Professional Documents
Culture Documents
XXXX/01
VOLUME 2 OF 2 :
ILLUSTRATIVE WORKED
EXAMPLES
Published by
INDIAN ASSOCIATION OF STRUCTURAL
ENGINEERS
This document is still under development by Indian
Association of Structural Engineers (IAStructE).
o Mr Alok Bhowmick
o Mr Rajiv Ahuja
Page 1 of 90
About this guideline
Like many current national codes in India, the IRC code on Loads and Load Combinations
(namely IRC:6-2017) is a code without a published commentary. For any structural design
code, it is important for the practicing structural engineers to have a thorough understanding
of the principles, the true interpretation and background of the codal clauses, which will
ensure better compliance of the code. It is often found that many of the clauses presented
in the code presents difficulty to some designers at least initially for its correct application.
For young engineers particularly, the unfamiliarity with the codal clauses poses huge
problems in ensuring correct interpretation and application of the code. This is the backdrop
to the publication of this guideline, titled ‘Proposed Modification and Commentary for IRC:6-
2017” by the Indian Association of Structural Engineers (IAStructE). The association
recognised this need and set up a task group to prepare two documents :
a. Volume - 1 : Commentary
b. Volume - 2 : Illustrative Worked Examples.
The 1st document captures the background to the code and also includes proposed
modifications required in the code. The 2nd document further illustrates the practical
application of the code and should promote understanding. Both these documents were
prepared by a team led by Mr Alok Bhowmick (MD, B&S Engineering Consultants Pvt. Ltd.
and President, IAStructE) and Mr Rajiv Ahuja (Independent Consultant and GC Member,
IAStructE). The document is also peer reviewed by some of the eminent engineers (Mr A K
Banerjee, Convenor of B-2 Committee; Prof. Mahesh Tandon, MD of Tandon Consultants
Pvt. Ltd. and Mr T Viswanathan, Independent Consultant. This publication will assist
practicing bridge and structural engineers in building confidence in the code, which offers
tools for the design of economic and innovative bridge structures. The document is rich in
theoretical explanations and draws on much experience of the authors. Worked examples
further illustrate the application of the code and should promote better understanding.
As conveners of the Task Group, we would like to thank all the authors, peer reviewers and
members of the joint Task Force for working efficiently and effectively in producing these
documents. The Commentary and the Worked Examples will prove an authentic companion
to IRC:6-2017 and deserves every success.
Page 2 of 90
Disclaimer / Copyright : Indian Association of Structural Engineers.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system or transmitted in any form or by any means, electronic, mechanical, photocopying,
recording or otherwise, without the prior written permission of the Indian Association of
Structural Engineers (IAStructE).
The opinions reflected in this document are those of the authors and the IAStructE cannot
be held liable for any view expressed therein. All advice or information from the IAStructE is
intended for those who will evaluate the significance and limitations of its contents and take
responsibility for its use and application. No liability (including for negligence) for any loss
resulting from such advice or information is accepted.
Readers should note that all codes and standards published by the Indian Roads Congress
are subject to revision from time to time and therefore this guideline is applicable and
relevant to the latest publication of the code available at the time of publication of this
document. Readers must ensure that they are in possession of the latest version of the code
for practical application.
Page 3 of 90
INDEX
EXAMPLE
S.NO. EXAMPLE DESCRIPTION
NO.
204 DESIGN FORCES DUE TO CARRIAGEWAY LIVE LOADS :
1 204-1 FOR SIMPLY SUPPORTED SPAN SUPER-STRUCTURE
205 REDUCTION IN THE LONGITUDINAL EFFECT ON BRIDGES :
2 205-1 FOR BRIDGES CARRYING THREE TRAFFIC LANES
3 205-2 FOR BRIDGES CARRYING FOUR TRAFFIC LANES
206 HOR. LOADS IN RAILING / KERB & VERT. LOAD ON FOOTPATH :
4 206-1 HORIZONTAL LOAD ON PEDESTRIAN RAILING & FOOTWAY KERB
5 206-2 VERTICAL LOAD ON FOOTPATH FOR A SIMPLY SUPPORTED BRIDGE
6 206-3 VERTICAL LOAD ON FOOTPATH FOR A CONTINUOUS BRIDGE
208 CALCULATION OF IMPACT FACTOR ON VARIOUS BRIDGE TYPES :
7 208-1 SIMPLY SUPPORTED SPAN BRIDGE
8 208-2 CONTINUOUS SPAN BRIDGE
9 208-3 CANTILEVER ARM BRIDGE (WITHOUT SUSPENDED SPAN)
10 208-4 CANTILEVER ARM BRIDGE WITH SUSPENDED SPAN
11 208-5 IMPACT FACTOR FOR VARIOUS BRIDGE COMPONENT
12 208-6 IMPACT FACTOR FOR HANGERS IN BOWSTRING GIRDER BRIDGE
210 CALCULATION OF WATER CURRENT FORCES ON VARIOUS TYPES OF SUBSTRUCTURES:
13 210-1 PIER WITH WELL FOUNDATION
14 210-2 PIER WITH WELL FOUNDATION IN SKEW
15 210-3 BRIDGE HAVING OPEN FOUNDATION ON PUCCA FLOOR
16 210-4 PIER WITH PILE FOUNDATION
211 CALCULATION OF LONG. FORCES DUE TO FRICTION, BRAKING, SHRINKAGE & TEMPERATURE ON BRIDGES :
DERIVATION FOR HORIZONTAL FORCES IN BEARINGS OF SIMPLY SUPPORTED AND CONTINUOUS SPAN
17 211-1
BRIDGES
18 211-2 CALCULATION OF FORCES IN SIMPLY SUPPORTED DECK WITH 'FIX' & 'FREE' BEARINGS
CALCULATION OF FORCES IN INTERMEDIATE PIER FOR SIMPLY SUPPORTED DECK WITH 'FIX' & 'FREE'
19 211-3
BEARINGS ON ADJACENT SPANS
CALCULATION OF FORCES IN INTERMEDIATE PIER FOR SIMPLY SUPPORTED DECK WITH 'FIX' & 'FREE'
20 211-4
BEARINGS ON ONE SPAN & ELASTOMERIC BEARING IN ANOTHER SPAN
CALCULATION OF FORCES FOR CONTINUOUS SPANS SUPPORTED THROUGH 'FIX' BEARING AT
21 211-5
INTERMEDIATE PIER AND 'FREE' BEARINGS AT REMAINING PEIRS.
212 CENTRIFUGAL FORCES ON BRIDGES :
22 212-1 CALCULATIONS FOR SIMPLY SUPPORTED CURVED BRIDGE
23 212-2 CALCULATIONS FOR CONTINUOUS CURVED BRIDGE
213 BUOYANCY CALCULATIONS FOR STRUCTURES
24 213-1 CALCULATION OF BUOYANCY FORCES FOR AN UNDERPASS
214 CALCULATION OF EARTH PRESSURE :
25 214-1 ACTIVE EARTH PRESSURE UNDER NON-SEISMIC CONDITIONS
26 214-2 "AT REST" EARTH PRESSURE UNDER NON-SEISMIC CONDITIONS
27 214-3 PASSIVE EARTH PRESSURE UNDER NON-SEISMIC CONDITIONS
28 214-4 LIVE LOAD SURCHARGE
29 214-5 ACTIVE EARTH PRESSURE UNDER SEISMIC CONDITIONS
30 214-6 PASSIVE EARTH PRESSURE UNDER SEISMIC CONDITIONS
31 214-7 ACTIVE EARTH PRESSURE DUE TO UNIFORM SURCHARGE UNDER SEISMIC CONDITIONS
32 214-8 PASSIVE EARTH PRESSURE DUE TO UNIFORM SURCHARGE UNDER SEISMIC CONDITIONS
33 214-9 ACTIVE' EARTH PRESSURE DUE TO SUBMERGED EARTHFILL UNDER SESIMIC CONDITIONS
34 214-10 PASSIVE' EARTH PRESSURE DUE TO SUBMERGED EARTHFILL UNDER SESIMIC CONDITIONS
35 214-11 LATERAL EARTH PRESSURE COEFFICIENTS FOR COHESIVE SOIL UNDER NON SEISMIC CONDITIONS
Page 4 of 90 1 of 2
EXAMPLE
S.NO. EXAMPLE DESCRIPTION
NO.
