SIARAN KHAS
Special Release 3
(UNTUK KERJA-KERJA MEKANIKAL DAN
ELEKTRIKAL)
(For Mechanical and Electrical Works)
JANUARI
JANUARY 2018
Tiada bahagian daripada terbitan ini boleh diterbitkan semula, disimpan untuk pengeluaran atau ditukar dalam
apa-apa bentuk atau alat apa jua pun kecuali setelah mendapat kebenaran daripada Jabatan Perangkaan
Malaysia.
Pengguna yang mengeluarkan sebarang maklumat dari terbitan ini sama ada yang asal atau diolah semula
hendaklah meletakkan kenyataan : “Sumber: Jabatan Perangkaan Malaysia”.
No part of this publication may reproduced or distributed in any form or by any means or stored in database
without the prior written permission from Department of Statistics, Malaysia.
Users reproducing content of this publication with or without adaption should quote the following: “Source:
Department of Statistics, Malaysia.”
ISSN : 1985-739X
Kandungan
Contents
Muka Surat
Page
Nota teknikal 17
Technical notes
Jadual tarikh pengeluaran Siaran Khas 3 (Untuk Kerja-kerja Mekanikal dan Elektrikal), 18
Malaysia, Januari-Disember 2018
Schedule of release dates for Special Release 3 (For Mechanical and Electrical Works),
Malaysia, January-December 2018
i
JADUAL
TABLE
Jadual 1: Indeks harga seunit bagi copper cables
Table 1: Unit price index for copper cables
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
1.3) Cables laid underground (per meter run) 2017 Dis 108.5 107.4 105.9
(i) 120 sq. mm and above 2018 Jan 108.9 107.6 106.1
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
1
Jadual 1: Indeks harga seunit bagi copper cables (samb.)
Table 1: Unit price index for copper cables (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
1.3) Cables laid underground (per meter run) 2017 Dis 106.4 102.0 109.4
ii) Below 120 sq. mm 2018 Jan 106.8 102.1 109.6
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
1.4) Cables on tray/ladder (per meter run) 2017 Dis 108.5 107.4 105.9
i) 120 sq. mm and above 2018 Jan 108.9 107.6 106.1
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
1.4) Cables on tray/ladder (per meter run) 2017 Dis 106.4 102.0 109.4
ii) Below 120 sq. mm 2018 Jan 106.8 102.1 109.6
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
2
Jadual 1: Indeks harga seunit bagi copper cables (samb.)
Table 1: Unit price index for copper cables (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
r = Kemaskini/Revised
3
Jadual 2: Indeks harga seunit bagi switchgears
Table 2: Unit price index for switchgears
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(2) Switchgears
4
Jadual 2: Indeks harga seunit bagi switchgears (samb.)
Table 2: Unit price index for switchgears (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(2) Switchgears
2.4) TPN & SPN Distribution Boards 2017 Dis 109.4 103.8 106.0
(Incomer breaker 100A 2018 Jan 109.4 104.7 106.0
and below) Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
5
Jadual 3: Indeks harga seunit bagi transformers
Table 3: Unit price index for transfomers
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(3) Transformers
3.1) Low loss cast resin transformer 2017 Dis 86.3 76.4 86.3
2018 Jan 82.8 76.4 82.8
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
3.2) Low loss hermetically sealed 2017 Dis 105.4 93.4 105.4
(oil filled) transformer 2018 Jan 105.4 93.4 105.4
Feb
Mac
Apr
Mei
Jun
Jul
Ogos
Sept
Okt
Nov
Dis
6
Jadual 4: Indeks harga seunit bagi generators
Table 4: Unit price index for generators
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
(4) Generators
7
Jadual 5: Indeks harga seunit bagi lightning protection system and earthing system
Table 5: Unit price index for lightning protection system and earthing system
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung
Malaysia
Sabah Sarawak
Peninsular
Malaysia
8
Jadual 6: Indeks harga seunit bagi air conditioning system
Table 6: Unit price index for air conditioning system
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
9
Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)
Table 6: Unit price index for air conditioning system (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
10
Jadual 6: Indeks harga seunit bagi air conditioning system (samb.)
