SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Condensate Drain Installation SAIC-K-4007 18-May-05 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The evaporator drain pan shall have a trapped drain pipe, attached to the SAES-K-001
A1
bottom or to the side of the drain pan, flush with the bottom plate Para 5.3.4.2
Condensate drain line shall be of corrosion-resistant type. SAES-K-100
A2
(UMC Para 309.3) Section 1

Condensate drain line (discharge piping) shall not be smaller than the SAES-K-100
A3
drain pan connection. (UMC Para 309.3). Section 1

Drain pans shall extend completely under the coil sections and shall
SAES-K-001
A4 have minimum 1-¼ inch threaded drain connections for AHUs with the
Para 4.8.8.7 (g)
total supply air equal to or greater than 5,000 cfm.
SAES-K-001
A5 Drain pan shall be sloped toward drain connection.
Para 4.8.8.7 (g)

Condensate drain line shall maintain a minimum horizontal slope in the SAES-K-100
A6
direction of discharge not less than 1%. (UMC 309.3) Section 1

The drain pipe trap shall have a water seal height equal to or larger than
SAES-K-001
A7 the fan's External Static Pressure (ESP) but not less than 50 mm (2").
Para 5.3.4.2 (d)
Note: ESP can be read from the Construction drawings or Specifications

The drain pipe shall discharge to the nearest floor drain


Exception: SAES-K-001
A8
HVAC units installed outside of buildings may discharge condensate Para 5.3.4.2 (e)
onto the ground or roof, but not onto walkways.

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC), 31 May, 2004

2-SAES-K-100 -- Saudi Aramco Mechanical (HVAC) Code, 31 May , 2004

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1