215 TEMPERATURE EFFECTS ON BRIDGES :
FORCES INDUCED DUE TO TEMPERATURE DIFFERENCE IN THROUGHT DEPTH OF THE SIMPLY SUPPORTED
36 215-1
BRIDGE
220 BARGE IMPACT ON BRIDGES :
37 220-1 CALCULATION FOR BARGE IMPACT FORCES FOR A BRIDGE
221 SNOW LOAD ON BRIDGES :
38 221-1 CALCULATION FOR SNOW LOAD & CARRIAGEWAY LOAD IN A SIMPLY SUPPORTED BRIDGE
222 VEHICLE COLLISION LOAD ON BRIDGE PIERS :
39 222-1 TYPICAL CALCULATION OF VEHICLE COLLISSION LOAD ON BRIDGE PIERS
Page 5 of 90 2 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
204 - DESIGN FORCES DUE TO CARRIAGEWAY LIVE
DESIGN CALCULATIONS LOADS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT BENDING MOMENT & SHEAR FORCE AT VARIOUS SECTIONS
204-1 i.e (1, 2, & 3) IN 2 LANES SIMPLY SUPPORTED BRIDGE OF EFFECTIVE
SPAN LENGTH 30 METER FOR I.R.C LIVE LOADINGS
CL
1 2 3
30.0 M
0.75 M 15.0 M 0.75 M
7.5 M
15.0M
17OKN
17OKN
17OKN
12OKN
12OKN
8OKN
2.130
1.520
1.370
1.370
3.960 3.050
700KN
4.570
114KN
27KN
27KN
68KN
68KN
68KN
68KN
1.100
1.200
d) SPECIAL VEHICLE
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
180KN
60KN
95KN
95KN
1.370
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
3.200 5.389
Page 6 of 90 1 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
204 - DESIGN FORCES DUE TO CARRIAGEWAY LIVE
DESIGN CALCULATIONS LOADS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT BENDING MOMENT & SHEAR FORCE AT VARIOUS SECTIONS
204-1 i.e (1, 2, & 3) IN 2 LANES SIMPLY SUPPORTED BRIDGE OF EFFECTIVE
SPAN LENGTH 30 METER FOR I.R.C LIVE LOADINGS
10KN 170KN
170KN
170KN
170KN
170KN
120KN
120KN
80KN
1.52
1.37
10KN
(700KN/4.57m)
700KN
4.57
3. CLASS A LOADING
10KN
68KN
114KN
68KN
68KN
68KN
68KN
10KN
180KN
S. NO. LOAD DESCRIPTION IMPACT FACTOR SHEAR FORCE (KN) BENDING MOMENT (KNm)
1. CLASS 70R (W) 1.125 932 -143 ALL DIMENSIONS
2. CLASS 70R (T) 1.1 711 -47 ARE IN METER AND
3. CLASS A 1.125 910 -114 KILONEWTON
4. SPECIAL VEHICLE 1 1889 -136
Page 7 of 90 2 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
204 - DESIGN FORCES DUE TO CARRIAGEWAY LIVE
DESIGN CALCULATIONS LOADS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT BENDING MOMENT & SHEAR FORCE AT VARIOUS SECTIONS
204-1 i.e (1, 2, & 3) IN 2 LANES SIMPLY SUPPORTED BRIDGE OF EFFECTIVE
SPAN LENGTH 30 METER FOR I.R.C LIVE LOADINGS
7.5
7.5
120KN
120KN
170KN
170KN
170KN
8OKN
120KN
120KN
170KN
170KN
170KN
170KN
80KN
3.05 3.96
2.13
1.52
1.37
1.37
3.05 3.96
2.13
1.52
1.37
1.37
700KN
700KN
1.14 3.43
4.57
-2.5KN
0.75 30.0 0.75 0.75 30.0 0.75
3. CLASS A LOADING
56.25KN
7.5KN
114KN
114KN
114KN
114KN
27KN
27KN
27KN
27KN
68KN
68KN
68KN
68KN
68KN
68KN
68KN
68KN
1.20
1.50 (TYP.)
S. NO. LOAD DESCRIPTION IMPACT FACTOR SHEAR FORCE (KN) BENDING MOMENT (KNm)
1. CLASS 70R (W) 1.125 651 5010 ALL DIMENSIONS
2. CLASS 70R (T) 1.1 518 4001 ARE IN METER AND
3. CLASS A 1.125 614 5062 KILONEWTON
4. SPECIAL VEHICLE 1 1076 10125
Page 8 of 90 3 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
204 - DESIGN FORCES DUE TO CARRIAGEWAY LIVE
DESIGN CALCULATIONS LOADS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT BENDING MOMENT & SHEAR FORCE AT VARIOUS SECTIONS
204-1 i.e (1, 2, & 3) IN 2 LANES SIMPLY SUPPORTED BRIDGE OF EFFECTIVE
SPAN LENGTH 30 METER FOR I.R.C LIVE LOADINGS
15.0
-5KN
0.75 30.0 0.75 0.75 30.0 0.75
120KN
120KN
170KN
170KN
170KN
170KN
80KN
3.96 3.05
1.52
2.13
1.37
1.37
-5KN
0.75 30.0 0.75 0.75 30.0 0.75
700KN
4.57
700KN
4.57
-5KN
0.75 30.0 0.75 0.75 30.0 0.75
3. CLASS A LOADING
5KN 75KN
114KN
114KN
27KN
27KN
68KN
68KN
68KN
68KN
114KN
114KN
68KN
68KN
68KN
68KN
27KN
27KN
180KN
180KN
180KN
180KN
1.50 (TYP.)
1.50 (TYP.)
-5KN
0.75 30.0 0.75 0.75 30.0 0.75
S. NO. LOAD DESCRIPTION IMPACT FACTOR SHEAR FORCE (KN) BENDING MOMENT (KNm)
1. CLASS 70R (W) 1.125 370 6613 ALL DIMENSIONS
2. CLASS 70R (T) 1.1 326 5355 ARE IN METER AND
3. CLASS A 1.125 302 6201 KILONEWTON
4. SPECIAL VEHICLE 1 492 13500
Page 9 of 90 4 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Live Loading
A B
30 m
Longitudinal Direction
SOLUTION :
Peir Cap
Page 10 of 90 1 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Peir Cap
CLASS
DESCRIPTION CLASS A TOTAL
70R(W)
Max. B.M at Centre of Span = 3100.67 KNm 6612.98 KNm 9713.65 KNm
Max. Reaction at Support = 469.43 KN 960.99 KN 1430.42 KN
% of Reduction in Longitudinal Effect = 10 10
Reduced B.M at Centre of Span = 2790.60 KNm 5951.68 KNm 8742.28 KNm
Reduced Reaction at Support = 422.49 KN 864.89 KN 1287.4 KN
Page 11 of 90 2 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Peir Cap
Page 12 of 90 3 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Peir Cap
CLASS
DESCRIPTION SV TOTAL
70R(W)
Max. B.M at Centre of Span = 13500.00 KNm 6612.98 KNm 20112.98 KNm
Max. Reaction at Support = 1979.88 KN 960.99 KN 2940.87 KN
% of Reduction in Longitudinal Effect = 0 0
Reduced B.M at Centre of Span = 13500.00 KNm 6612.98 KNm 20112.98 KNm
Reduced Reaction at Support = 1979.88 KN 960.99 KN 2940.87 KN
Page 13 of 90 4 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
205 - REDUCTION IN THE LONGITUDINAL EFFECT ON
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
Live Loading
A B
30 m
Longitudinal Direction
SOLUTION :
Carriageway-A Carriageway-B
DESCRIPTION
CLASS A CLASS A
Max. B.M at Centre of Span = 6201.34 KNm 6201.34 KNm
Max. Reaction at Support = 938.86 KN 938.86 KN
% of Reduction in Longitudinal Effect = 0 0
Page 14 of 90 5 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
205 - REDUCTION IN THE LONGITUDINAL EFFECT ON
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
SOLUTION :
0.5 m 15 m 0.5 m
CLASS 70 R(W)
CLASS A CLASS A
Peir Cap
Page 15 of 90 6 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
205 - REDUCTION IN THE LONGITUDINAL EFFECT ON
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
SOLUTION :
0.5 m 15 m 0.5 m
Peir Cap
DESCRIPTION TOTAL
CLASS 70R(W) CLASS 70R(W)
Max. B.M at Centre of Span = 6612.98 KNm 6612.98 KNm 13225.96 KNm
Max. Reaction at Support = 960.99 KN 960.99 KN 1921.97 KN
% of Reduction in Longitudinal Effect = 20 20
Hence
Reduced B.M at Centre of Span = 5290.38 KNm 5290.38 KNm 10580.77 KNm
Reduced Reaction at Support = 768.79 KN 768.79 KN 1537.58 KN
Page 16 of 90 7 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
205 - REDUCTION IN THE LONGITUDINAL EFFECT ON
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
SOLUTION :
0.5 m 15 m 0.5 m
CLASS 70 R(T)
CLASS A CLASS A
Peir Cap
Page 17 of 90 8 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
205 - REDUCTION IN THE LONGITUDINAL EFFECT ON
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
SOLUTION :
1.8 m 1.8 m 3m
Carriageway-A Carriageway-B
DESCRIPTION
CLASS A SV
Max. B.M at Centre of Span = 6201.34 KNm 13500.00 KNm
Max. Reaction at Support = 938.86 KN 1979.88 KN
% of Reduction in Longitudinal Effect = 0 0
Page 18 of 90 9 of 9
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
206 - FOOT OVER BRIDGE, FOOTWAY, KERB, RAILING,
DESIGN CALCULATIONS PARAPET AND CRASH BARRIERS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL LOADS ON PEDESTRIAN RAILING.
