Professional Documents
Culture Documents
DRILLING DEPARTMENT
AND SAFETY ALERTS
INTEGRITY TEAM
1 Noticed someone passed under suspended load (cutting box) Alerted him to move away, called HSE who held TOFS with all solid control employee 2 servic
2 2 persons on rig floor not put on safety eye wears Discussed with them to put on their safety glasses
3 Poor quality of fruits Discussed with campboss. Discussed with rig doctor
4 Observed safety eye wear spray at dog house is empty Called HSE to provide it
DRILLING SUPERVISOR STOP CARDS FOR RIG 11
1 N/A
1 Observed bad communication between crane operators and banks man stopped operation and asked only one banks man to be communicated
2 Observed a crane was going to lift a load far from its center stopepd him and asked him to move close the load
3 While lifting operation observed no tag line has been used Stopped job and tag line has been brought
4 Observed a truck reversing without banks man Stopped him and guided him while reversing
5 Observed a crane not fully opened his outriggers Stopped him and asked him to open the out rigger properly
6 observed the forklift operator work without direct supervition from EDC talk with him about hazard, agreed
DRILLING SUPERVISOR STOP CARDS FOR RIG 57
1
1 Observed wire sling laying down on electrical cable. Put the wire in wire store, informed Sr. Elect to check the cable.
2 Observed damaged webbing sling on rig floor. Junked it, informed supervisor to avoid repeating that opservation.
3 Observed air tagger wire line not arranged well on its drum. Rearranged it well.
DRILLING SUPERVISOR STOP CARDS FOR RIG 54
1 Observed T-Card system not updated. Informed HSE and updated it.
2 Observed earthing line at sub base area not connected. Informed Sr. Elect and connected it.
19 Sep. Page 1
3 Observed safety ping for sub base location pin was missing. Informed AD and he installed one for it.
4 Observed some obstacles in front of eye wash station. Informed DM to remove the obstackles and keep it accessable.
DAILY DRILLING AND WORK‐OVER STOP CARD ANALYSIS KHALDA PETROLEUM COMPANY
DRILLING DEPARTMENT
AND SAFETY ALERTS
INTEGRITY TEAM
19 Sep. Page 2
DAILY DRILLING AND WORK‐OVER STOP CARD ANALYSIS KHALDA PETROLEUM COMPANY
DRILLING DEPARTMENT
AND SAFETY ALERTS
INTEGRITY TEAM
1 Good communication and team work during rig move . Thanked them
DRILLING SUPERVISOR STOP CARDS FOR RIG 31
1 all safe
19 Sep. Page 4
DAILY DRILLING AND WORK‐OVER STOP CARD ANALYSIS KHALDA PETROLEUM COMPANY
DRILLING DEPARTMENT
AND SAFETY ALERTS
INTEGRITY TEAM
1 No emergency lights are available in caravan at main camp Discussed with rig management to follow it up 12-Sep 10 20-Nov
2 Observed no stairs established for skid of MP's Planned with STP to fabricate stairway for this skid 14-Sep 8 5-Oct
3 Fire hydrant connection at main camp is leaking when water pump is running Communicated to HSE engineer to follow it up with mechanics 14-Sep 8 20-Sep
4 Bed light in my caravan is burned-out and in many service caravans Notified rig electrician for his action 15-Sep 7 20-Nov
5 Bellows bolt in the left end cap for power tong found dislocated Informed senior mechanic to repair it 15-Sep 7 30-Nov
EDC-11
6 Area behind draw work is dark while night times Discussed it with senior electrician to illuminate this area 15-Sep 7 30-Sep
7 Mud logging unit and directional cabin are both less than 25 m from well center Contracts with service companies need to include pressure system 16-Sep 6 KPC Contract Item
8 Escape line is short, length should be increased HSE engineer feedback that a new order has been issued 17-Sep 5 30-Nov
9 AC's in mess hall are in poor working order Communicated to senior electrician to check 17-Sep 5 22-Sep
10 There is no tower light in the rig. The issue was reported to PIC, It was ordered before and waiting to receive it E17190078 25-Aug 28 5-Oct
11 Engine room area Not enough emergency lights in engine room. 13-Sep 2 1-Nov
Informed HSE, big bag lifter had been ordered before Req E17190151 and delivered in Cairo warehouse, it will be
12 There is no special lifter for lifting big bulks. 30-Aug 23 5-Oct
received soon
13 HP cleaner is not grounded Informed electrician to check and fix grounding for it. 16-Sep 6 30-Sep
EDC‐17
14 Observed hole in basket of shale shaker No.3 Raised the issue to STP and will replace the worn basket during upcoming rig move 17-Sep 5 1-Oct
