project title:
section: date
calcs for: by
Temporary Jacking
Bearing Schedule Point
from Contractor
Design for Pier E4
project no: HK077 sheet no.
project title: Cross Bay Link
section: date
calcs for: by
Calculation of Anti-Bursting
Reinforcement of Jacking Point
project no: HK077 (91558) sheet no.
project title: Cross Bay Link 1
section: Precast V-piers and Crossbeam date 15/01/2019
calcs for: Temporary Jacking Point Reinforcement by rw
The temporary jacking points (No. 1 and 2) are checked for bearing stress and anti-busrting
reinforcement against vertical loads (SLS and ULS).
There are two sets of temporary jacking points to cater for different loading scenarios:
- Temporary jacking points No.1 - For supporting the box girder deck during erecton (for adjustment)
- Temporary jacking points No.2 - For supporting the box girder deck during erection (e.g.
temporary supports during the deck erection)
- Both temporary jacking points No.1 and 2 will act simultaneously to support for future bearing replacement
The temporary jacking point sizes are provided to us by the Engineer and the Contractor.
- Temporary jacking points No.1 - 800mm x 800mm plan area
- Temporary jacking points No.2 - 800mm x 800mm plan area
Legend
Permanent Bearings
Jacking Point No.1
Jacking Point No.2
800 800
Permanent
Jacking point No.1 & 2 - bearing plinth
Temporary support for (designed under
future bearing replacement separate
submission by
others)
V-Pier and Cross Beam Plan View on Bearings and Temporary Jacking
points on V-Pier and Cross Beam
Deck
Temporary Deck
jacking point No.2
(sand jack) Bearing Plinth
Temporary
jacking point No.1
(hydralic jack for
adjustment) Temporary jacking
point No.1 & 2
project no: HK077 (91558) sheet no.
project title: Cross Bay Link 2
section: Precast V-piers and Crossbeam date 15/01/2019
calcs for: Temporary Jacking Point Reinforcement by rw
Design Loads
The design loads on the temporary jacking points are provided to us by the Engineer and
the Contractor, the design loads are as follow:
- Temporary jacking points 1 8740 kN per jacking point (during erection) *
11799 kN per jacking point (ULS: 1.35 x Deck dead load)
- Temporary jacking points 2 8740 kN per jacking point (during erection) *
11799 kN per jacking point (ULS: 1.35 x Deck dead load)
- Temporary jacking points 1 & 2 23175 kN per 2 jacking points (during future bearing replacement, SLS)
30685 kN per 2 jacking points (during future bearing replacement, ULS)
(conservatively taken as max. ULS and SLS bearing load)
*Design load during erection is taken as the maximum deck load among all jacking points provided by
Meinhardt. (see table in appendix)
Stress limitation for reinforcement σs = 250 MPa (at SLS Crack Width)
σs = 375 MPa (at SLS Stress Check)
σyd = 435 MPa (at ULS)
project no: HK077 (91558) sheet no.
project title: Cross Bay Link 3
section: Precast V-piers and Crossbeam date 15/01/2019
calcs for: Temporary Jacking Point Reinforcement by rw
Bearing Type Unit Jacking point 1 Jacking point 2 Jacking point 1&2
Jacking Width, b1 (see note 4) (mm) 800 800 1600 A = bearing plan
Point
Dimension Length, b2 (see note 4) (mm) 800 800 800 area = b1 x b2
Bearing SLS Max (kN) 8740 8740 23175
Vertical
Loads ULS Max (kN) 11799 11799 30685
No of Jacking Points (-) 1 1 2
Bearing pressure, P / A (SLS) MPa 13.7 13.7 9.1
Bearing
Allowable = 0.6*fck (J.102) MPa 27.0 27.0 27.0 7.2(2)
stress
check at Bearing OK at SLS? (-) OK OK OK Bearing at SLS is ok
contact Bearing pressure, P / A (ULS) MPa 18.4 18.4 12.0
point
Allowable = 0.6*fck (J.102) MPa 27.0 27.0 27.0
Bearing OK at ULS? (-) OK OK OK Bearing at ULS is ok
Bursting At SLS (kN) 1311 1311 1738
Force At ULS (kN) 1770 1770 2301
Reinf' At SLS (mm2) 5244 5244 6953
required,
As,req At ULS (mm2) 4071 4071 5293
Reinf' BM95c (closed link) (-) 4 B 25 4 B 25 8 B 25
Check BM95b (single leg bars) (-) 12 B 25 12 B 25 24 B 25
Reinf' 95 (U bar) (-) 4 B 25 4 B 25 8 B 25
provided (-) B B B
(mm2) 9817 9817 19635 Anti-bursting
As,prov reinforcement provided
(-) OK OK OK is ok
The depth of the anti-bursting rebars, h, will be the same as b2 (e.g. 800mm for jacking
points 1 and 2).
project no: HK077 sheet no.
project title: Cross Bay Link
section: date
calcs for: by
a) Steel Area from Cross Beam Transverse Reinforcement: Accordingly to Information from AECOM's Designer:
Rebar Size 25 mm Both Jacking Point 1 and 2 will be used simultaneously for
Spacing 150 mm Bearing Replacement Jacking Operation
Effective Width 3785 mm
No. of Effective Rebars 26 nos.