206-1 (Clause 206.5)
1.8 m
0.5 m
Horizontal
Rails 1.5 m
0.15 m
.
Vertical Post Kerb 0.1 m
Railing
Crash
7.5kN/m Kerb
14.15 m
Both sided footpath & Railing ,Transverse Direction
SOLUTION :
PRELIMINARY DATA:
C/c of Vertical Post = 1.8 m
Height of vertical Posts = 1.5 m
Horizontal load on horizontal railing = 1.5 kN/m
Vertical load on Horizontal railing = 1.5 kN/m
Horizontal load at top of vertical post = 1.5 X 1.8
= 2.7 kN
1.5 KN/m
1.5 m
1.5 KN/m
Loading on Railing
Loading on Solid Parapet Loading on Post
Page 19 of 90 1 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
206 - FOOT OVER BRIDGE, FOOTWAY, KERB, RAILING,
DESIGN CALCULATIONS PARAPET AND CRASH BARRIERS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
VERTICAL LOADS ON FOOTHPATH FOR A SIMPLY SUPPORTED SPAN
206-2 OF EFFECTIVE SPAN LENGTH 30 M.(Clause 206.3)
A B
30 m
0.75 m 0.75 m
Longitudinal Direction
Barrier
Crash
Railing
Footpath
SOLUTION :
For L = 30 m
Page 20 of 90 2 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
206 - FOOT OVER BRIDGE, FOOTWAY, KERB, RAILING,
DESIGN CALCULATIONS PARAPET AND CRASH BARRIERS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
VERTICAL LOADS ON FOOTHPATH FOR A CONTINUOUS SUPPORTED
206-3 DECK OF EFFECTIVE SPAN LENGTHS 7 M, 30 M, 45 M. (Clause 206.3)
A B C D
0.75 m 7m 30 m 45 m 0.75 m
Longitudinal Direction
Barrier
Crash
Railing
Footpath
DATA:
SPAN-I SPAN-II SPAN-III
Effective Span Length (L)] = 7 30 45 m
Width of Footpath (W) = 1.5 m
Loading (P') = 4 KN/m2
Span-I :
For effective span Length of 7.5 m or less the intensity of load shall be
(Reference Clause : 206.3(a)) :
2
P = 4 KN/m (Load Intensity on one footpath)
Page 21 of 90 3 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
206 - FOOT OVER BRIDGE, FOOTWAY, KERB, RAILING,
DESIGN CALCULATIONS PARAPET AND CRASH BARRIERS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
VERTICAL LOADS ON FOOTHPATH FOR A CONTINUOUS SUPPORTED
206-3 DECK OF EFFECTIVE SPAN LENGTHS 7 M, 30 M, 45 M. (Clause 206.3)
Span-II :
For effective spans of over 7.5 but not exceeding 30 m, the intensity of load
shall be determined according to the equation(Reference Clause 206.3 (b))
Span-III :
Page 22 of 90 4 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
LIVE LOADING
A B
0.75 m 30 m 0.75 m
SOLUTION :
Impact Factor
Impact Factor 4.5
= = 10 %
Equation (6+Leff.)
(Graph)
Page 23 of 90 1 of 1
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
LIVE LOADING
A B C
0.75 m 30 m 20 m 0.75 m
A B C
0.75 m 30 m 20 m 0.75 m
Impact Factor 9
= Impact Factor = 25 %
Equation (13.5+Leff.)
Page 24 of 90 1 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
A B C
0.75 m 30 m 20 m 0.75 m
For Live Load portion on Shorter Span : For Live Load portion on Shorter Span :
Effective Span Effective Span
= 20 m = 20 m
Length(Leff.) Length(Leff.)
Impact Factor 9
= Impact Factor = 25 %
Equation (13.5+Leff.)
Impact Factor values calculated above are as per IRC guidelines, but for simplification, consider the
smaller span for calculation of impact factor when both spans are loaded.
Page 25 of 90 2 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Cantilever arms
A B E C D
Hinge
0.75 m 50 m 20 m 20 m 40 m 0.75 m
WHEELDED (CLASS-AA/CLASS-70R)
CLASS-A/CLASS-B LOADING
LOADING
Cantilever Span (BE)/(EC) Cantilever Span (BE)/(EC)
Over all Length (L) = 20 m Over all Length (L) = 20 m
Effective Span 20 x 0.75 Effective Span 20 x 0.75
= =
Length(Leff.) 15 m Length(Leff.) 15 m
Page 26 of 90 1 of 1
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
A B E F C D
0.75 m 40 m 10 m 20 m 10 m 40 m
0.75 m
Page 27 of 90 1 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Page 28 of 90 2 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Page 29 of 90 1 of 1
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
HANGER
6.5 m
52 m
12 m
SOLUTION :
Effective Span Length for calcuation of impact factor for hangers (Leff) = 12 m
WHEELDED (CLASS-AA/CLASS-70R)
CLASS-A/CLASS-B LOADING
LOADING
Effective Span Effective Span
= 12 m = 12 m
Length(Leff.) Length(Leff.)
