Professional Documents
Culture Documents
Drilling Engineering Chapter 1 1573469223 PDF
Drilling Engineering Chapter 1 1573469223 PDF
hire landman
to acquire hire drilling
rights contractors to do the actual
1 drilling
maintain rigs
equipments
rigs
personnel
consumables
Process
Drilling
i
Budgeting ii
Planning iii Design
well specstf obj Construct well plan
Well Team x
completed
data acquisition Goals HFE
budget cost worksheet Geological Submitted
Prognosis
rig scheduling Well obj
Well plan
approved
finalized n approved
ggg
Execution Optimization
ost Drill Analysis Spud well Drilling program
completed
Complete
Drilling program
Test Pb A applied
Handover to Prod pre Spud
meeting
Steps in
drilling OIG
obtain seismic Log
obtain concession
calculate reserve
4 if high proceed with
We
obtain permitfrom Gov
preparedrilling completion program
iv Abandonment well
Lif no HE is found 0 wells need to be closed
I to avoid env impact
during explappraisal
V Re entry recompletion
a
Senior on
rig
Operating Icompanyman ensure drilling
company drilling roles operation is run
Supervisor as planned
background
intenetrents
ie ign.gl
5 10 years Drilling Exp
An
To
conduct preliminary studies
estimate well duration cost
Drilling Eng
during initial prospect evaluation
noAuthority for Expenditure
me FEs are approved
To design coordinate b monitor overall
well program
0
Drilling crew Subsea
a 0
Engineer
Engineering crew
0 Medics
Marine crew 0 Radio Operator
I
Macintewnancelottnegidnfefnance
In charge of all maintenance
operations on the rigs
Rig Electrician maintenance 1 repairs
electrical equipment
RigMechanic maimntennaan.EE earueipanirenIt
Motorman maintenance
well Used
to drill dev ganchovis
to fix
from 1 location position
immobile towedlselfpropelled
Gps
L
e se
Tf pontoons
to control
of
G 12ft 2400ft I buoyancye
245009
710,000 79000ft
grid
Classifications power jelectric
pneumatic
of used
rigs mechanical diesel
hydraulic
Pipe used conventional
cable
single CoitTubing
Height
double
Pipe rack
triple
quad
Rotary
system no rotation
rotary table
Position
of top drive
derrick
conventional
slant
Drilling Process i Power Gen System
Subsystem Hoisting System
111
Circulating System
iv Rotary system
v Well control system
vi Data acquisition by
monitoring system
Hoisting System
To lower raise
drill strings casing string
other s S equipments
out of hole
crown block
Draw
work
fit wire
line g
Fd
Wtf tf y g
anch0
travelling
TEN
WL
µ
hook storage reel
Tensile Load
Ff WIEN
Ff Ft Why
The tensile load will be
W total load
a function of the inefficiency supported by lines lbs
N no of lines
Drilling Terms
making connection
i Periodic process of adding newjoints of drillpipe to
the drillstring
making trip taking the drillstring out of hole to change bitlatter BHA
lowering them back into the hole
Steps raise Kelly above rotary table set slips
Y
Transmitted via
Rig Power System mech drivers ACDC
rectifier Major components
in cnn.im
i i mi
Avg Total 1000 3000 hp arotarytable
Prime power
from electric
Movers Internal combustion or power supply
diesel engines from existing power
line
Vertical Hole Drilling
Rotary
Power To
they L Torque 15k A lbs
t.ni.ec IneaiiIiITng
T
Input Power L Torque 80 left lbs
P QgH Power 100
hp
2545
Output Power
Pislnput Power hp Po
ZANT
Eff 11 1001
Qf Rate of fuel 53,000
consumption Clbs hr
pi
Pos Output Power hp
H heating value N Engine Rotary Speed rpm
Ffs Yg 381,900cg
s 44,590lbf
Ph E Pi O841 500 th Py
420 5h17
W
420.5Xp
153,000ft Im
Thus time req to pull 90ft Stand is
300,00rebff
t 90ft I 9 min 46.3flymin
t.tt mih
Max eq load
Fde 450,000 lbf
Nµt4 w 8g4 zoo ooo
drillbit
Drill Bit usually becomes dull after 5 25 hrs of operatio
48 Factors in i composition of formation drilling
selecting hardness of formation parameters
Kelly hexagonalAquare
Drill String I
Components 40ft154ft in length
attachedto a swivel fits into a
matching slot in the rotary table
me iii ring
sina.e.s.e.m.ie
He 2Di Dr rod
4
Diameter IL D Ls Nc
length pigtfanmeter
of stroke
Actual Vol Va Vi Eu or Qa c Ev
Hhp PI
1714
Well Control further
Function Prevent a flow of formation flui
System into wellbore
during kick
fbadonifponent
I by
shutting in well surface
Ram Preventers
L pipe rams
OD of Close off
ftp.fneing
Dp annular
space
between
d plcasin