Professional Documents
Culture Documents
Sumitomo Mitsui Construction Co., Ltd. –World Kaihatsu Kogyo Co., Ltd. JV
Dear Sir,
This is in connection with Section 6.4, in relation to Section 5.1 and 5.2, of the General Construction
Specification and other relevant sections and sub-clauses about the guidelines under Contract Package
2, submitting the method statement for construction of cast-in-SITU RC side ditch.
Sincerely yours,
Yasutomo Akasaka
Project Manager
Page 1 of 1