Page 30 of 90 1 of 1
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-1 WELL FOUNDATION , DUE TO WATER CURRENTS (Clause 210.2)
DIRECTION OF
TRAFFIC
DIRECTION OF
CIRCULAR PIER WATER CURRENT
RIVER BELOW
PLAN
HFL = 201 m
CIRCULAR PIER
2m
WELL CAP TOP = 189 m
CIRCUALR
Well CAP
WELL CAP BOTTOM = 188.6 m
CIRCULAR
WELL
MAX. SCOUR LEVEL = 181 m
6m
Page 31 of 90 1 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-1 CIRCULARWELL PIER IN TRANSVERSE
FOUNDATION DIRECTION
, DUE TO WATER OF(Clause
CURRENTS TRAFFIC210.2)
Preliminary Data :
Width of Circluar Pier = 2 m
Width of Circular Well cap = 7 m
Width of Circualar WELL = 6 m
Heightest Flood Level (HFL) = 201 m
Well Cap Top Level = 189 m
WellCap Bottom Level = 188.6 m
Max. Scour Level (MSL) = 181 m
Max. Mean Velocity (V) = 2 m/sec
Max. Velocity at free surface,at HFL (V2 = 2V 2) = 8 m/sec
2 2
Max. Velocity at Top of Well Cap (U = v x 8 / 20) = 3.2 m/sec
2 2
Max. Velocity at Bottom of Well Cap(U = v x7.6 / 20) = 3.04 m/sec
k For Circular Pier , Well Cap, Well = 0.66
SOLUTION :
8 m/sec
HFL = 201 m
12 m
7.6 m
Velocity Distribution
Page 32 of 90 2 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-1 WELL FOUNDATION , DUE TO WATER CURRENTS (Clause 210.2)
On Piers parallel to the direction of the water current , the intensity of pressure shall be calculated from
the following equation:
P = 52KV2
where,
P = Intensity of Pressure due to water current, in Kg/m2
V = Velocity of the Current (m/sec)
K = Constant, having values for different shapes of Pier
12 m
WELL TOP
1.04 KN/m2
P = (52 x 0.66 x 3.04)/100 = 1.04
= 188.6 m
7.6 m
MAX. SCOUR
LEVEL = 181 m
Pressure Distribution
Page 33 of 90 3 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-1 WELL FOUNDATION , DUE TO WATER CURRENTS (Clause 210.2)
Force KN
HFL = 201 m
Total Force on Pier
46.13
46.13 KN 12 m F = 0.5x(21.96+3.51)x12x2 =
PIER BOTTOM
= 189 m
WELL TOP
= 188.6 m
Total Force on Well
23.79 KN 23.79
7.6 m F = 0.5 x 3.17 x 7.6 x 6 =
MAX. SCOUR
LEVEL = 181 m
Force Distribution
Page 34 of 90 4 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-2 WELL FOUNDATION IN SKEW WITH WATER CURRENTS (Clause 210.4)
a= 100
DIRECTION OF
CIRCULAR PIER WATER CURRENT
RIVER BELOW
PLAN
HFL = 201 m
CIRCULAR PIER
2m
WELL CAP TOP = 189 m
CIRCUALR
Well CAP
WELL CAP BOTTOM = 188.6 m
CIRCULAR
WELL
MAX. SCOUR LEVEL = 181 m
6m
Page 35 of 90 5 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-2 CIRCULARWELL PIER IN TRANSVERSE
FOUNDATION DIRECTION
IN SKEW WITH OF TRAFFIC
WATER CURRENTS (Clause 210.4)
Preliminary Data :
Width of Circluar Pier = 2 m
Width of Circular Well cap = 7 m
Width of Circualar WELL = 6 m
Heightest Flood Level (HFL) = 201 m
Well Cap Top Level = 189 m
WellCap Bottom Level = 188.6 m
Max. Scour Level (MSL) = 181 m
Max. Mean Velocity (V) = 2 m/sec
Max. Velocity at free surface,at HFL (V2 = 2V 2) = 8 m/sec
2 2
Max. Velocity at Top of Well Cap (U = v x 8 / 20) = 3.2 m/sec
2 2
Max. Velocity at Bottom of Well Cap(U = v x7.6 / 20) = 3.04 m/sec
k For Circular Pier , Well Cap, Well = 0.66
Skew Angle (a) = 10 deg
SOLUTION :
8 m/sec
HFL = 201 m
12 m
7.6 m
Velocity Distribution
Page 36 of 90 6 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-2 WELL FOUNDATION IN SKEW WITH WATER CURRENTS (Clause 210.4)
On Piers parallel to the direction of the water current , the intensity of pressure shall be calculated from
the following equation:
P = 52KV2
where,
P = Intensity of Pressure due to water current, in Kg/m2
V = Velocity of the Current (m/sec)
K = Constant, having values for different shapes of Pier
12 m
WELL TOP
1.04 KN
P = (52 x 0.66 x 3.04)/100 = 1.04
= 188.6 m
7.6 m
MAX. SCOUR
LEVEL = 181 m
Pressure Distribution
Page 37 of 90 7 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-2 WELL FOUNDATION IN SKEW WITH WATER CURRENTS (Clause 210.4)
Force KN
HFL = 201 m
Total Force on Pier
46.13
46.13 KN 12 m F = 0.5x(21.96+3.51)x12x2 =
PIER BOTTOM
= 189 m
WELL TOP
= 188.6 m
Total Force on Well
23.79 KN 23.79
7.6 m F = 0.5 x 3.17 x 7.6 x 6 =
MAX. SCOUR
LEVEL = 181 m
Force Distribution
To provide against possible variation of the direction of the current from the direction assumed in the
design, allowance shall be made in the design of components for an extra variation in the water current
direction of 20 degree(Clasue 210.5)
Page 38 of 90 8 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-3 OPEN FOUNDATION ON PUCCA FLOOR (Clause 210.6)
DIRECTION OF
TRAFFIC
DIRECTION OF
CIRCULAR PIER WATER CURRENT
RIVER BELOW
PLAN
HFL = 201 m
h = 0.25 m
CIRCULAR PIER
10 m
PUCCA FLOOR
(INERODIBLE BED)
3m
PFL = 191 m
CURTAIN
WALL
OPEN
FOUNDATION
Page 39 of 90 9 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-3 OPEN FOUNDATION ON PUCCA FLOOR (Clause 210.6)
Preliminary Data :
Width of Circluar Pier = 3 m
Heightest Flood Level (HFL) = 201 m
Max. Scour Level (MSL) = 181 m
Pucca Floor Level (PFL) = 191 m
Max. Mean Velocity (V) = 2 m/sec
Max. Velocity at free surface, at HFL (V2 = 2V 2) = 8 m/sec
k For Circular Pier = 0.66
Difference of head b/w opp. Faces of Piers (h) = 0.25 m
Unit Weight of Water (g) = 10 KN/m3
8 m/sec
HFL = 201 m
10 m
Velocity Distribution
On Piers parallel to the direction of the water current , the intensity of pressure shall be calculated from
the following equation:
P = 52KV2
where,
2
P = Intensity of Pressure due to water current, in Kg/m
V = Velocity of the Current (m/sec)
K = Constant, having values for different shapes of Pier
Page 40 of 90 10 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-3 OPEN FOUNDATION ON PUCCA FLOOR (Clause 210.6)
10 m 10 m
PUCCA FLOOR
LEVEL = 191 m
Pressure Intensity
P = (52 x 0.66 x 82)/100 = 2.75 KN/m2
P = (g x 0.25) , where g =10 = 2.5 KN/m2
P = 0.5 x 2.75 x 10 x 3
= 41.18 KN
Total Static Force due to Head Difference b/w opposite faces of Piers :
P = 2.5 x 10 x 3
= 75.00 KN
The Force due to water currents is less than that of Static Force due to difference of head of 250 mm
between the opposite faces of a pier , therefore static force(i.e p = 75kN) will be considered for design
of the pier.
Page 41 of 90 11 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-4 PILE FOUNDATION DUE TO WATER CURRENTS (Clause 210.7)
DIRECTION OF
TRAFFIC
DIRECTION OF
CIRCULAR PIER WATER CURRENT
RIVER BELOW
PLAN
HFL = 201 m
CIRCULAR PIER
3m
PIER CAP TOP = 189 m
RECTANGULAR
PILE CAP
PIER CAP BOTTOM = 188.6 m
CIRCULAR
PILE
MAX. SCOUR LEVEL = 181 m
1m 2.5 m
Page 42 of 90 12 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-4 CIRCULAR PIER IN TRANSVERSE
PILE FOUNDATION DIRECTION
DUE TO WATER CURRENTSOF TRAFFIC
(Clause 210.7)
Preliminary Data :
Width of Circluar Pier = 3 m
Width of Rectangular Pile cap = 7 m
Width of Circular Pile = 1 m
Number of piles in a row in Longitudinal Direction = 3
Number of piles in a row in Transverse Direction = 3
c/c Spacing bewteen Piles = 2.5 m
Heightest Flood Level (HFL) = 201 m
Pile Cap Top Level = 189 m
Pile Cap Bottom Level = 188.6 m
Max. Scour Level (MSL) = 181 m
Max. Mean Velocity (V) = 2 m/sec
Max. Velocity at free surface (V2 = 2V 2) = 8 m/sec
2 2
Max. Velocity at Top of Pile Cap (U = v x 8 / 20) = 3.2 m/sec
2 2
Max. Velocity at Bottom of Pile Cap(U = v x7.6 / 20) = 3.04 m/sec
k For Circular Pier = 0.66
k For Rectangular Pile cap = 1.5
k For Piles (c/c spacing b/w piles < 3 x widh of pile) = 1.25
Free Surface of Water
8 m/sec
HFL = 201 m
12 m
7.6 m
MAX. SCOUR LEVEL = 181 m
Velocity Distribution
On Piers parallel to the direction of the water current , the intensity of pressure shall be calculated from
the following equation:
2
P = 52KV
where,
P = Intensity of Pressure due to water current, in Kg/m2
V = Velocity of the Current (m/sec)
K = Constant, having values for different shapes of Pier
Page 43 of 90 13 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-4 PILE FOUNDATION DUE TO WATER CURRENTS (Clause 210.7)
12 m
7.6 m
MAX. SCOUR
LEVEL = 181 m
Pressure Distribution
PILE TOP
Total Force on Pile
= 188.6 m 45.05 KN 45.05
F = 0.5 x 6.01 x 7.6 x 6 =
7.6 m
MAX. SCOUR
LEVEL = 181 m
Force Distribution
Page 44 of 90 14 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS 210 - HORIZONTAL FORCES DUE TO WATER CURRENTS
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT HORIZONTAL FORCES ON CIRCULAR BRIDGE PIER HAVING
210-4 Force
PILE Distribution
FOUNDATION DUE TO WATER CURRENTS (Clause 210.7)
To provide against possible variation of the direction of the current from the direction assumed in the
design, allowance shall be made in the design of components for an extra variation in the water current
direction of 20 degree(Clasue 210.5)
Fsin f
2
Total Water current force in Transverse Direction =
Total Water current force in Longitudinal Direction = Fcos2f
f = 20 deg
Page 45 of 90 15 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
DERIVE EXPRESSIONS FOR HORIZONTAL FORCES IN BEARINGS OF SIMPLY
211-1 SUPPORTED SPAN & CONTINUOUS SPAN ON UNYIELDING SUPPORTS. (Clause
211.5.1 & 211.5.2)
Live Loading
A B
Fix Free
Rga = D.L Reaction at 'A' Rgb = D.L Reaction at 'B'
+ +
Rqa = L.L Reaction at 'A' Rqb = L.L Reaction at 'B'
SOLUTION :
Due to Temperature Fall,deck will undergo an contraction, Free Bearing will resist will resist movement upto a force of
m( R gb +R qb ), and equal & opposite force will be generated at Fixed Bearing.
