Professional Documents
Culture Documents
SUBMITTED BY
Page 1 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Page 2 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Contents
S. NO. Description Page
1.0 Introduction 4
Page 3 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
1. INTRODUCTION
This report covers design of GAS CYLINDER BASKET, a closed top container. The size of
the basket is 1330 (L) x 600 (W) x 1450 (H) mm and has a capacity to hold 3 nos. of
Oxygen/Acetylene gas cylinder. The purpose of Analysis is to check the Integrity of Structural
members.
Methodology
The Structural analysis is done in STADD PRO software. The structural members are first
modelled and then the applicable loads and moments are applied on the members for analysis.
The GAS CYLINDER BASKET is also designed for lifting condition, while lifted by the forklift and
lifting lug. Pay Eyes, Sling & Shackle calculation is done manually as per BS EN 12079-1: 2006,
DNV 2.7-1.
Assumptions:
The following are the assumptions which are considered for the Analysis:
1. It is assumed that the material behaviour is linear elastic and changes in the shape &
orientation of the body are small.
2. The material of construction is assumed to be isotropic and homogenous.
3. Boundary conditions do not change from the point of load application to the final
deformed shape.
4. It is assumed that all loads are gradually applied to their full magnitude.
Material of construction
The following material of construction is used in analysis.
Material of Construction
Poisson
E Yield Stress Density
Material ratio
MPa MPa (kg/m3)
µ
Frame/ Pad Steel
1.95 x 105 300x 10-3 275 7850
eye (S275JR)
Sling Confirming to EN 13414-1
Shackle Confirming to EN 13889
Page 4 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Structural Section
Square/Rectangular Tube 50 X 50 X 5 THK, 200 X 100 X 6 THK.
Loads considered
1. Self-weight of the GAS CYLINDER BASKET structure (S) = 750 kg (Max. load) including
structure, side mesh cover, Top/Bottom plate, etc.
2. Payload (P) = 100 kg (Max. Design load per cylinder)*3 = 300 Kg
R= (Payload (P) + Tare weight (S))*load factor is considered for design .This load is
uniformly distributed on the Floor area and primary structure. Load factor = 1.6 and 2
respectively for Forklift and Lifting condition.
3. Impact loads:
Horizontal impact = 0.25* R (for corner posts)
= 0.15* R (for other members, including top rail)
Vertical impact = 0.25* R
4. For Lifting with Pad eye, the load considered is 3*R.
Allowable stress = 0.85 * Yield stress of the material.
Max. Allowable deflection = L/250.
In lifting analysis:
1. Sling leg angle to vertical = 45 degree
Page 5 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
2. Boundary conditions
In lifting case: the location of pad eye is considered at a suitable distance, so that in case of tilting or
shifting of cog of the container, the container remains intact while lifting. Also, the shackles are attached
at the top of the basket, thereby keeping the c.g. of the basket below the lifting points.
The Pad eye and the Lifting sets are designed as per DNV 2.7-1 and EN 13889, are shown in the
Appendix below.
