ANNEXURE –C

Specifications & BOQ for Supply, Installation, Testing & Commissioning of 71 MT


Pre-Engineered Slanted Roof Shed Steel Building at Kasna Store, Site-4, Greater Noida.

This note envisages the specifications for Construction of 60 mtr. X 23 mtr. Pre-Engineered
Slanted Roof Shed Steel Building with clear height of 8 mtr. as covered storage facility for
Noida Power Company Limited at Kasna, Site-4. General arrangement drawing is attached
herewith as Annexure-I.

Design Summary:
Total Building Structure with gantry weight approx. = 70.85 MT
Total Building Sheeting approx. = 2348 Sq.Mt.
Building design Code MBMA/AISC/IWS

Building Design Applicable Codes:

 Loads are applied in accordance with :


The 2006 Edition of Low Rise Building System Manual
Metal Building Manufactures Association (MBMA)

 Hot rolled and Built up sections are designed in accordance with:


Manual of Steel Construction, 9th Edition
American Institute of Steel Construction (AISC)

 Cold-formed members are designed in accordance with:


1996 Edition of Cold formed Steel Design Manual
American Iron and Steel Institute (AISI)

 Welding is applied in accordance with:


American Welding Society (AWS 01.01.98)
Structural Welding Code – Steel
Indian Welding Society (IWS 14.03.02)

Structural Steel Specification:

a) Primary Steel
All primary steel members shall be solid web build up section in manufactured out of
345 MPa steel plates. All portals shall be supplied in fully finished and ready to use for

PEB Specs-2018-19/NPCL/Kasna Store Shed Page 1 of 6


to use for field assembly condition.

b) Cold formed section


These shall be Z/C shaped cold formed section out of 245 Mpa steel stripes conforming to
ASTM 570.

c) Support Bracing
Rod bracing, flange bracing, misc. steel components such as clips etc. shall be out of 34/350
MPa steel conforming to IS : 2062.

d) Structural Hardware
All primary steel connections shall be established using high tensile Gr. 8.8 fasteners. steel
Secondary connections bolt shall be done by Galvanised Gr. 4.6 fasteners.

Design Loads:
Roof Live Load 0.57kN/m2
Dead Load 0.15 kN/m2
Wind Speed 47 m/s
Seismic zone IV
Deflection in Rafter (Vertical) Span/180
Deflection to Column (Horizontal) Height/100
Deflection to Purlin (Vertical) Span/120

Building Parameters:
1 Type of Frame Single Slope Clear span
2 Building Length 60 mtr.
3 Building Width 23 mtr.
4 Total Area 14,734 Sqft.
5 Eave Height 8 mtr. Clear height
6 Roof Slope 01:20
7 Bay Spacing (Side wall) 10 @ 5.95mtr.
8 Bay spacing (End wall) 4 @ 5.75mtr.
9 Type of Bracing Rod Bracing as per design

PEB Specs-2018-19/NPCL/Kasna Store Shed Page 2 of 6


Rear end wall and Front end wall
10 Type of Frame
rigid frame
11 Roof Panel 0.47mm Bare Galvalume Roof Sheet
12 Cladding panel 0.50mm Color coated profile sheet
13 Canopy 2 nos. of projections 2.0 mtr
14 Building Condition Enclosed
15 Day Light panel 3% of the roof area
16 Crane Loads 5 Ton, Span-23 mtr, Bkt Height-6 mtr
17 Solar Plant Load 25Kg/sqmt
18 Canopies 2 Nos 6x3mtr
19 Windows To be provided
20 Shutter Space 2 Nos 6x6mtr

Open Wall Conditions:


1 Left Side Wall 6 mtr. Brick wall and above sheeting
2 Right Side Wall 3 mtr. Brick wall and above sheeting
3 Front End Wall 3 mtr. Brick wall and above sheeting
4 Back End Wall 3 mtr. Brick wall and above sheeting

Roof & Wall Sheeting:


Roof Panel with Thermal 0.47 mm AZ-150 High-Rib bare Galvalume sheet 550
1
bubble Insulation Mpa (JSW)
0.50 mm AZ-150 High-Rib Coated Galvalume sheet
2 Wall Cladding
550 Mpa (JSW)
3 Eave Gutter /Flashing/pipe Matching to roof and cladding

Roof Accessories:
S. no Roof Accessories Description Quantity
1 Skylight- Polycarbonate 1M X 3.1 M (2mm) 3% in roof
2 Turbo fan 600 mm 20 Nos

PEB Specs-2018-19/NPCL/Kasna Store Shed Page 3 of 6


Steel Work Finish:
S. no Description Finish
One Coat Red oxide and one coat enamel
1 Frames, Built-Up / HR Sections
paint smoke grey
2 Purlins & Girts Purlins and Grits (Metal Steel)
3 Anchor bolts Black unpainted

List of Inclusions:

1) Main frame rafters & columns


2) Purlin & Girts
3) Steel Connectors
4) Structural hardware including Anchor bolts & templates.
5) Fixing fasteners. Sealant.
6) Skylight -2mm thick Poly Profile sheet considered.
7) Crane Bracket, Gantry.

BOQ for Construction of Pre-Fabricated Engineered Steel Building Structure at


Kasna Store, Site-4, Greater Noida

Unit Rate Total Amount


S.no. Job Description UoM Qty.
(Rs.) (Rs.)
Supply & Installation of
PEB Structure complete
with MS Columns, rafters,
purlins, cladding sheets,
gutters, flashing etc. with
thermal bubble insulation
1. complete with its
accessories including
Concrete embed plates of
MT 71.00
weld plate of any kind,
setting of Anchor Bolt -
(Physical setting or fixing)
with dimensional accuracy
of anchor bolt set out
before casting, supply of
all shuttering materials,
anchor fasteners, labour
and tools & plants etc.

PEB Specs-2018-19/NPCL/Kasna Store Shed Page 4 of 6


Supply & Installation
Galvalume Sheet complete
with its accessories
including supply of all
Sqmt. 2,348.00
2. shuttering materials,
labour and tools & plants
etc. required for proper
completion of work.
Providing and fixing of
mild steel motorized
rolling shutter of
dimensions 6.0 mtr height
x 5.7 mtr width proper
finish with approved
colour enamel paint etc,
3. complete as per Sqmt. 69.00
architectural drawings or
direction of Engineer-in-
charge including supply of
all materials, labour and
T&P etc. required for
proper completion of the
work.
Providing & fixing in
position of 100 Watt LED
Industrial Grade light
fixtures panels on ceiling
of approved make Osram
or Bajaj or Philips make
complete with its inter
loop wiring and switches.
4 The wiring shall consist of Nos. 12.00
PVC insulated copper
conductor stranded
flexible FRLS wire of 100
volts grade of insulation, in
metallic conduits for all
exposed wiring and PVC/
metallic conduits &
required Cable tray for all

PEB Specs-2018-19/NPCL/Kasna Store Shed Page 5 of 6


concealed wiring.
Minimum size of copper
conductor shall be 1.5 sq.
mm and 2.5 Sq.mm for
lighting and 4 sq.mm for
power. Colour code of
RED/ Yellow/ Blue for the
all single phases, Black for
neutral and Green for
Earthling.
Supply & Installation of
Roof ventilators complete
with its accessories
including supply of all
5 Nos. 20.00
shuttering materials,
labour and tools & plants
etc. required for proper
completion of work.

CGST @ 9%
SGST @ 9%
Total Amount (Including Taxes)

Important Note:

 G.A. Drawing submission within two weeks from the date of award of work order.

 G.A. Drawing shall be approved by our team and Structural Consultant within 15
days of submission.

 PEB Structural works shall be Guaranteed for a minimum period of at least 5 Years
from date of Handover.

 Contractor shall coordinate in obtaining necessary certifications/clearances from


the local governing bodies.

PEB Specs-2018-19/NPCL/Kasna Store Shed Page 6 of 6