A B
FRICTIONAL FORCE DUE TO HORIZONTAL FORCES ON THE DECK ALONG WITH TEMPERATURE EFFECT :
The Free Bearing will not move till it is subjected to a force of 2 m (R gb +R qb ) in the oppsite direction.Till that time it will
act as Fixed Bearing.Thus both Bearings will share equally the applied force F h .
Fh
A B
The Free Bearing would not be able to take any further force & the full F h is transferred to the Fixed Bearing.
Fh
A B
Page 46 of 90 1 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
DERIVE EXPRESSIONS FOR HORIZONTAL FORCES IN BEARINGS OF SIMPLY
211-1 SUPPORTED SPAN & CONTINUOUS SPAN ON UNYIELDING SUPPORTS. (Clause
211.5.1 & 211.5.2)
b) SIMPLY SUPPORTED SPAN WITH IDENTICAL 'ELASTOMERIC' BEARINGS.(Clause 211.5.1.3)
Live Loading
A B
SOLUTION :
Where
Vr = (GAc / hc)
G = Shear modulus in Mpa
Ac = Plan area of elastomeric bearing
hc = Height of elastomeric bearing
ltc = Movement of deck above bearing, other than due to applied force(i.e
temperature,creep,shrinkage,elastic shortening)
A B
Vrltc Vrltc
FRICTIONAL FORCE DUE TO HORIZONTAL FORCES ON THE DECK ALONG WITH TEMPERATURE, SHRINKAGE &
CREEP EFFECT
Fh
A B
Vrltc Vrltc
Fh/2 Fh/2
Fh
A B
Vrltc Vrltc
Fh/2 Fh/2
Page 47 of 90 2 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
DERIVE EXPRESSIONS FOR HORIZONTAL FORCES IN BEARINGS OF SIMPLY
211-1 SUPPORTED SPAN & CONTINUOUS SPAN ON UNYIELDING SUPPORTS. (Clause
211.5.1 & 211.5.2)
c) CONTINUOUS SPAN SUPPORTED THROUGH 'FIXED' BEARING AT INTERMEDIATE PIER & 'FREE'
BEARINGS AT REMAINING PIERS.(Clause 211.5.2)
Live Loading
A B C D E
Free Fixed
SOLUTION :
Following calculations for Horizontal Forces on the supports are due to Expansion of Bridge Deck only, similar
procedure can be followed for Contraction of Bridge Deck also.
Case-I: Fh is in direction (A → E)
A B C D E
Temp. Force
mR
mL mL mR
Horiz. Force
Fh/(1+nL) X (nL) Fh/(1+nL)
Net Force
upto mL Fh/(1+nL)+(mL- mR) mR
Forces on Deck
Fh
A B C D E
mR
mL mR
Temp. Force mL
Horiz. Force
Fh-2mL
2mL
Net Force
mL Fh - (mL+mR) mR
Page 48 of 90 3 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
DERIVE EXPRESSIONS FOR HORIZONTAL FORCES IN BEARINGS OF SIMPLY
211-1 SUPPORTED SPAN & CONTINUOUS SPAN ON UNYIELDING SUPPORTS. (Clause
mL
211.5.1 & 211.5.2) h
Case-II: Fh is in direction (E → A)
A B C D E
mR
Temp. Force mL mL mR
Horiz. Force
Fh/(1+nR) Fh/(1+nR) X (nR)
Net Force
mL Fh/(1+nR)-(mL - mR) upto mR
A B C D E
mR
Temp. Force mL mL mR
Horiz. Force
Fh-2mR 2mR
Net Force
mL Fh - (mL+mR) mR
Where,
nL and nR = Number of bearings to the left and right of the fixed bearing
respectively.
mR = Total Horizontal force developed on the free bearings to the right of
the fixed bearing
mL = Total Horizontal force developed on the free bearings to the left of the
= fixed bearing
Fh = Horizontal force applied on the Bridge.
Page 49 of 90 4 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
DERIVE EXPRESSIONS FOR HORIZONTAL FORCES IN BEARINGS OF SIMPLY
211-1 SUPPORTED SPAN & CONTINUOUS SPAN ON UNYIELDING SUPPORTS. (Clause
211.5.1 & 211.5.2)
d) FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING SIMPLE SPANS FROM ITS RIGHT (R) AND LEFT
(L) SIDES THROUGH ELASTOMERIC BEARING BEARINGS & 'FIXED', 'FREE' BEARINGS RESPECTIVELY ON
UNYIELDING SUPPORTS
Case-I : When Vehicles are moving from left to right on the Bridge
FhL FhR
A B C D
Vrltc Vrltc
m(Rgb + Rqb) m(Rgb + Rqb)
Fh/2 Fh/2
FhL
Case-II : When Vehicles are moving from rigth to left on the Bridge
FhL FhR
A B C D
Vrltc Vrltc
m(Rgb + Rqb) m(Rgb + Rqb)
Fh/2 Fh/2
FhL/2 max 2m(Rgb + Rqb)
FhL FhR
A B C D
Vrltc Vrltc
m(Rgb + Rqb) m(Rgb + Rqb)
Fh/2 Fh/2
FhL- 2m(Rgb + Rqb) 2m(Rgb + Rqb)
Page 50 of 90 5 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM HORIZONTAL FORCES AT 'FIXED' & 'FREE' END FOR SIMPLY
211-2 SUPPORTED DECK WITH 'FIXED' AND 'FREE' BEARINGS ON UNYIELDING SUPPORTS.
(Clause 211.5.1)
a) SIMPLY SUPPORTED DECK OF EFFECTIVE SPAN LENGTH 30 m UNDER CLASS 70 R(W) LOADING (Clause
211.5.1.1)
Preliminary Data:
Overall Span Length (L, c/c exp. gap) = 31.5 m
Effective Span Length (Leff.) = 30 m
Dead Load of the Deck (UDL) = 200 KN/m (say)
Max. Reaction at Support 'B' due to Dead
= 3150 KN
Load, (Rgb)
CLASS 70 R(W) Weight (without impact) = 1000 KN
CLASS 70 R(W) Weight (with impact) = 1125 KN
Max. Reaction at Support 'B' due to Live
= 960.98 KN
Load, (Rqb)(with Impact)
Coefficient of Friction between Teflon & 0.03
= (Whichever governs)
Stainless steel (m) 0.05
SOLUTION :
C.G OF CLASS 70 R(W)
A B
Fix Free
Rgb = 3150 KN
4.38 m +
Rqb = 961 KN
0.75 m 30 m 0.75 m
31.5 m
Page 51 of 90 6 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM HORIZONTAL FORCES AT 'FIXED' & 'FREE' END FOR SIMPLY
211-2 SUPPORTED DECK WITH 'FIXED' AND 'FREE' BEARINGS ON UNYIELDING SUPPORTS.
(Clause 211.5.1)
b) SIMPLY SUPPORTED DECK OF EFFECTIVE SPAN LENGTH 30 m UNDER 2-LANES OF CLASS A LOADING
(Clause 211.5.1.1)
Preliminary Data:
Overall Span Length (L, c/c exp. gap) = 31.5 m
Effective Span Length (Leff.) = 30 m
Dead Load of the Deck (UDL) = 200 KN/m (say)
Max. Reaction at Support 'B' due to Dead
= 3150 KN
Load, (Rgb)
1-Lanes of Class A, Weight (The train
= 554 KN
loads in one lane only is considered)
SOLUTION :
C.G OF CLASS A
A B
Fix Free
Rgb = 3150 KN
4.05 m +
Rqb = 938.9 KN
0.75 m 30 m 0.75 m
31.5 m
Page 52 of 90 7 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING,
DESIGN CALCULATIONS SHRINKAGE & TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM HORIZONTAL FORCES AT 'FIXED' & 'FREE' END FOR SIMPLY
211-2 SUPPORTED DECK WITH 'FIXED' AND 'FREE' BEARINGS ON UNYIELDING SUPPORTS.