Steel Area Provided 12762.7 mm2
Total Steel Area Provided a) + b)+ c) : 19144.1 mm2 > 17816.1 mm2 OK!
Case 2) Edge Sliding Check at Outer Bearing (for Bearing Replacement Scenario)
ULS Permanent Load (Conforming) 31000 kN From 60329339/C1/SK0007 Rev.-)
c) Steel Area from Cross Beam Edge Side Bar On Free End (Ony Consider the top 3 bars to be effective)
Rebar Size 40 mm
Spacing 0 mm
Effective Width 0 mm
No. of Effective Rebars per layer 1 nos.
No. of Layers 3 layers
Total No. of Rebars 3 nos.
Steel Area Provided (Effective) 3769.91 mm2
Total Steel Area Provided: 18496.1 mm2 > 17816.1 mm2 OK!
E4 Cross Beam - Edge Sliding Check for Box Girder Erection Stage
Box Girder Self-Weight 25070 kN
Max. Support Reaction 8740 kN
ULS Load Factor (Jacking) 1.4
Case 1a) Edge Sliding Check at Inner Bearing Using Jacking Point 1 / Point 2 (Box Girder Erection Stage)
Total Steel Area Provided: 14726.2 mm2 > 14064.4 mm2 OK!
Case 2a) Edge Sliding Check at Outer Bearing Using Jacking Point 1 (Box Girder Erection Stage)
c) Steel Area from Cross Beam Edge Side Bar On Free End (Ony Consider the top 3 bars to be effective)
Rebar Size 40 mm
Spacing 0 mm
Effective Width 0 mm
No. of Effective Rebars per layer 1 nos.
No. of Layers 3 layers
Total No. of Rebars 3 nos.
Steel Area Provided (Effective) 3769.91 mm2
Total Steel Area Provided: 18496.1 mm2 > 14064.4 mm2 OK!
Case 2b) Edge Sliding Check at Outer Bearing Using Jacking Point 2 (Box Girder Erection Stage)
c) Steel Area from Cross Beam Edge Side Bar On Free End (Ony Consider the top 3 bars to be effective)
Rebar Size 40 mm
Spacing 0 mm
Effective Width 0 mm
No. of Effective Rebars per layer 1 nos.
No. of Layers 3 layers
Total No. of Rebars 3 nos.
Steel Area Provided (Effective) 3769.91 mm2
Total Steel Area Provided: 15060 mm2 > 14064.4 mm2 OK!
project no: sheet no.
project title:
section: date
calcs for: by
Bearing Schedule
Bearing Schedule (from
from Contractor
Employer's Design)
project no: sheet no.
project title:
section: date
calcs for: by
Deck Weight
Drawing of Size and(Provided by
Location of Temporary
Meinhardt)
Jacking from Contractor
Simon Li
TW-D-073
ANNEX A - Summary of Support Reactions at Temporary Jacking Points Due to Self-weight of Precast
寄件者:
Box Girder Jason Lu <jasonlu@meinhardt.com.hk>
寄件日期: 2020年1月14日星期二 19:43
收件者: 'Simon Li'; 'Ray Wong'; 'Kenny Yu'; '91558'; 'David Lee'
副本: ronald.lee@crbc.com.hk; 'arnold chan'; 'Chiu Ho Yin'; fortressdev@hotmail.com
主旨: RE: E5 Edge Sliding Reinforcement at Jacking Points
Dear Ray,
As discussed yesterday, please find below the support force of E bridge due to self-weight at installation
stage for your use.
Regards
Jason Lu
MIEL
1
project no: HK077 sheet no.
project title: Cross Bay Link
section: date
calcs for: by
A "EFFECTIVE WIDTH"
2942
"EFFECTIVE WIDTH"
2nos. of 2nos. of
800x800 Additional Anti-Edge 800x800 800 800
800
JACKING JACKING JACKING JACKING JACKING JACKING JACKING JACKING
T25-300 (10 nos.) POINT 2 POINT 1 POINT 1 POINT 2 POINT 2 POINT 1 POINT 1 POINT 2 T25-300 (10 nos.)
Additional Anti-Edge T25-300 (13 nos.) T25-300 (13 nos.) Additional Anti-Edge
508
Sliding Rebars Additional Anti-Edge Additional Anti-Edge Sliding Rebars
Sliding Rebars Sliding Rebars
T.A.L. T.A.L.
1600
RB GL 1250x1250x286
E3
CROSS BEAM
1800
800
RB GL 1250x1250x286
E3 800 800
SECTION A-A
2942 3785 3785 2942
B "EFFECTIVE WIDTH"
2942
"EFFECTIVE WIDTH"
2nos. of 2nos. of
800x800 Additional Anti-Edge 800x800 800 800
RB GL 1250x1250x286
E3
CROSS BEAM
1600
558
RB GL 1250x1250x286
E3
800 800
SECTION B-B
2942 3785 3785 2942