NOTE :

01. FOUNDATION ARE DESIGNED FOR THE S.B.C. OF 22.00 T/M^2 AT


DEPTH OF 2.0 (OR 0.5 Mt ARCHORED IN ROCK) BASED ON SOIL
230 230 230 230 INVESTIGATION REPORTOF SUBMITTED BY
2350 2400 AGENCY NAME:-BHUMI RESEARCH CENTER
230

230
PROJECT NO :- BRC/REP /180837/ 2018
RECEIVED BY THIS OFFICE Dt. : AUGUST- 2018
525

525

02. FOUNDATION IS DESIGN FOR HOLLOW PLINTH + 4 FLOOR.


C14 C14 03. MIXES FOR ALL R.C.C. WORK SHALL BE M25 BELOW GR. LVL.
2100

2100

AND M25 ABOVE GR. LVL .


04. ALL R.C.C. SHALL BE MACHINE MIXED & MACHINE VIBRATED.
C1 C2 2200 05. MINIMUM CEMENT CONTENT AS PER MIX DESIGN OR AS PER
IS:456.
06. CLEAR COVER FOR ALL R.C. WORKS TO BE AS FOLLOWS.
ALL VERTICAL R/F: # FOOTING & RAFT 50 MM. # COLUMN BELOW GROUND 40 MM.
CUT - OUT FOR LIFT # COLUMN ABOVE GROUND 40 MM. TO RINGS. # BEAMS BOTTOM
2400

3100 8T@100c/c 25 MM. # BEAMS TOP & SIDES 25 MM. # SLABS & CHHAJJA 20 MM.
2250 C3
# PEDESTAL 40 MM. # R.C. WALLS 20 MM.
07. ALL LAPS IN BEAM & SLAB SHOULD BE 60 TIMES DIA OF BAR &
5485 LAPS IN COLUMNS TO BE 50 TIMES DIA OF BAR EXCLUDING HOOK.
2250
08. PERIOD FOR REMOVAL OF CENTERING FROM THE OF

2250
ALL RINGS: ALL RINGS:
2500

2700

CONCRETINGS SLAB BOTTOM MIN. 10 DAYS, BEAM BOTTOM 21


870

575 8T@150c/c 8T@150c/c 230 BRICK MASONARY DAYS, BEAM SIDES 2 DAYS, COLUMN SIDES 2 DAYS.
1630

C14 C14 C13


C4 C5 09. R.C. CONCRETE SHOULD BE CURED FOR A MINIMUM PERIOD OF
1640 965 10 DAYS.
A A
10. ALL MATERIAL SUCH AS STEEL, CEMENT, SAND & METAL SHALL
CONFIRM TO I.S. SPECIFICATION & ALL WORKS SHALL BE DONE
1350

IN A WORKMAN LIKE MANNER.


4930

2622 RAFT - 675


2220 11. PROPER CHAIRS & GHODAS TO BE PROVIDED FOR TOP BAR OF
C6 A 845 A CANTILEVERED, CHHAJJAS & BENT UP BARS IN SLABS TO KEEP
3300

THEM IN POSITION.
3000

C7 C10
1250 12. IF ANY DISCRIPENCY IN DWG. SHALL BE BROUGHT NOTICE TO
900

525
C14 C14 STRUCTURAL ENGINEER WELL BEFORE EXECUTION

525
1350

1350

13. ALL STIRRUPS SHALL BE HOOK BENT AT 135ᄚ TO 3" LONG.


3600
525

C14 C14 14. THE CEMENT SHOULD BE CONFIRMING TO GRADE 43,53 ONLY.

525
7125
15. ALL REINFORCEMENT SHOULD TMT(T) CONFIRMING TO

230
I.S. 1786 & STEEL GRADE SHALL BE Fe-500

230
16. ALL DIMENSION ARE IN MM UNLESS SPECIFIED OTHERWISE.
230 17. THIS DRAWING SHOULD READ IN CONJUCTION WITH
230 2050 230 ARCHITECTURAL DRAWING -ARCH. DWG. No.A/1.1 LATEST
C8 C8 REVISION.
3000

18. VERIFY C/C MEASUREMENT WITH ARCHITECTURAL DRAWING.


LIFT PLAN ABOVE PLINTH LVL. 19. ALL C:M (1:6) FOR ALL BRICK MASONARY WORK & MINIMUM
230 2050 230
STRENGTH OF BRICK IS 35 kg/cm2.
3300
STRUCTURAL DESIGNS/DRAWINGS PREPARED BY
3000 LIFT PLAN AT FOUNDATION LVL.
3150
3450