(Clause 211.5.1)
c) SIMPLY SUPPORTED DECK OF EFFECTIVE SPAN LENGTH 30 m UNDER SPECIAL VEHICLE LOADING
(Clause 211.5.1.1)
Preliminary Data:
Overall Span Length (L, c/c exp. gap) = 31.5 m
Effective Span Length (Leff.) = 30 m
Dead Load of the Deck (UDL) = 200 KN/m (say)
Max. Reaction at Support 'B' due to Dead
= 3150 KN
Load, (Rgb)
Special Vehicle Weight = 3850 KN
Max. Reaction at Support 'B' due to Live
= 1978.2 KN
Load, (Rqb)
Coefficient of Friction between Teflon & 0.03
= (Whichever governs)
Stainless steel (m) 0.05
A B
Fix Free
Rgb = 3150 KN
+
14.89 m Rqb = 1978.2 KN
0.75 m 30 m 0.75 m
31.5 m
Page 53 of 90 8 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING, SHRINKAGE &
DESIGN CALCULATIONS TEMPERATURE
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING SIMPLE
211-3 SPANS FROM ITS RIGHT (R) AND LEFT (L) SIDES THROUGH 'FIXED' & 'FREE' BEARINGS
RESPECTIVELY ON UNYIELDING SUPPORTS. (Clause 211.5.1)
a) TWO SIMPLY SUPPORTED DECKS OF EFFECTIVE SPAN LENGTH 30 M AND 40 M UNDER CLASS 70 R(W)
LOADING (Clause 211.5.1.1)
Preliminary Data:
Span Description Left Span Right Span
Overall Span Length (L) c/c
= LL0 31.5 m LR0 41.5 m
exp. Gap
Effective Span Length(Leff.) = LL 30 m LR 40 m
Dead Load of the Deck = (UDL)L 200 KN/m(say) (UDL)R 220 KN/m(say)
SOLUTION : For this Problem, two cases with both directions will govern maximum frictional forces at intermediate
pier as follow:
Case-I :
A B C D
Fix Free
7.52 m
4.38 m
Rgb = 3150 KN Rgd = 4565 KN
+ +
Rqb = 164.1 KN Rqd = 880.3 KN
30 m 0.75 m 40 m 0.75 m
0.75 m 0.75 m
Left Span Right Span
D
Step 1 : Total D.L + L.L Reaction at Free end = B (Rgb+Rqb) 3314.14 KN 5445.31 KN
(Rgd+Rqd)
Step 2 : Applied horizontal force on the
= FhL 100 KN FhR 200 KN
Deck, on span under consideration (Fh)
Page 54 of 90 9 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING, SHRINKAGE &
DESIGN CALCULATIONS TEMPERATURE
WORKED EXAMPLE NO.
TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING SIMPLE
211-3 SPANS FROM ITS RIGHT (R) AND LEFT (L) SIDES THROUGH 'FIXED' & 'FREE' BEARINGS
RESPECTIVELY ON UNYIELDING SUPPORTS. (Clause 211.5.1)
a) TWO
(ii) SIMPLY SUPPORTED
Vehicles DECKS
are moving OFD→A
from EFFECTIVE SPAN LENGTH 30 M AND 40 M UNDER CLASS 70 R(W)
LOADING (Clause 211.5.1.1)
C.G OF CLASS 70 R(W) C.G OF CLASS 70 R(W)
A B C D
Fix Free
4.38 m
7.52 m
Rgb = 3150 KN Rgd = 4565 KN
+ +
Rqb = 282.3 KN Rqd = 969.75 KN
30 m 0.75 m 40 m 0.75 m
0.75 m 0.75 m
Left Span Right Span
D
Step 1 : Total D.L + L.L Reaction at Free end = B (Rgb+Rqb) 3432.26 KN 5534.75 KN
(Rgd+Rqd)
Case-II :
A B C D
Fix Free
9.37 m 7.52 m
30 m 0.75 m 40 m 0.75 m
0.75 m 0.75 m
Left Span Right Span
D
Step 1 : Total D.L + L.L Reaction at Free end = B (Rgb+Rqb) 3432.26 KN 5445.31 KN
(Rgd+Rqd)
Step 2 : Applied horizontal force on the Deck
= FhL 0 KN FhR 200 KN
,on span under consideration (Fh)
Page 55 of 90 10 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING, SHRINKAGE &
DESIGN CALCULATIONS TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING SIMPLE
211-4 SPANS FROM ITS RIGHT (R) AND LEFT (L) SIDES THROUGH 'ELASTOMERIC BEARINGS' AND
'FIXED' & 'FREE' BEARING RESPECTIVELY.
Preliminary Data:
Span Description Left Span Right Span
Over all Span Length = L 31.5 m L 41.5 m
Effective Span Length = LL 30 m LR 40 m
Dead Load of the Deck = (UDL)L 200 KN/m (UDL)R 220 KN/m
Max. Reaction due to (D.L) at
Free Support = B (Rgb) 3150 KN D (Rgd) 4565 KN
SOLUTION :
CLASS 70R (W) CLASS 70R (W)
A B C D
0.75 m 30 m 40 m 0.75 m
Page 56 of 90 11 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING, SHRINKAGE &
DESIGN CALCULATIONS TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING CONTINUOUS
211-5 DECK OF (4 X 30 M) SPANS SUPPORTED THROUGH 'FIXED' BEARING AT INTERMEDIATE PIER
AND 'FREE' BEARING AT REMAINING PEIRS RESPECTIVELY.
Preliminary Data:
Overall Span Length (L, c/c exp. gap) = 121.5 m
Effective Span Length (Leff.) = 30 m
Dead Load of the Deck (UDL) = 200 KN/m (say)
Max. Reaction at Support 'A' & 'E' due to
= 3151.8 KN
Dead Load, (Rga) & (Rge)
Max. Reaction at Support 'B' & 'D' due to
= 5998.2 KN
Dead Load, (Rgb) & (Rgd)
Number of Free Bearings to the Left of
= 2
Fixed Bearing(nL)
Number of Free Bearings to the Right of
= 2
Fixed Bearing(nR)
1-Lane of Class 70-R(W) , Weight = 1000 KN
1-Lane of Class 70-R(W) , (impact) = 1125 KN
Coefficient of Friction between Teflon & 0.03
= (Whichever governs)
Stainless steel (m) 0.05
A B C D E
0.75 m 30 m 30 m 30 m 30 m 0.75 m
Page 57 of 90 12 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING, SHRINKAGE &
DESIGN CALCULATIONS TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING CONTINUOUS
211-5 DECK OF (4 X 30 M) SPANS SUPPORTED THROUGH 'FIXED' BEARING AT INTERMEDIATE PIER
AND 'FREE' BEARING AT REMAINING PEIRS RESPECTIVELY.
A B C D E
0.75 m 30 m 30 m 30 m 30 m 0.75 m
Page 58 of 90 13 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
211 - LONGITUDINAL FORCES DUE TO FRICTION, BRAKING, SHRINKAGE &
DESIGN CALCULATIONS TEMPERATURE
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT MAXIMUM FRICTIONAL FORCES AT INTERMEDIATE PIER SUPPORTING CONTINUOUS
211-5 DECK OF (4 X 30 M) SPANS SUPPORTED THROUGH 'FIXED' BEARING AT INTERMEDIATE PIER
AND 'FREE' BEARING AT REMAINING PEIRS RESPECTIVELY.
A B C D E
0.75 m 30 m 30 m 30 m 30 m 0.75 m
Page 59 of 90 14 of 14
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS
212 - CENTRIFUGAL FORCES ON BRIDGES
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
CENTRIFUGAL FORCE ON INTERMEDIATE PIER, SUPPORTING ADJACENT SIMPLE
212-1 SPANS.(Clause 212.2)
Preliminary Data:
Span Description Left Span Right Span
Deck Length = LL 30 m LR 45 m
Live Load on the Deck (Without CLASS CLASS
= 1000 KN 1000 KN
Impact) 70 R(W) 70 R(W)
Max. Reaction due to (L.L) at
= B (Rqb) 855.8 KN C (Rqc) 182.8 KN
Intermediate Support
Radius of Curvature(R) = 1600 m
Design Speed of Vehicle(V) = 120 Km/hr
SOLUTION :
A B C D
37.48 m
4.38 m
30 m 45 m
0.75 m 0.75 m
0.75 m Expansion Joint 40 mm
WV2
C = KN
127R
= 73.60 KN
This force acts at 1.2m above deck level and causes transverse moment in the pier and the
reactions on bearings should be calculated for the same.
