Professional Documents
Culture Documents
S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF SPECIFIED MANUFACTURER / LOCAL SUPPLIER PLANNED ANTICIPATED ACTUAL SUBMITETD ACTUAL RECEIVED STATUS FORECAST DATE LPO NO. ANTICIPATED MANUFACTURING SHIPPING ARRIVING AT PORT ARRIVING PLANNED REMARKS
ORGIN SUBMISSION DATE APPROVAL DATE DATE DATE LPO DATE. PERIOD TIME AT SITE DELIVERY DATE
(B.L)
HVAC
LONG LEAD ITEMS
0 FAN COIL UNITS 2-May-20 16-May-20
No UAE MEKAR / MEKAR AIR HANDLING UNIT
1 FAN COIL UNITS 14-Jun-20 22-Jun-20
11 GAC-7878-MAS-M-66 MAS HVAC 2 FAN COIL UNITS 13-Jun-20 4-Jul-20 8-Jul-20 6-Aug-20 UR
No US CARRIER
3 FAN COIL UNITS 22-Aug-20 17-Sep-20
0 CHILLED WATER PUMPS No UAE XYLEM BELL & GOSSETT / FAISAL JASSIM TRADING 2-May-20 30-May-20
0 AIR (DIRT) SEPERATOR No GERMANY REFLEX / FAISAL JASSIM TRADING 6-Jun-20 11-Jun-20
WAITING FOR RFC
16 GAC-7878-MAS-M-71 MAS HVAC 6-Jul-20 27-Jul-20 22-Jul-20 28-Jul-20 C
1 AIR (DIRT) SEPERATOR NO Netherlands FLAMCO COMMENTS
2 AIR (DIRT) SEPERATOR 22-Sep-20 6-Oct-20
0 ENERGY METERS (BTU METERS) GERMANY DEIHL / TECHEM ENERGY SERVICES 14-Jun-20 18-Jun-20
18 GAC-7878-MAS-M-73 MAS HVAC No 13-Oct-20 3-Nov-20 22-Jul-20 6-Aug-20 B
1 ENERGY METERS (BTU METERS) Denamrk KAMSTRUP
2 ENERGY METERS (BTU METERS) 12-Sep-20 8-Oct-20
22 GAC-7878-MAS-M-89 MAS PL COPPER SILVER IONIZATION SYSTEM / WATER SOFTENER / FILTRATION SYSTEM / No ITALY ATECA 10-Jul-20 31-Jul-20 UR
1 25-Aug-20 23-Sep-20
CHLORANIZATION UNIT
23 GAC-7878-MAS-M-101 MAS PL 0 DOMESTIC & CONDENSATE GRP WATER TANKS No KOREA SAMSUNG 8-Aug-20 7-Jul-20 1-Jul-20 8-Jul-20
1 DOMESTIC & CONDENSATE GRP WATER TANKS 20-Jul-20 6-Aug-20 B
24 GAC-7878-MAS-M-102 B MAS PL DOMESTIC WATER PUMPS - HOT WATER No ITALY XYLEM 10-Jul-20 15-Sep-20 18-Jul-20 6-Aug-20 UR
GAC-7878-MAS-M-102 A DOMESTIC WATER PUMPS - COLD WATER XYLEM 20-Sep-20
1
GAC-7878-MAS-M-102 B DOMESTIC WATER PUMPS - HOT WATER XYLEM 20-Sep-20
0 30-Jun-20 8-Jul-20
28 GAC-7878-MAS-M-132 MAS PL ELECTRICAL WATER HEATER No ITLAY ARISTON 29-Jul-20 22-Jun-20 B
1 3-Aug-20 26-Aug-20
ELECTRICAL WATER HEATER
MATERIAL SUBMITTAL LOG - LONG LEAD ITEMS
S.NO SUBMITTAL NO. TYPE DISCIPLINE REV DESCRIPTION SAMPLE COUNTRY OF SPECIFIED MANUFACTURER / LOCAL SUPPLIER PLANNED ANTICIPATED ACTUAL SUBMITETD ACTUAL RECEIVED STATUS FORECAST DATE LPO NO. ANTICIPATED MANUFACTURING SHIPPING ARRIVING AT PORT ARRIVING PLANNED REMARKS
ORGIN SUBMISSION DATE APPROVAL DATE DATE DATE LPO DATE. PERIOD TIME AT SITE DELIVERY DATE
(B.L)
FIRE FIGHTING
LONG LEAD ITEMS
0 FIRE PUMPS 8-Jun-20 21-Jul-20
1 FIRE PUMPS 20-Jul-20 4-Aug-20
29 GAC-7878-MAS- FF-132 MAS FP SAMPLE UAE NAFFCO 2-Aug-20 8-Jun-20 B
2 FIRE PUMPS 13-Aug-20 12-Sep-20
3 FIRE PUMPS 20-Sep-20 28-Sep-20
LPG
0 LPG SYSTEM 27-Jun-20 13-Jul-20
30 GAC-7878-MAS-LPG-133 TS LPG 1 LPG SYSTEM No UAE 17-Aug-20 12-Sep-20 UR
2 LPG SYSTEM ( TANKS AND VAPOURIZER) GULF GAS 27-Oct-20 21-Jul-20 11-Oct-20
30.A GAC-7878-MAS-LPG-133 A TS LPG 0 LPG SYSTEM ( GAS DETECTION SYSTEM) Yes UAE 11-Oct-20 UR
30.B GAC-7878-MAS-LPG-133 B TS LPG 0 LPG SYSTEM ( PIPES, FITTING, PAINTS, SUPPORTS) Yes UAE 11-Oct-20 UR
30.C GAC-7878-MAS-LPG-133 C TS LPG 0 LPG SYSTEM ( VALVES, GAS METER, GAUGE,REGULATOR) Yes UAE 11-Oct-20 UR
BMS
31 GAC-7878-MAS-BMS-134 TS BMS 0 BMS SYSTEM No US Honeywell Alerton / BMTS 4-Aug-20 21-Jul-20 9-Sep-20 5-Oct-20 C 30-Nov-20
ELV
32 GAC-7878-MAS-ELV-135 MAS ELV ELV SYSTEM (BY OTHERS) No BY OTHERS TBC