Page 6 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
2. Appendix 1
Page 7 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Staad Report:
Nodes
X Y Z
Node
(mm) (mm) (mm)
1 0.000 0.000 0.000
2 1.33E 3 0.000 0.000
3 1.33E 3 0.000 600.000
4 0.000 0.000 600.000
5 0.000 -450.000 0.000
6 1.33E 3 -450.000 0.000
7 1.33E 3 -450.000 600.000
8 0.000 -450.000 600.000
9 0.000 -900.000 0.000
10 1.33E 3 -900.000 0.000
11 1.33E 3 -900.000 600.000
12 0.000 -900.000 600.000
13 0.000 -1.45E 3 0.000
14 1.33E 3 -1.45E 3 0.000
15 1.33E 3 -1.45E 3 600.000
16 0.000 -1.45E 3 600.000
29 250.000 -1.45E 3 600.000
30 1.08E 3 -1.45E 3 600.000
31 250.000 -1.45E 3 0.000
32 1.08E 3 -1.45E 3 0.000
Beams
Length
Beam Node A Node B Property
(mm) (degrees)
2 2 3 600.000 1 0
4 4 1 600.000 1 0
5 1 5 450.000 1 0
6 2 6 450.000 1 0
7 3 7 450.000 1 0
8 4 8 450.000 1 0
10 6 7 600.000 1 0
12 8 5 600.000 1 0
13 9 12 600.000 1 0
15 10 11 600.000 1 0
17 9 5 450.000 1 0
18 8 12 450.000 1 0
19 10 6 450.000 1 0
20 11 7 450.000 1 0
21 13 31 250.000 2 0
22 14 15 600.000 2 0
23 15 30 250.000 2 0
24 13 16 600.000 2 0
25 13 9 550.000 1 0
26 12 16 550.000 1 0
27 14 10 550.000 1 0
28 11 15 550.000 1 0
48 29 16 250.000 2 0
51 32 14 250.000 2 0
52 31 29 600.000 3 90
Page 8 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
53 32 30 600.000 3 90
54 31 32 830.000 2 0
55 29 30 830.000 2 0
56 1 2 1.33E 3 1 0
57 5 6 1.33E 3 1 0
58 9 10 1.33E 3 1 0
59 4 3 1.33E 3 1 0
Section Properties
Area Iyy Izz J
Prop Section Material
(cm2) (cm4) (cm4) (cm4)
1 TUB50505 8.880 29.600 29.600 45.563 STEEL
2 TUB2001006 36.000 618.000 1.85E 3 1.44E 3 STEEL
3 UPE200 29.000 187.300 1.91E 3 8.459 STEEL
Supports
X Y Z rX rY rZ
Node
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
29 Fixed Fixed Fixed Fixed Fixed Fixed
30 Fixed Fixed Fixed Fixed Fixed Fixed
31 Fixed Fixed Fixed Fixed Fixed Fixed
32 Fixed Fixed Fixed Fixed Fixed Fixed
Number Name
1 TARE+PAYLOAD
2 IMPACT LOAD
Page 9 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Selfweight : 1 TARE+PAYLOAD
Direction Factor
Y -3.000
3D Rendered View
Page 10 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Node number
Beam Numbers
Page 11 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Impact load
Page 12 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Utilization ratio
d X Y Z Resultant
Beam L/C
(mm) (mm) (mm) (mm) (mm)
Max X 20 3:COMBINATION LOAD CASE 3 270.000 0.449 -0.017 -0.038 0.451
Min X 18 3:COMBINATION LOAD CASE 3 180.000 -0.449 -0.017 -0.038 0.451
Max Y 58 2:IMPACT LOAD 665.000 -0.000 0.004 -0.131 0.131
Min Y 59 3:COMBINATION LOAD CASE 3 665.000 -0.000 -0.593 0.354 0.691
Max Z 59 3:COMBINATION LOAD CASE 3 665.000 -0.000 -0.593 0.354 0.691
Min Z 58 3:COMBINATION LOAD CASE 3 665.000 -0.000 -0.066 -0.185 0.196
Max Rst 59 3:COMBINATION LOAD CASE 3 665.000 -0.000 -0.593 0.354 0.691
Reactions
Horizontal Vertical Horizontal Moment
FX FY FZ MX MY MZ
Node L/C
(N) (N) (N) (kNm) (kNm) (kNm)
29 1:TARE+PAYLOAD 53.804 4.22E 3 -2.150 0.139 0.001 -0.272
2:IMPACT LOAD 846.871 -7.194 -312.963 -0.005 0.072 -0.152
3:COMBINATION 1.44E 3 6.74E 3 -504.181 0.215 0.117 -0.679