Table 6: Unit price index for air conditioning system (cont'd)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
11
Jadual 7: Indeks harga seunit bagi motor (pumpset)
Table 7: Unit price index for motor (pumpset)
(Julai 2012=100)
(July 2012=100)
Kawasan
Region
Tempoh
Item Period Semenanjung Sabah
Malaysia &
Peninsular Sarawak
Malaysia
7. Motor (Pumpset)
12
LAMPIRAN
APPENDIX
Lampiran A
Appendix A
1.2) Cables in galvanized trunking (per meter run) 1.4353 1.6624 1.5669
(2) Switchgears
2.1) HT Switchgears 1.0183 1.0814 1.1800
2.2) LV Switchboards (Incomer breaker 600A and above) 1.0020 1.2538 1.0160
2.4) TPN & SPN Distribution Boards (Incomer breaker 1.0060 1.0549 1.0930
100A and below)
(3) Transformers
3.2) Low loss hermetically sealed (oil filled) transformer 1.1640 1.2890 1.3390
(4) Generators
13
Lampiran A
Appendix A
14
Lampiran B
Appendix B
Contoh mengira indeks lama Busduct bagi Example for calculating the old index of
bulan Januari 2013 untuk kawasan Busduct for the month of January 2013 for
Semenanjung Malaysia adalah seperti berikut: Peninsular Malaysia is as follows:
j
I lama Januari 2013 = FP (seperti di Old j I for January 2013 = AF (as in
Lampiran A) x j I baru Januari 2013 Appendix A) x new j I for January 2013
iaitu, indeks lama Januari 2013 i.e. old index for January 2013
= 1.6680 x 100.0 = 1.6680 x 100.0
= 166.8000 = 166.8000
= 166.8 = 166.8
di mana, where,
FP = Faktor Pelarasan AF = Adjustment Factor
j j
I = Indeks bagi kategori bangunan j I = Index for building category j
j = 1, ……… 8 j = 1,…..… 8
15
NOTA TEKNIKAL
TECHNICAL NOTES
Technical notes on Component Cost Index
Nota teknikal Indeks Kos Komponen
of the Mechanical and Electrical
Kerja-kerja Mekanikal dan Elektrikal (M&E)
Works (M&E)
(Julai 2012=100)
(July 2012=100)
Indeks Kos Komponen Kerja-kerja Mekanikal The Component Cost Index of the Mechanical
dan Elektrikal (M&E) digunakan dalam and Electrical Works (M&E) is used in Special
Pelaksanaan Syarat Perubahan Harga dalam Provisions to the Conditions of Contract
kontrak-kontrak bangunan kerajaan sahaja. (Variation of Price) in government building
Indeks harga seunit diterbitkan mengikut tiga contracts only. The unit price indices are
(3) kawasan iaitu Semenanjung Malaysia, reported according to three (3) regions, that is
Sabah dan Sarawak. Peninsular Malaysia, Sabah and Sarawak.
Spesifikasi untuk komponen mekanikal dan The specification of the selected mechanical
elektrikal terpilih disediakan oleh Jabatan Kerja and electrical components are determined by
Raya (JKR) dan Lembaga Pembangunan Public Works Department (JKR) and
Industri Pembinaan Malaysia (CIDB). Harga Construction Industry Development Board
bagi komponen elektrikal diperoleh dari Malaysia (CIDB). The prices for electrical
pungutan harga yang dibuat oleh Jabatan components are obtained from the price
Perangkaan Malaysia. Bagi komponen collection conducted by Department of
mekanikal, harga diperoleh dari pembekal. Statistics, Malaysia. For mechanical
components, the prices are obtained from the
suppliers.
Mulai penerbitan Januari 2013, Indeks Kos Starting from January 2013 publication, the
Komponen Kerja-kerja Mekanikal dan Elektrikal Component Cost Index of the Mechanical and
adalah berasaskan kepada tahun asas yang Electrical Works is based on the revised base
ditukar daripada (Disember 2007=100) kepada year which has been changed from
(Julai 2012=100). (December 2007=100) to (July 2012=100).
Bagi kontrak-kontrak yang telah ditandatangani For contracts signed before January 2013,
sebelum Januari 2013, sila lihat ‘Jadual faktor please refer to the ‘Adjustment factor table’
pelarasan’ (Lampiran A) dan ‘Contoh mengira (Appendix A) and the ‘Example for calculating
Indeks Lama Kos Bahan Binaan Bangunan’ the Old Building Materials Cost Index’
(Lampiran B) untuk panduan dalam (Appendix B) for the implementation of the
Pelaksanaan Syarat Perubahan Harga. Bagi Variation of Price. For contracts commencing
kontrak-kontrak mulai Januari 2013 dan January 2013 and thereafter, the new index is
seterusnya, indeks baru hendaklah digunakan to be used without any further adjustment.
terus tanpa sebarang pelarasan.
17
Jadual Tarikh Pengeluaran Siaran Khas 3
(Untuk Kerja-Kerja Mekanikal dan Elektrikal), Malaysia,
Januari - Disember 2018
Schedule of Release Dates for Special Release 3
(For Mechanical and Electrical Works), Malaysia
January - December 2018
18