METHOD STATEMENT
EARTHWORKS
METHDSTATEMENT NO
Document No :
Revision No :
Construction Company Date :
Page No : 2 / 8
Table of Contents
1. Revisions Status
2. Scope/Objectives
3. Reference
4. Definitions
6. Responsibilities
8. Manpower Requirement
9. Material Requirement
10.Equipment Requirement
13.Supporting documentation
14.Distribution
Note:-
Document No :
Revision No :
Construction Company Date :
Page No : 4 / 8
This Method statement details the procedure for the earth works required to achieve
any raised sub grade level. And will include all the backfilling operation related to this
project.
3.0 REFERANCE
Specific safety measures have to follow as applicable, and all the safety measures are
covered separately in the project safety plan.
5.0 DEFINITIONS
CC - echnical Construction
MS - Method Statement
QCP - Quality Control Procedure
ITP - Inspection & Test Plan.
6.0 RESPONSIBILITIES:
• The earthworks activities are carried out according to the specification and drawings.
• The progressing works are carried out according to the planned program and all the
equipments required to execute the works are available as per the project planning and
are in good condition
• Co-ordinate with the (CLIENT/CONSULTANT), Project Manager, Site Engineer, Safety
Engineer, and sub-contractor for the safe and proper execution of the work.
• Specific attention to all safety measure and quality control in co-ordination with safety
engineer and QC engineer and in line with HSE plan and Quality plan.
• Co-ordinate with the safety engineer to ensure that the works are carried out in a safe
working practice.
• Co-ordinate with the QC engineer for the tests to be carried out and initiate for the
inspection for the finished works.
• Ensure the implementation of any request that might be raised by (CLIENT/CONSULTANT)
the Rep.
• Ensure that an efficient daily progress has been obtained from all the equipments and men
power engaged in the work and check the same against the daily report received from
the Forman.
• Pass all the revised information to the Forman and ensure that it’s being carried out
properly.
• Co-ordinate with the surveyor and plan the survey works in advance as per the work
sequence.
6.3 QA Engineer-
• Ensure that all the works are carrying out as per the specification and the related quality
procedure.
• Inspect and satisfy him self the completed work and requesting for the client’s approval.
• Maintain inspection and test records complete for any future reference.
• Ensure the implementation of all safety measures in accordance with the HSE plan and
everybody aware of it for it’s proper implementation.
• Ensure all the implemented safety measures are adequate to maintain the safe working on
the site
• Inspect all the site activities and train the persons to prevent accidents and it’s proper
reporting to the project manager and the client.
• Ensure that the site is maintained clean and tidy
6.5 Foreman-
• Carrying out the work and the proper distribution of all the available resources in co-
ordination with the site engineer on a daily basis.
• Daily reports of the works achieved and coordinate for the future planning with the Site
engineer.
• Coordinate with the surveyor for the benchmarks, setting out and the markings.
• Incorporate all the QC and Safety requirements as requested by the concerned Engineer.
• Met with any type of unforeseen incidents or requirements and reporting to the site engineer
immediately.
Document No :
Revision No :
Construction Company Date :
Page No : 6 / 8
• Surveyors
• Driver
Document No :
Revision No :
Construction Company Date :
Page No : 7 / 8
10.0EQUIPMENT REQUIREMENT:
• Shovel. -2 No
• Jcb. -1 No
• Truck. -5No
• Water Tanker. -2No
• Roller compactor. -1No
• Plate compactor. -1No
• Theodlight -2No
• Levels -2No
• For all the backfill activities, adequate barriers, signboard, advance-warning signs, traffic
control and flashlights will be provided. Warning tape with rope will be installed all
around the back filling area. Steel bars will be used as posts with warning tape on top all
around.
• Where a backfilling work crosses road or access track, permission from the appropriate
authority will be taken, and where required a stage system or a diversion will be adopted
to maintain the access. If an existing service is exposed during the excavation, the
service should be properly protected and supported during all the activities.
• Ladders with handrails will give proper and safe access to the bottom of the excavation.
• Water will be sprayed on dusty heaps of materials.
• All the dusty materials will be covered by Tarpaulin during the transportation.
• All the quality control documentation related to the excavation should be approved before
commencing the work. And as follows.
• QCP for Earthworks
• ITP for Earthworks
• Project Quality Plan.
• Check sheets for the Earthworks.
Document No :
Revision No :
Construction Company Date :
Page No : 8 / 8
This Method Statement should be read in conjunction with the below referenced
documentations.
• Contract Specification and drawings.
• QCP for Earthworks
• ITP for Earthworks
• MS for demolition.
• MS for Excavation.
• Project Quality Plan.
• Project HSE Plan.
• Applicable Quality Control Documents from sub contractors.
14.0 DISTRIBUTION;
Copies of this method statement have also been issued to the following for information/
action/comments: -
• Management Representative
• Project Manager.
• Construction manager.
• Site Engineer.
• HSE Engineer.
• QA/QC Engineer.
Approved