30 LOAD CASE 3
1:TARE+PAYLOAD -53.804 4.22E 3 -2.150 0.139 -0.001 0.272
2:IMPACT LOAD -846.871 -7.194 -312.963 -0.005 -0.072 0.152
3:COMBINATION -1.44E 3 6.74E 3 -504.181 0.215 -0.117 0.679
31 LOAD CASE 3
1:TARE+PAYLOAD 6.934 4.47E 3 2.150 -0.133 0.002 -0.312
2:IMPACT LOAD 327.308 7.194 312.963 0.001 -0.009 -0.036
3:COMBINATION 534.788 7.17E 3 504.181 -0.212 -0.012 -0.558
32 LOAD CASE 3
1:TARE+PAYLOAD -6.934 4.47E 3 2.150 -0.133 -0.002 0.312
2:IMPACT LOAD -327.308 7.194 312.963 0.001 0.009 0.036
3:COMBINATION -534.788 7.17E 3 504.181 -0.212 0.012 0.558
LOAD CASE 3
Page 13 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Utilization Ratio
Analysis Design Actual Allowable Ratio Ax Iz Iy Ix
Beam Clause L/C
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
2 TUB50505 TUB50505 0.106 0.850 0.125 AISC- H2-1 3 8.880 29.600 29.600 47.600
4 TUB50505 TUB50505 0.106 0.850 0.125 AISC- H2-1 3 8.880 29.600 29.600 47.600
5 TUB50505 TUB50505 0.100 0.850 0.117 AISC- H1-3 3 8.880 29.600 29.600 47.600
6 TUB50505 TUB50505 0.100 0.850 0.117 AISC- H1-3 3 8.880 29.600 29.600 47.600
7 TUB50505 TUB50505 0.121 0.850 0.142 AISC- H1-3 3 8.880 29.600 29.600 47.600
8 TUB50505 TUB50505 0.121 0.850 0.142 AISC- H1-3 3 8.880 29.600 29.600 47.600
10 TUB50505 TUB50505 0.134 0.850 0.157 AISC- H2-1 3 8.880 29.600 29.600 47.600
12 TUB50505 TUB50505 0.134 0.850 0.157 AISC- H2-1 3 8.880 29.600 29.600 47.600
13 TUB50505 TUB50505 0.133 0.850 0.157 AISC- H2-1 3 8.880 29.600 29.600 47.600
15 TUB50505 TUB50505 0.133 0.850 0.157 AISC- H2-1 3 8.880 29.600 29.600 47.600
17 TUB50505 TUB50505 0.024 0.850 0.028 AISC- H1-3 3 8.880 29.600 29.600 47.600
18 TUB50505 TUB50505 0.096 0.850 0.113 AISC- H1-3 3 8.880 29.600 29.600 47.600
19 TUB50505 TUB50505 0.024 0.850 0.028 AISC- H1-3 3 8.880 29.600 29.600 47.600
20 TUB50505 TUB50505 0.096 0.850 0.113 AISC- H1-3 3 8.880 29.600 29.600 47.600
21 TUB2001006 TUB2001006 0.029 0.850 0.034 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
22 TUB2001006 TUB2001006 0.005 0.850 0.006 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
23 TUB2001006 TUB2001006 0.033 0.850 0.039 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
24 TUB2001006 TUB2001006 0.005 0.850 0.006 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
25 TUB50505 TUB50505 0.056 0.850 0.065 AISC- H1-3 3 8.880 29.600 29.600 47.600
26 TUB50505 TUB50505 0.162 0.850 0.190 AISC- H1-3 3 8.880 29.600 29.600 47.600
27 TUB50505 TUB50505 0.056 0.850 0.065 AISC- H1-3 3 8.880 29.600 29.600 47.600
28 TUB50505 TUB50505 0.162 0.850 0.190 AISC- H1-3 3 8.880 29.600 29.600 47.600
48 TUB2001006 TUB2001006 0.033 0.850 0.039 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
51 TUB2001006 TUB2001006 0.029 0.850 0.034 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
52 UPE200 UPE200 0.034 0.850 0.040 AISC- H1-3 3 29.000 1.91E 3 187.300 8.890
53 UPE200 UPE200 0.034 0.850 0.040 AISC- H1-3 3 29.000 1.91E 3 187.300 8.890
54 TUB2001006 TUB2001006 0.012 0.850 0.014 AISC- H1-3 3 36.000 1.85E 3 618.000 1.47E 3
55 TUB2001006 TUB2001006 0.014 0.850 0.016 AISC- H1-3 3 36.000 1.85E 3 618.000 1.47E 3
