You are on page 1of 3

SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Air Terminal Devices, Volume Damper and Duct Heaters
SAIC-K-4009 31-Dec-14 HVAC
Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General

Schedule “Q”
A1 Delivered equipment and material shall be free of damage. Attachment IV
Section 5
B Air Terminal devices
All air system supply and return grilles shall be furnished in
SAES-K-001
B1 accordance with drawings and specifications, and mounted at
Para 5.2.2
locations shown on drawings.

Air Terminal devices shall be constructed of noncombustible material


NFPA 90A
B2 or of a material that has a maximum flame spread index of 25 and a
Sect. 4.3.7.2
maximum smoke developed index of 50

All materials in return air plenums shall be noncombustible


SAES-K-001
B3 or limited combustible and shall meet the requirements of
Para 4.8.12.12
Section 2.3.10 of NFPA 90A.
C Volume Dampers

Volume damper for sub-main and main-branch ducts takeoffs


shall be opposed blade type with blade linkages outside SAES-K-001
C1
the air stream and with a locking quadrant damper for Para 4.8.17.3
rectangular ducts.

Volume dampers at branch ducts shall be sheet metal butterfly type,


SAES-K-001
C2 using pivot and rod with locking quadrant damper for rigid round
Para 4.8.17.2
ducts.
D Duct Heater (RVL Material)

SAES-K-101
Listed Equipment. Electric duct heaters shall be listed and labeled. Table 1
D1
e.g. certification meets ANSI / UL 1996 NFPA 70
Para 424.6

Verify 9Com & Manufacturer of Duct heaters are approved Saudi


Aramco vendor / manufacturer (Heater: Duct: Electrical: Element -
9com: 6000001846). SAES-K-101
D1
Note: Vendor or manufacturer having a SAP Vendor number doesnot Para 7 Table 1
exactly mean that the vendor or manufacturer is already approved to
supply the product.

SAES-K-001
D1 Electric Duct Heaters shall be equipped with an airflow switches
Para 4.4.4.5

Duct Heaters installed in the air duct shall be identified* as suitable


for the installation. (NFPA 70 Para 424.57)
SAES-K-001
D2 Duct heater mounted in the airstream of a forced-air system where
Para.4.8.11
the airmoving unit is not provided as an integral part of the
equipment.

Saudi Aramco: Company General Use


Duct Heaters closer than 1.2 m (4 ft) to the heat pump or air
SAES-P-100
D3 conditioner shall have the duct heater identified as suitable for such
Para 5.2
installation and so marked (NFPA 70 Para 424.61)

Duct Heaters used with air conditioners or other air-cooling


equipment that could result in condensation of moisture shall be SAES-P-100
D4
identified as suitable for use with air conditioners (NFPA 70 Para Para 5.2
424.62)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Air Terminal Devices, Volume Damper and Duct Heaters
SAIC-K-4009 31-Dec-14 HVAC
Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-001 -- Heating, Ventilating, and Air Conditioning, 10 March 2012

2-Schedule "Q" -- Saudi Aramco Quality Requirements

3- NFPA 90 A -- Standard for the Installation of Air-Conditioning and Ventilating Systems, 2002

4- NFPA 70 -- National Electric Code, 2008

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED