You are on page 1of 2

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Essential Operating Facilities (EOF) HVAC Requirements SAIC-K-4006 18-May-05 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

SAES-K-002
A1 HVAC system for EOF shall be provided with standby system.
Para 4.3.1

Buildings located in Class I, Zone 2 or Class I, Division 2 electrical areas


shall be maintained at the positive pressure of 0.1 inch water SAES-K-002
A2
gauge.(NFPA 496 Para 7.4.1) Para 5.1.1
Note: See Item No. A3 in this SAIC for Control Building

Control building shall be maintained at a positive pressure of o.25 inch SAES-K-002


A3
water gauge with all the opening closed. Para 5.2

Auto changeover switches shall be provided between the operating and


SAES-K-002
A4 standby units. These switches shall be capable of providing changeover
Para 4.3.2
and equal wear and tear between the operating and standby units.

If the maximum design capacity of the HVAC system is supplied by two


or more normally operating units, at least one standby unit shall be SAES-K-002
A5
provided with a capacity equal to or greater than the capacity of the Para 4.3.3.1
largest operating unit.

In case the maximum HVAC system demand is satisfied by one


SAES-K-002
A6 operating unit only, the capacity of the standby unit shall be at least
Para 4.3.3.2
equal to the capacity of the operating unit.

Alarms shall be provided for all HVAC systems to provide warning of


SAES-K-002
A7 power loss (from the normal supply) and failure of any portion of the
Para 4.3.4.1
HVAC system.
All alarm devices shall be independent of the normal power supply of the SAES-K-002
A8
HVAC system Para 4.3.4.2
Individual alarm devices shall be connected to a master alarm in a
location where they can be conveniently observed by an attendant or SAES-K-002
A9
other responsible person designated by the management of this Para 4.3.4.3
essential operating facility.

In cases where the facility is not attended full time, the system shall be
connected to an alarm at the security office, utilities office, fire station or SAES-K-002
A10
other full-time service unit with which arrangements can be made to alert Para 4.3.4.3
the person in charge of this facility

Page 1 of 2
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Essential Operating Facilities (EOF) HVAC Requirements SAIC-K-4006 18-May-05 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-002 -- Air Conditioning Systems for Essential Operating Facilities 31 May, 2004
2-NFPA 496 -- Standard for Purged and Pressurized Enclosures for Electrical Equipment, 2003

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2