56 TUB50505 TUB50505 0.114 0.850 0.135 AISC- H1-3 3 8.880 29.600 29.600 47.600
57 TUB50505 TUB50505 0.153 0.850 0.180 AISC- H2-1 3 8.880 29.600 29.600 47.600
58 TUB50505 TUB50505 0.156 0.850 0.183 AISC- H2-1 3 8.880 29.600 29.600 47.600
59 TUB50505 TUB50505 0.194 0.850 0.228 AISC- H2-1 3 8.880 29.600 29.600 47.600
Page 14 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
3. Appendix 2
Page 15 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Staad Report:
Nodes
X Y Z
Node
(mm) (mm) (mm)
1 0.000 0.000 0.000
2 1.33E 3 0.000 0.000
3 1.33E 3 0.000 600.000
4 0.000 0.000 600.000
5 0.000 -450.000 0.000
6 1.33E 3 -450.000 0.000
7 1.33E 3 -450.000 600.000
8 0.000 -450.000 600.000
9 0.000 -900.000 0.000
10 1.33E 3 -900.000 0.000
11 1.33E 3 -900.000 600.000
12 0.000 -900.000 600.000
13 0.000 -1.45E 3 0.000
14 1.33E 3 -1.45E 3 0.000
15 1.33E 3 -1.45E 3 600.000
16 0.000 -1.45E 3 600.000
29 250.000 -1.45E 3 600.000
30 1.08E 3 -1.45E 3 600.000
31 250.000 -1.45E 3 0.000
32 1.08E 3 -1.45E 3 0.000
33 665.000 500.000 300.000
Beams
Length
Beam Node A Node B Property
(mm) (degrees)
2 2 3 600.000 1 0
4 4 1 600.000 1 0
5 1 5 450.000 1 0
6 2 6 450.000 1 0
7 3 7 450.000 1 0
8 4 8 450.000 1 0
10 6 7 600.000 1 0
12 8 5 600.000 1 0
13 9 12 600.000 1 0
15 10 11 600.000 1 0
17 9 5 450.000 1 0
18 8 12 450.000 1 0
19 10 6 450.000 1 0
20 11 7 450.000 1 0
21 13 31 250.000 2 0
22 14 15 600.000 2 0
23 15 30 250.000 2 0
24 13 16 600.000 2 0
25 13 9 550.000 1 0
26 12 16 550.000 1 0
27 14 10 550.000 1 0
28 11 15 550.000 1 0
48 29 16 250.000 2 0
51 32 14 250.000 2 0
52 31 29 600.000 3 90
Page 16 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
53 32 30 600.000 3 90
54 31 32 830.000 2 0
55 29 30 830.000 2 0
56 1 2 1.33E 3 1 0
57 5 6 1.33E 3 1 0
58 9 10 1.33E 3 1 0
59 4 3 1.33E 3 1 0
60 1 33 761.150 4 0
61 2 33 761.150 4 0
62 4 33 761.150 4 0
63 3 33 761.150 4 0
Section Properties
Area Iyy Izz J
Prop Section Material
(cm2) (cm4) (cm4) (cm4)
1 TUB50505 8.880 29.600 29.600 45.563 STEEL
2 TUB2001006 36.000 618.000 1.85E 3 1.44E 3 STEEL
3 UPE200 29.000 187.300 1.91E 3 8.459 STEEL
4 Cir 0.02 2.545 0.515 0.515 1.031 STEEL
Supports
X Y Z rX rY rZ
Node
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
13 0.010 0.010 - - - -
14 0.010 0.010 - - - -
15 0.010 0.010 - - - -
16 0.010 0.010 - - - -
33 Fixed Fixed Fixed Fixed Fixed Fixed
Number Name
1 TARE+PAYLOAD
2 IMPACT LOAD
Page 17 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Selfweight : 1 TARE+PAYLOAD
Direction Factor
Y -2.500
3D Rendered View
Page 18 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Node number
Beam number
Page 19 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Utilization ratio
Utilization Ratio
Analysis Design Actual Allowable Ratio Ax Iz Iy Ix
Beam Clause L/C
Property Property Ratio Ratio (Act./Allow.) (cm2) (cm4) (cm4) (cm4)
2 TUB50505 TUB50505 0.296 0.850 0.348 AISC- H1-3 3 8.880 29.600 29.600 47.600
4 TUB50505 TUB50505 0.296 0.850 0.348 AISC- H1-3 3 8.880 29.600 29.600 47.600
5 TUB50505 TUB50505 0.338 0.850 0.398 AISC- H2-1 3 8.880 29.600 29.600 47.600
6 TUB50505 TUB50505 0.338 0.850 0.398 AISC- H2-1 3 8.880 29.600 29.600 47.600
