.727 t/Sqm.
55.440 6x 0.479
Min.Comp.Stress. = 3.510 x 1 - 3.51
= 2.861 t/Sqm.
Note: The Ground Level is higher than T.B.L the Canal Protion above T.B.L Should be
excavated to 2:1 Slope & Steps Should be Constructed for easy to Access to its Plotform
for Operation.
STRESS TABLE
Max Min
Concrete 15.961 10.174
Soil 15.407 12.474
Force(Tones)
Sl.No Description. L.A(m) L.A(m)
1 W1 = 0.50 X 5.59 X 2.4 6.709 - 5.77 38.684
2 W2 = 5.52 X 5.59 X 0.5 X 2.4 37.01 - 3.68 136.074
3 W3 = 5.52 X 5.59 X 0.5 X 2.1 32.38 - 1.84 59.516
4 Pv = 0.0384 X 5.59 X 5.59 X 2.1 2.52 - - -
5 Ph = 0.1340 X 5.59 X 5.59 X 2.1 - 8.796 2.236 19.667
∑Force. 78.617 ∑Moment. 253.941
∑Moment.
Leaver Arm. = ∑Force.
253.941
= 78.617
= 3.23 m
Base = 6.02 m
Base/2 = 3.01 m
78.617 6x 0.222
Max.Comp.Stress. = 6.016 x 1 + 6.02
= 15.961 t/Sqm.
78.617 6x 0.222
Min.Comp.Stress. = 6.016 x 1 - 6.02
= 10.174 t/Sqm.
Force(Tones)
Sl.No Description. L.A(m) L.A(m)
1 W1 = 0.50 X 5.59 X 2.4 6.709 - 6.07 40.696
2 W2 = 5.52 X 5.59 X 0.5 X 2.4 37.01 - 3.98 147.176
3 W3 = 5.52 X 5.59 X 0.5 X 2.1 32.38 - 2.14 69.230
4 W4 = 0.30 X 5.59 X 2.1 3.522 - 0.15 0.528
5 W5 = 6.62 X 0.60 X 2.4 9.527 - 3.31 31.515
6 Pv = 0.0384 X 6.19 X 6.19 X 2.1 3.09 - - -
7 Ph = 0.1340 X 6.19 X 6.19 X 2.1 - ### 2.476 26.707
∑Force. 92.236 ∑Moment. 315.852
∑Moment.
Leaver Arm. = ∑Force.
315.852
= 92.236
= 3.424 m
Base = 6.62 m
Base/2 = 3.31 m
92.236 6x 0.116
Max.Comp.Stress. = 6.616 x 1 + 6.62
= 15.407 t/Sqm.
92.236 6x 0.116
Min.Comp.Stress. = 6.616 x 1 - 6.62
= 12.474 t/Sqm.
W6
0.99 + 161.490
Top Width. 0.60 m: W3 0.60
Height. 0.45 m:
Density of Concrete. :
2.40 T/Cum W4 W1
Density of Soil. :
2.10 T/Cum
Width of Rear Batter. 1.98 m: 0.450
Offset. 0.30 m: W2
Bottom Width. 2.58 m:
Foundation Thickness. 0.60 m:
Total Height. :
1.050 m
+ 161.040 0.30 1.98 0.60 0.30
Active Earth Pressure Coeff. 0.60 A 2.58 W5
Pv : 0.0384 m + 160.440
Ph : 0.134 m B 3.18
STRESS TABLE
Max Min
Concrete 1.950 1.712
Soil 3.203 2.871
Force(Tones)
Sl.No Description. L.A(m) L.A(m)
1 W1 = 0.60 X 0.45 X 2.4 0.647 - 2.28 1.475
2 W2 = 1.98 X 0.45 X 0.5 X 2.4 1.069 - 1.32 1.411
3 W3 = 1.98 X 0.45 X 0.5 X 2.1 0.935 - 0.66 0.617
4 W6 = 1.98 X 0.99 X 0.5 X 2.10 2.058 - 1.32 2.716
5 Pv = 0.0384 X 0.45 X 0.45 X 2.1 0.016 - - -
6 Ph = 0.1340 X 0.45 X 0.45 X 2.1 - 0.056 0.179 0.010
∑Force. 4.725 ∑Moment. 6.229
∑Moment.
Leaver Arm. = ∑Force.
6.229
= 4.725
= 1.318 m
Base = 2.58 m
Base/2 = 1.29 m
4.725 6x 0.028
Max.Comp.Stress. = 2.580 x 1 + 2.58
= 1.950 t/Sqm.
4.725 6x 0.028
Min.Comp.Stress. = 2.580 x 1 - 2.58
Force(Tones)
Sl.No Description. L.A(m) L.A(m)
1 W1 = 0.600 X 0.450 X 2.400 0.647 - 2.580 1.669
2 W2 = 1.980 X 0.450 X 0.500 X 2.4 1.069 - 1.620 1.731
3 W3 = 1.980 X 0.450 X 0.500 X 2.1 0.935 - 0.960 0.897
4 W6 = 1.980 X 0.990 X 0.500 X 2.1 2.058 - 1.620 3.333
5 W4 = 0.300 X 0.450 X 2.100 0.283 - 0.150 0.042
6 W5 = 3.180 X 0.600 X 2.400 4.579 - 1.590 7.280
7 Pv = 0.0384 X 1.050 X 1.050 X 2.1 0.088 - - -
8 Ph = 0.1340 X 1.050 X 1.050 X 2.1 - 0.310 0.420 0.130
∑Force. 9.659 ∑Moment. 15.082
∑Moment.
Leaver Arm. = ∑Force.
15.082
= 9.659
= 1.561 m
Base = 3.18 m
Base/2 = 1.59 m
9.659 6x 0.029
Max.Comp.Stress. = 3.180 x 1 + 3.18
= 3.203 t/Sqm.
9.659 6x 0.029
Min.Comp.Stress. = 3.180 x 1 - 3.18
= 2.871 t/Sqm.