C9 C15
C6
STRUCTURAL CONSULTANT
APPROVAL TO THIS DRAWING AND SAMPLE SCRUTINY OF
CALCULATIONS IN GENERAL BY OFFICE SHALL HOWEVER
NOT IN ANY WAY RELIVE THE STRUCTURAL CONSULTANT OF
3100 HIS/HER RESPONSIBILITY FOR THE CORRECTNESS OF DESIGN
C4 C5 2300 AND SOUNDNESS, DURABILITY AND STRENGTH OF THE STRUCTURE.
3300
P.C.C. SIZE CONFING 8T@75 c/c DRAWINGS SUBMITTED ON DATE:............................ARE SCRUTINIZED
R.C.C. SIZE AND
G.F.SLAB REINFORCEMENT
GENERALLY FOUND IN ORDER AND APPROVED AS PER THIS OFFICE
2400

LONG BARS
2550

LETTER NO..................................................... DT : ......................................


C11 C12
COLUMN

B / D OR
8T@75 c/c
PEDESTAL

OR L0/6
STRUCTURAL ENGINEER (G. S. P. H. C. LTD.,GANDHINAGAR)
C1 C2
SHORT BARS THE APPROVED DRAWINGS AND THE DESIGN CALCULATION OF
THE BUILDING SHALL BE THE PROPERTY OF GUJARAT STATE POLICE
HOUSING CORPORATION LTD., GANDHINAGAR.THE DRAWINGS AND
8T@150c/c

L0
DESIGNS SO APPROVED SHALL NOT BE USED IN ANY WAY
TYPICAL COLUMN FOOTING (Rest) WITHOUT THE PRIOR PERMISSION OF THE GUJARAT STATE POLICE
HOUSING CORPORATION LTD., GANDHINAGAR.
PLAN 40mm CLEAR COVER

LENGTH
TO STIRRUPS
900 CENTER STAGGED LAPS

LAP
SHOULD BE ACCOMODATED IN

45°
d
FOUNDATION LAY-OUT THIS AREA ONLY SPACING OF

01
STIRRUPS IS 8T@150 c/c
8T@150c/c
(Rest)
DETAIL: X-1 R- 0 23-08-19 05 FOR EXECUTION GSPHC - SURAT HAP
8T@75c/c R- 0 23-08-19 EMAIL FOR EXECUTION GSPHC - G'NAGAR
O.GR. LVL. /F.GR. LVL. (TYP.) CONFING 8T@75 c/c R- 0 15-08-19 EMAIL FOR APPROVAL
HAP
COL. HAP
TOP BAR REINFORCEMENT

LD+10db
3 Nos. MAX.
3 Nos. MAX. O.GR. LVL. /F.GR. LVL. R E V I S I O N

LD+10db
TITLE:

B / D OR
OR L0/6
BOTTOM BAR
3 Nos. MAX.

OR ANCHOR 0.5 mt IN ROCK


LD = DEVELOPMENT LENGTH 8T@75c/c
1800

PROJECT:
8T@150c/c PROP. B-16 (P+4)

L0

DEPTH 2.00 mt
(Rest) AT. :- SAPUTARA ,DIST:- DANG-AHWA
DIV :- SURAT
2000

8T@75 c/c

OR L0/6
B / D OR
SPECIAL CONFINING 75 4-10->
1250 845 REINFORCEMENT

300
8T@75 c/c 3 NO 8 T RING
50 PEDESTAL ARCHITECT
LONG BARS
SHORT BARS

D
675
450
GUJARAT STATE POLICE HOUSING
450

d
450 CORPORATION LTD. GANDHINAGAR
150 P.C.C.(1:3:6)
150 150 150 LXB 150 AKSHAR CORPORATION
150 P:C:C TYPICAL COLUMN AND JOINT DETAILING STRUCTURAL DESIGNERS
24, THIRD FLOOR, SHUKAN MALL, SHAHIBAUG, AHMEDABAD-04
PHONE: - 9426002014,9979851794
SEISMIC ZONE : III GOOD FOR CONSTRUCTION E-Mail : akshar.himanshu@gmail.com,