You are on page 1of 3

Construction of 10 Storied plus 2 Basements Office Building with Research,

Training and Testing Laboratory Facilities for Urban Resilience Unit, RAJUK
(Package Number: URP/RAJUK/W-1)
BILL OF QUANTITIES

Item Description of Items Unit Quantity Rate in Rate (in Words) Amount
No. BDT
(in Figure)
1 2 3 4 5 6 7
PART - A: GENERAL SITE FACILITIES
44 Supply and fixing of galvanized anchor bolts of variable diameter for rigid Kg 1,042.20 168.00 One Hundred Sixty 175,089.60
frame conforming to ASTM F1554 Grade 55, Galvanized to A153, Class C or Eight only
equivalent with minimum yield strength of 380 MPa, as per manual of steel
construction by American Institute of Steel Construction (AISC) etc. including
the cost of washer & bolts, material testing, etc. all completed as per drawing,
specification and direction of Engineer.
45 Supply, fabrication and installation of built-up sections for columns, beams, Kg 753.73 125.00 One Hundred Twenty 94,216.25
rafters, bracings, etc. from steel plates conforming to ASTM A572, with a Five only
minimum yield strength of 345 MPa, including the cost of testing of plates,
application of red/grey-oxide primer etc. all completed as per drawing,
specification and direction of Engineer.
46 Supply and fixing of connection bolts of variable diameter with nut and washer Kg 7,857.90 168.00 One Hundred Sixty 1,320,127.20
according to ASTM A325 Type 1 or equivalent with Fu = 720 MPa, including Eight only
the cost of testing of bolts, etc. all completed as per drawing, specification and
direction of Engineer.

Corporate Office: House -19, Road - 11, Sector -10, Uttara, Dhaka- 1230. Phone: +88-02-55092064, Client service: +8801822828541
Website: www.etbgroup.net
47 Supply and fixing of shear stud of variable diameter conforming to ASTM Kg 758.40 168.00 One Hundred Sixty 127,411.20
A108 or equivalent with a minimum yield strength of 275 MPa, including the Eight only
cost of testing, welding, etc. all completed as per drawing, specification and
direction of Engineer.
48 Supply and installation of 0.81 mm thick galvanized decking panel conforming Kg 130,139.10 110.00 One Hundred Ten 14,315,301.00
to ASTM A653, with minimum yield strength of 345 MPa, including all Only
necessary accessories (sheeting screws with washers, sealants, etc.), testing of
materials etc. all completed as per drawing, specification and direction of
Engineer.
49 Supply and fixing of sag rod of conforming to Grade 40, with a minimum yield Kg 379.20 145.00 One Hundred Forty 54,984.00
strength of 275 MPa, including the cost of making threads, nuts and washer, red Five only
oxide primer, testing of sag rod, etc. all completed as per drawing, specification
and direction of Engineer.
50 Supply and fixing of cable / wire bracing of conforming to ASTM A475, with Kg 213.60 145.00 One Hundred Forty 30,972.00
a minimum yield strength of 119.3 MPa, with I-bolt and hill side washer, etc. all Five only
completed as per drawing, specification and direction of Engineer.
51 Supply and fixing of GI purlin & girt of any size conforming to ASTM A653, Kg 235.60 110.00 One Hundred Ten 25,916.00
Grade 45, with a minimum yield strength of 310 MPa, including the cost of Only
testing of materials, welding, etc. all completed as per drawing, specification
and direction of Engineer.
52 Supply and installation of 2.0 mm thick fiber glass sheet (transparent sheet) for Sqm 120.00 1,900.00 One Thousand Nine 228,000.00
roof, wall, etc. on MS purlin, angles, etc. with “J” hooks or screws with washer Hundred Only
and putty, etc. all completed as per drawing, specification and direction of
Engineer.
53 Supply, fabrication and installation of hot-rolled sections (W, H, i-shape, Kg 945,411.00 125.00 One Hundred Twenty 118,176,375.00
Channel, Angle, Tube, etc.) for columns, beams, rafters, bracings, etc. Five only
conforming to ASTM A36, with a minimum yield strength of 250 MPa,
including the cost of testing of plates, application of red/grey-oxide primer etc.
all completed as per drawing, specification and direction of Engineer.
54 Supply and fixing of connection bolts of variable diameter with nut and washer Kg 231.30 160.00 One Hundred Sixty 37,008.00
according to ASTM A307 Type A or equivalent with Fu = 414 MPa, including only
the cost of testing of bolts, etc. all completed as per drawing, specification and
direction of Engineer.

Corporate Office: House -19, Road - 11, Sector -10, Uttara, Dhaka- 1230. Phone: +88-02-55092064, Client service: +8801822828541
Website: www.etbgroup.net
90 Supply, Spray Applied, Mixed with Vermiculite, Wet-type Fireproofing Sqm 13,462.00 3,295.00 Three Thousand Two 44,357,290.00
Material: Minimum 2 (two) hours rated Fireproofing material applying for Hundred Ninety Five
structural steel members consists of gypsum binder mixed with vermiculite, dry Only
mixed at factory, ready for use at site by mixing with water to the consistency of
slurry or mortar for conveying and spraying, and shall be mixed with fungi
resistant additive.
Physical Properties: Minimum values, unless otherwise indicated, or higher
values required to attain designated fire-resistance ratings, measured per
standard test methods by Fire Insurers' Laboratory, referenced with each
property as follows:
a. Dry Density: 0.34 g/㎤ or greater (Follow ASTM E 605 Density)
b. Bond Strength: 3,400 kgf/㎡ or greater (Follow ASTM E 736 Cohesion /
Adhesion)
c. Air Erosion: Sum of dust collected in 24 hours. Maximum 0.27g/㎡ (Follow
ASTM E 859 Erosion).
d. Fire-Test-Response Characteristics: Provide fireproofing material with the
surface-burning characteristics as determined by testing identical products in
compliance with BNBC / International Standard Codes of Practice.
(Follow General Specification D of Steel Structure: Section – 6.10).
All complete in all respect as per drawing and direction of the Engineer in
Charge.
128 Supply and application of corrosion protection paint to the surface of the Sqm 18,000.00 150.00 One Hundred Fifty 2,700,000.00
structural steel members conforming to SA 2.5; Steel members to be shot Only
blasted inside the enclosed shot blasting chamber, final coat paint must be
applied on site after installation, including the cost of primer, testing and
necessary accessories, all complete as per drawing specification and direction of
Engineer-in-charge.
Grand Total 181,642,690.25

In Words BDT: Eighteen Crore Sixteen Lac Forty Two Thousand Six Hundred Ninety Taka Twenty Five Paisa Only

Corporate Office: House -19, Road - 11, Sector -10, Uttara, Dhaka- 1230. Phone: +88-02-55092064, Client service: +8801822828541
Website: www.etbgroup.net