Page 60 of 90 1 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
DESIGN CALCULATIONS
212 - CENTRIFUGAL FORCES ON BRIDGES
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
CENTRIFUGAL FORCE ON INTERMEDIATE PIER, SUPPORTING CONTINUOUS SPAN.
212-2 (Clause 212.2)
Preliminary Data:
Span Description Left Span Right Span
Deck Length = LL 30 m LR 45 m
Live Load on the Deck (Without CLASS CLASS
= 1000 KN 1000 KN
Impact) 70 R(W) 70 R(W)
Max. Reaction due to (L.L) at
= B (Rqb) 1221.6 KN
Intermediate Support
Radius of Curvature (R) = 1600 m
Design Speed of Vehicle (V) = 120 Km/hr
SOLUTION :
A B D
12.98 m 30.42 m
Rqb = 1221.6 KN
0.75 m 30 m 45 m
0.75 m
Super Structure- Profile
WV2
C = KN
127R
= 86.57 KN
This force acts at 1.2m above deck level and causes transverse moment in the pier and the
reactions on bearings should be calculated for the same.
Page 61 of 90 2 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
RL=110.65 m
h1 t1 WL=110.27 m
H
B
PCC Surface
h2 t4
Outer Intermediate
t2 Slab
wall
h3 Plum concrete
t3 t5
h4 Heel
FL=110.27 m
b1 b2 b3 b4 b5
Bottom Slab
Cross Section of U-Wall
SOLUTION :
Dimensions of U-Wall
h1 = 2.50 m b1 = 1.20 m t1 = .30 m Where :
h2 = 4.55 m b2 = 1.00 m t2 = .30 m t1-Wall
h3 = 2.60 m b3 = 5.50 m t3 = 2.30 m Thickness at top
h4 = 1.00 m b4 = 5.50 m t4 = .53 m
t2-
b5 = 1.20 m t5 = 1.00 m
Intermediate slab t3-
Plum Concrete
H = 10.65 m B = 23.20 m t4- Thickness of
Design Data
Top level of U-Wall/construction joint = 110.65 m
Founding Level = 100 m
Total height from top of wall to founding level = 10.65 m
Normal Water level = 110.267 m
Seismic Water Level, (1.5m below N.W.L) = 108.767 m
Unit weight of concrete c = 25.00 KN/m3
Unit weight of water w = 10.00 KN/m3
Unit weight of PCC pcc = 22.00 KN/m3
SEISMIC CALCULATIONS
Zone factor for seismic zone IV, Z Z = 0.24
Acceleration coefficient Sa/g = 1.0
Importance Factor I = 1.2
Response Reduction Factor, R R = 1
Ah = (Z/2) x (I/R) x (Sa/g) AH = 0.144
Av = 2/3x Ah AV = 0.096
Page 62 of 90 1 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Normal Vertical
Breadth Weight Seismic
Component of U-Wall Nos Area (m2) V olume (m3) force(KN)
(m)
(KN) W WxAv
Outer Walls 2 1 6.308 12.615 315.38 30.28
Bottom Slab 1 1 25.200 25.2 630.00 60.48
Intermediate Slab 1 1 6.960 6.96 174.00 16.70
Heel 2 1 1.200 2.4 60.00 5.76
PCC filling carriageway 1 1 12.296 12.296 307.40 29.51
Plum concrete fill 1 1 53.360 53.36 1334.00 128.06
Soil fill over heel 2 1 14.92 29.845 746.13 71.63
Page 63 of 90 2 of 2
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
B C
Earth Pressure
for B.M & S.F for
a 3.5 m
Stem
Ha = 5.82 m
N.G.L 5.0 m
β
Backfill
2.25 m 1.25 m 1.2 m
1.5 m
1.95m
A 0.5 m
Heel Toe 0.3 m
4m
Active earth pressure for Passive
bearing pressure,base design Fig : 1- R.C.C Retainig wall earth
& stability checks
Page 64 of 90 1 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
For b = 20
Ha = 5.82 m
3
gD = 18 KN/m
Ka = 0.347
Force due to active earth pressure : Force due to active earth pressure :
Pa = 1/2 Ka g Ha2 Pa = 1/2 Ka g H2
= 105.64 KN/m = 68.90 KN/m
Point of Application: The centre of pressure exerted by the back fill is located at
an elevation of 2.44 m (0.42H) above the base of the wall.
Page 65 of 90 2 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Kp = 7.48
pp = Kp g Zp
= 201.87 KN/m2
Point of Application: The centre of pressure exerted by the back fill is located at an
elevation of 0.5 m (0.33H)above the base of the wall.
Page 66 of 90 3 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
5m
SOLUTION :
K0 = 1-sinF
K0 = 0.43
H = 5 m
gD = 18 KN/m3
Static earth pressure :
P0 = K0 g H
= 38.38 KN/m2
P0 = 95.95 KN/m
Point of Application: The centre of pressure exerted by the back fill is located at
an elevation of 1.67 m (0.33H)above the base of the wall.
Page 67 of 90 4 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
For b = 20
heq = 1.2 m
gD = 18 KN/m3
Ka = 0.347
= 7.49 KN/m2
Formation Width
Retaining
Retaining
CL Carriaageway
wall
wall
Earthen Earthen
shoulder shoulder
5.0 m
Page 68 of 90 5 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Left Side retaining wall (figure-3) Right Side retaining wall (figure-3)
b = 20 b = 20
Za = 5.82 m Za = 5.82 m
gD = 18 KN/m3 gD = 18 KN/m3
Ka = 0.347 Ka = 0.347
Active Earth Pressure = KagZa = KagZa
2 Active Earth Pressure
= 36.30 KN/m
= 36.30 KN/m2
2 2
Total base pressure = 36.3 + 7.49 KN/m Total base pressure = 36.30 KN/m
2
43.79 KN/m
Page 69 of 90 6 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Ca = 0.344 Ca = 0.332
Whichever is greater
Ca = 0.344
2
(Paw)dyn = 1/2 wh Ca
where,
h = 5 m
(Paw)dyn = 77.46 KN/m
Obtained by puttting AH = AV = l = 0
Ca = 0.262
= 18.449 KN/m
Point of Application: The Static component of the total active earth pressure i.e
58.9 KN/m will act 1.67 m (h/3) from base of the wall and the point of application
of the dynamic increment i.e 18.78 KN/m shall be assumed to be at 2.5 m (h/2) of
the wall
Page 70 of 90 7 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
CP =
CP = 6.952 CP = 6.592
Whichever is less
CP = 6.592
where,
h = 1.5 m
(PPw)dyn = 133.50 KN/m
CP = 7.48
= 151.40 KN/m
= 17.905 KN/m
Point of Application: The Static component of the total passive earth pressure i.e
171.2 KN/m will act 0.5 m (h/3) from base of the wall and the point of application
of the dynamic decrement i.e 20.93 KN/m shall be assumed to be at 0.75 m (h/2)
of the wall
8 of 15
Page 71 of 90
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
The active earth pressure against the wall due to a uniform surcharge of intensity
q per unit area of the inclinde earthfill shall be :
q = 1.2 x 18
= 21.6 KN/m2 (Uniform Surcharge intensity , g = 18KN/m3)
a = 2.437
h = 5 m
b = 0
Ca = 0.34
(paq)dyn = 37.18 KN/m
Page 72 of 90 9 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
The passive earth pressure against the wall due to a uniform surcharge of intensity
q per unit area of the inclinde earthfill shall be :
q = 1.2 x 18
= 21.6 KN/m2 (Uniform Surcharge intensity , g = 18KN/m3)
a = 2.437
h = 1.5 m
b = 0
Cp = 6.59
Page 73 of 90 10 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Ca = 0.439 Ca = 0.452
Where
Ws = 20.0 KN/m3
Whichever is greater
Where,
h = 5 m
3
w = 10 KN/m
Obtained by puttting AH = AV = l = 0
Ca = 0.248
2
(Paw)static = 1/2 wh Ca
Page 74 of 90 11 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Where,
h = 5 m
3
w = 10 KN/m
= 25.512 KN/m
Point of Application: The Static component of the total active earth pressure i.e
32.7 KN/m will act 1.67 m (H/3) from base of the wall and the point of application
of the dynamic increment i.e 25.57 KN/m shall be assumed to be at 2.5 m (H/2) of
the wall
Page 75 of 90 12 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
CP =
CP = 4.246 CP = 4.388
Whichever is less
Where,
h = 1.5 m
w = 10 KN/m3
Obtained by puttting AH = AV = l = 0
CP = 7.48
Where,
h = 1.5 m
w = 10 KN/m3
Page 76 of 90 13 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
= -464.388 t/m
Point of Application: The Static component of the total passive earth pressure i.e
95.1 KN/m will act 0.5 m (H/3) from base of the wall and the point of application of
the dynamic decrement i.e 45.74 KN/m shall be assumed to be at 0.75 m (H/2) of
the wall
Page 77 of 90 14 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
SOLUTION :
Ka = 0.262
3
g = 18 KN/m
Za = 5m
C = 1.32
Pa = 22.253 KN/m2
Kp = 7.477
3
g = 18 KN/m
Za = 1.5 m
C = 1.32
Pa = 209.088 KN/m2
Page 78 of 90 15 of 15
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
A B
0.75 m 5m 0.75 m
MT T1 MT
h1
h2 T2
FT h FT
h3
T3
Step 2 : The strain at each depth where the temperature changes, and consequently the
stress, can be calculated as :
aTT1 EaTT1
aTT2 EaTT2
aTT3 EaTT3
Stain Distribution Restrained Stresses
Step 3 :
The axial restraint FT & Moment restraint MT are removed, stress of (FT / A ) & (MT/Z) is
released from the restrained stresses, the remaining restrained (locked in) stresses are :
Page 79 of 90 1 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
These final locked in stresses are often referred to as self-equilibrating stresses and need to be added
to the stresses resulting from permanent and traffic loading when combinations including temperature
effects are considered.
