TEST AND INSPECTION PER: 31-SAMSS-004 & API-610, and Specifications As Noted Below.
0020
0020
*** R X
In process inspection & test requirement
Nondestructive Testing Requirements: a)Radiographic
Specification Details / Notes:
If the peripheral velocity of the impeller at rated speed is 75 m/s
Examination (250 fps) or higher. After rough machining, see 31 -SAMSS-004
for details.
0030 R X Nondestructive Testing Requirements: b)Liquid Penetrant For impellers, if the peripheral velocity at rated speed is 45 m/s
Examination or Wet Fluorescent Magnetic Particle Inspection. (150 fps) or higher, per ASME Sec. VIII, Div.1 Appx 6 & 8.
0060 R X Post Weld Heat Treatment Mandatory after major weld repairs per applicable
specifications.
0070 R X Hardness Testing For parts exposed to sour service and shall meet ISO 15156.
0030
0010
*** R X
Final inspection & test requirements
Dynamic Balancing
Specification Details / Notes:
Per API 610. Shall be dynamically balanced to grade G.2.5 of
ISO 1940.
Notes:
(1) Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.
End of IR790700