7 TUB50505 TUB50505 0.185 0.850 0.218 AISC- H2-1 3 8.880 29.600 29.600 47.600
8 TUB50505 TUB50505 0.185 0.850 0.218 AISC- H2-1 3 8.880 29.600 29.600 47.600
10 TUB50505 TUB50505 0.206 0.850 0.242 AISC- H2-1 3 8.880 29.600 29.600 47.600
12 TUB50505 TUB50505 0.206 0.850 0.242 AISC- H2-1 3 8.880 29.600 29.600 47.600
13 TUB50505 TUB50505 0.174 0.850 0.205 AISC- H2-1 3 8.880 29.600 29.600 47.600
15 TUB50505 TUB50505 0.174 0.850 0.205 AISC- H2-1 3 8.880 29.600 29.600 47.600
17 TUB50505 TUB50505 0.091 0.850 0.107 AISC- H2-1 3 8.880 29.600 29.600 47.600
18 TUB50505 TUB50505 0.159 0.850 0.187 AISC- H2-1 3 8.880 29.600 29.600 47.600
19 TUB50505 TUB50505 0.091 0.850 0.107 AISC- H2-1 3 8.880 29.600 29.600 47.600
20 TUB50505 TUB50505 0.159 0.850 0.187 AISC- H2-1 3 8.880 29.600 29.600 47.600
21 TUB2001006 TUB2001006 0.033 0.850 0.039 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
22 TUB2001006 TUB2001006 0.011 0.850 0.013 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
23 TUB2001006 TUB2001006 0.027 0.850 0.031 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
24 TUB2001006 TUB2001006 0.011 0.850 0.013 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
25 TUB50505 TUB50505 0.130 0.850 0.153 AISC- H2-1 3 8.880 29.600 29.600 47.600
26 TUB50505 TUB50505 0.263 0.850 0.310 AISC- H2-1 3 8.880 29.600 29.600 47.600
27 TUB50505 TUB50505 0.130 0.850 0.153 AISC- H2-1 3 8.880 29.600 29.600 47.600
28 TUB50505 TUB50505 0.263 0.850 0.310 AISC- H2-1 3 8.880 29.600 29.600 47.600
48 TUB2001006 TUB2001006 0.027 0.850 0.031 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
51 TUB2001006 TUB2001006 0.033 0.850 0.039 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
52 UPE200 UPE200 0.039 0.850 0.045 AISC- H2-1 3 29.000 1.91E 3 187.300 8.890
Page 20 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
53 UPE200 UPE200 0.039 0.850 0.045 AISC- H2-1 3 29.000 1.91E 3 187.300 8.890
54 TUB2001006 TUB2001006 0.049 0.850 0.057 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
55 TUB2001006 TUB2001006 0.048 0.850 0.057 AISC- H2-1 3 36.000 1.85E 3 618.000 1.47E 3
56 TUB50505 TUB50505 0.334 0.850 0.393 AISC- H1-3 3 8.880 29.600 29.600 47.600
57 TUB50505 TUB50505 0.183 0.850 0.216 AISC- H2-1 3 8.880 29.600 29.600 47.600
58 TUB50505 TUB50505 0.189 0.850 0.222 AISC- H2-1 3 8.880 29.600 29.600 47.600
59 TUB50505 TUB50505 0.418 0.850 0.492 AISC- H1-3 3 8.880 29.600 29.600 47.600
60 Cir 0.02 2.545 0.515 0.515 1.031
61 Cir 0.02 2.545 0.515 0.515 1.031
62 Cir 0.02 2.545 0.515 0.515 1.031
63 Cir 0.02 2.545 0.515 0.515 1.031
Page 21 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Re = 275 N/sq.mm
Eye Dimensions:-
2) Contact Stress
Page 22 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Hence use 18mm Wire rope Sling confirming to EN 13414-1, steel cored rope,
grade 1770.
Clearance between shackle pin and pin hole diameter should not exceed 6% of
the nominal shackle pin diameter.
Page 23 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Page 24 of 25
PROJECT NAME: GAS CYLINDER BASKET
PROJECT NO.: 1622 Date: 28th March 2019
Page 25 of 25