Preliminary Data:
CASE : I
To calculate the effects when the top surface of the deck is hotter than the core of the deck
(known as ‘positive temperature difference’ or ‘heating temperature difference’)
T1 = 17.8° h1 = 0.09 m
T2 = 4.0° h2 = 0.1 m
T3 = 2.1° h3 = 0.09 m
FT = EaTB {[h1(T1+T2)/2]+[h2T2/2]+[h3T3/2]}
FT = 505.10 KN
Page 80 of 90 2 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
F1
FORCE COMPONENT (KN) DISTANCE FROM N.A (m) F2
F1 = 245.92 Z1 = 0.12
F2 = 142.56 Z2 = 0.105 Z2 Z1 X
F3
F3 = 79.20 Z3 = 0.027 Z3 N.A
F4 = 37.42 Z4 = -0.12
Z4
F4
MT = F1z1+F2z2+F3z3+F4z4
MT = 42.10 KNm
CASE : II
‘Reverse Temperature Difference' (when heat is lost from the top surface of the deck)
T1 = 10.6° h1 = 0.06 m
T2 = 0.7° h2 = 0.075 m
T3 = 0.8° h3 = 0.075 m
T4 = 6.6° h4 = 0.06 m
FT = EaTB {[h1(T1+T2)/2]+[h2T2/2]+[h3T3/2]+[h4(T3+T4)/2}
FT = 244.43 KN
Page 81 of 90 3 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
Page 82 of 90 4 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
PRELIMINARY DATA:
CLASS OF WATERWAY : VII
VESSEL DISPLACEMENT TONNAGE : 4000 T (LADEN), 1000 T (UNLADEN)
DESIGN SPEED : 4 KNOTS (LADEN), 6 KNOTS (UNLADEN) - AS PER CL. 220.4)
UNDERKEEL CLEARANCE OF MORE THAN 0.5 X DRAFT IS AVAILABLE FOR BARGES
SOLUTION :
CASE I : DWT = 4000 T (Laden weight)
Barge Collision Energy (K.E) = 500 x CH x W x V2
(say that underkeel clearance is
Hydrodynamic coefficient (CH) = 1.05
more than 0.5 x Draft)
Barge Speed (KNOTS) = 4.00 Knots
Barge Speed (m/sec) = 2.10 m/sec
DWT = 4000 MT
Vessel Design Barge Barge Damage Depth Barge Impact Force Barge Impact Force
Displacement Barge Speed Collision ( aB ) PB for PB for
Tonnage Energy ( aB < 100 mm) ( aB ≥ 100mm )
(KE)
aB PB PB
( DWT ) ( m/sec ) ( N.m ) mm KN KN
4000 2.10 9261000 1502.15 8403.44
Vessel Design Barge Barge Damage Depth Barge Impact Force Barge Impact Force
Displacement Barge Speed Collision ( aB ) PB for PB for
Tonnage Energy ( aB < 100 mm) ( aB ≥ 100 mm )
(KE)
aB PB PB
( DWT ) ( m/sec ) ( N.m ) mm KN KN
1000 3.10 5045250 889.11 7422.58
Page 83 of 90 1 of 1
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
CL of Bridge
WHEELED VEHICLE
SNOW LOAD
0.25 m
A B
0.75 m 30 m 0.75 m
SOLUTION :
= 9.375 KN/m
Page 84 of 90 1 of 3
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
0.5 m
A B
0.75 m 30 m 0.75 m
SOLUTION :
= 18.75 KN/m
Page 85 of 90 2 of 3
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
c)Considering Snow accumulation exceeding 0.5 m over the deck and no Live
Load
CL of Bridge
SNOW LOAD
0.7 m
A B
0.75 m 30 m 0.75 m
SOLUTION :
= 26.25 KN/m
No Live Load shall be considered when snow accomulation is more than 0.5 m
Page 86 of 90 3 of 3
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
222 - VEHICLE COLLISION LOADS ON SUPPORTS OF
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT VEHICLE COLLISION LOAD ON WALL TYPE BRIDGE PIER.
222-1 (Clause 222.3)
a) Nominal Vehicle Collison Laod on Pier, when Speed of the Vehicle is more
than 60 km/hr.
SOLUTION :
TRAFFIC TRAFFIC
BELOW DECK ABOVE DECK
CARRIAGEWAY BELOW
PLAN
ZONE OF
APPLICATION
Page 87 of 90 1 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
222 - VEHICLE COLLISION LOADS ON SUPPORTS OF
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT VEHICLE COLLISION LOAD ON WALL TYPE BRIDGE PIER.
222-1 (Clause 222.3)
Note : Loads normal to the carriageway below and loads parallel to the carriageway below shall be
considered to act separately and shall not be combined.
250 KN 3m 500 KN 3m
1m 1m
CARRIAGEWAY
LEVEL BELOW
Note :
Both, Main & Residual loads shall be considered acting simultaneously,if fencing system is not
provided.
Residual Load Components only shall be considered if fencing system provided as per clause
222.3.2(i.e having minimum height of 1.5 m above the carriageway level.)
Page 88 of 90 2 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
222 - VEHICLE COLLISION LOADS ON SUPPORTS OF
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT VEHICLE COLLISION LOAD ON WALL TYPE BRIDGE PIER.
222-1 (Clause 222.3)
b)Nominal Vehicle Collison Laod on Pier , when Speed of the Vehicle is less
than 60 km/hr(i.e 40km/hr)
SOLUTION :
SUPER STRUCTURE ABOVE
TRAFFIC
BELOW
CARRIAGEWAY BELOW
PLAN
All load are to be Reduced in proportion to the square of the velocity but not
less than 50 percent.
Page 89 of 90 3 of 4
PROPOSED MODIFICATION & COMMENTARY - IRC: 6-2017
ILLUSTRATIVE WORKED EXAMPLES
CLAUSE NO. & TITLE:
222 - VEHICLE COLLISION LOADS ON SUPPORTS OF
DESIGN CALCULATIONS BRIDGES
WORKED EXAMPLE NO. TITLE OF WORKED EXAMPLE:
FIND OUT VEHICLE COLLISION LOAD ON WALL TYPE BRIDGE PIER.
222-1 (Clause 222.3)
Note : Loads normal to the carriageway below and loads parallel to the carriageway below shall be
considered to act separately and shall not be combined.
125 KN 3m 250 KN 3m
1m 1m
CARRIAGEWAY
LEVEL BELOW
Note :
Both, Main & Residual loads shall be considered acting simultaneously,if fencing system is not
provided.
Residual Load Components only shall be considered if fencing system provided as per clause
222.3.2(i.e having minimum height of 1.5 m above the carriageway level.)
Page 90 of 90 4 of 4