15 Observed emergency light at dog house out of service Informed Elect who will repair it 18-Sep 4 1-Oct
Refilled it by air, place the air gun closed to it for any further usage and will replace the worn air tube during upcoming
16 Observed little mud leakage in air tube at suction line of mud pup No.2 18-Sep 4 1-Oct
rig move
17 Mud pump No. 2 is lacking for special turning tool for Maintenance work. Raised the issue to STP and will fabricate suitable tool. 18-Sep 4 1-Oct
18 The 4-way for the HCR is not labelled on the accumulator 4way valve for HCR label we will bring new lab from AG.WH and install it 10-Sep 12 During this week
EDC‐89
19 GENERAL BATHROOM IN VERY BAD COND. STP will CLEAN , FIX SAME 12-Sep 10 next rig move
20 Poor condition flooring of the mess hall and galley Materials will be onboard next Monday to start refurbishment 11-Sep 11 one week
21 Indicator lamps at the driller consol are down Asked electrician to repair 13-Sep 9 14-Sep
22 Some signs were found missing and the rig is not complying with the safety sign standardization program Survey is ongoing for detecting the missing ones to complete the system 10-Sep 12 15-Sep
23 The spring holding the links was found in poor condition Asked the material man to request a new one 10-Sep 12 30-Sep
24 Observed the v-door gate is not closed from its bottom which permitting for fine things to be dropped Steel plate will be welded to close it completely during next rig move 10-Sep 12 next rig move
All materials required for fabricating the new system of the stainless steel manifold to the potable water
25 Steel manifold of the potable water tank causing health hazrard
tank are received and will contact the external repair for sending 3rd party for installing the system
10-Sep 12 withen a week
EDC‐47
26 observed TDS tilt piston clamps is out of order and may cause aproblem raiseed to STP and new clamps orderd 10-Sep 12 next rig move
27 Flood light at the MB area was found down Raised to electrician 14-Sep 8 15-Sep
28 There's no fixed scaffold for handling BOP jobs Issue raised to STP for contacting scaff team 10-Sep 12 2 days
29 Observed a grating is in poor condition on the mud tanks Covered by steel plate till being welded next rig move due to OBM 10-Sep 12 1 month
30 Talk back system is out of order Raised to electrician "Cable is already requested" 10-Sep 12 1 month
31 Marting decker gauage need calibration Issue raised to STP & HSE for an action 15-Sep 7
32 Observed the driller cabin glass not clear & need to change it informed Pic 2-Sep 20 (next rig move)
33 observed kill line in bad condition informed Pic 3-Sep 19 REQ (S6A190006)
wating survey from
34 Observed the water manifold of water tank in rig site is iron not stainless steel informed Pic 2-Sep 20
mog company EDC‐61
35 Observed broken self closing system of the both doors of driller cabin informed Pic 2-Sep 20 (next rig move)
36 Observed counter balance wire for rig tong has some bents and need to be changed informed Pic 2-Sep 20 (next rig move)
38 Mess hall ground need to changed STP MADE REQUISITION & WAIT FOR SPARE PARTS 30-Jul 54 TWO MONTH
39 Observed that the general bathroom in very bad condition need to repair Waiting for spare parts 26-Jul 58 ONE MONTH
EDC‐90
40 Observed that rig floor set back area was damaged,need to replaced Informed STP 5-Sep 17 ONE MONTH
41 AC in the the electrician caravan isn't working informed the STP and electrician 13-Sep 9 1 WEEK
42 The bottom 6’ of the ladder on the mast is badly bent. will be done next cat.4 10-Sep 12 TWO MONTH EDC‐96
escape line wasn't installed due to third party inspection , and will be installed in the next rig acceptance (we are
43 escape line not R/U 8-Sep 14 10-Sep
preparing to rig release)
44 the electric welding machine dosenot meet the standard precaution in 19 Sep.
progressing to meet the standard precaution 21-Aug 32 Page 5
15-Sep
45 there is one A/C on the mess on the camp is not working senior electration cheked it immediately and waiting the supply from yard 3-Sep 19 15-Sep ST‐25
47 One of The mess A/C in main camp is down A/C need a new compressor, SR.ELEC ordered one and will receive it with next supply truck 2-Sep 20 20-Sep
DAILY DRILLING AND WORK‐OVER STOP CARD ANALYSIS KHALDA PETROLEUM COMPANY
DRILLING DEPARTMENT
AND SAFETY ALERTS
INTEGRITY TEAM
19 Sep. Page 6