Professional Documents
Culture Documents
1. Logika Proses
2. Korelasi Besaran – Besaran
3. Fungsi Hantar
4. Karakteristik Pengendali
5. Tuning (Belum selesai dan belum disimulasikan)
1. Hand Valves (HV1 – HV10) : Input/output isolation valve. HV8 is used for load change/flow
adjustment of the cold water stream
2. Rotameter (FI1-FI2) : Local flow indication
3. Hot water tank (TN1) : Hot water is heated and circulated through the hot water circuit
4. Cold water tank (TN2) : Cold water is received from the tap and pumped through the
water circuit and eventually drain
5. Plate Heat Exchanger (HE1) : The plate heat exchanger is where the heat transfer process
takes place from hot to cold
6. Pumps (P1,P2) : Used for circulating the hot and cold liquid through the system
7. Temperature transmitter (TT1) : A RTD temperature element with 4 t 20 mA transmission to the
controller
8. Temperature controller (TIC1) : integrated microprocessor based PID controller with recorder.
This controller receives 4-20 mA signal from TT1 and output 4-20 mA to the I/P positioner
9. Control valve (CV1) : final control element
10. Temperature Recorder (TR1) : the integrated temperature controller with recorder is used to
record the process temperature TT1 and controller TIC1 setpoint value. It is very useful for studying
the dynamics of the temperature control loop and for tuning purposes
11. Heater Controller (TIC2) : A simple temperature controller with RTD input and controls the
powder to the heater element
8. Tekan tombol ON pompa sirkulasi air panas (P1). Atur bukaan MV pada PC menjadi 0% secara
manual kemudian atur HV2 sehingga laju alir FI1 menjadi 2 LPM. Atur MV pada PC pada nilai
100% secara manual kemudian atur HV2 sehingga laju alir FI1 terbaca 20 LPM
9. Tekan tombol ON pompa air dingin (P2). Atur laju alir air pendingin mendekati 5 liter per menit
dengan menggunakan HV8.
10. Tunggu hingga TN1 mencapai 50oC dan tercapai kondisi steady state.
A. START UP
Sesuai prosedur
B. PROSEDUR PERCOBAAN
1. Atur bukaan MV (%PO) dari PC
2. Lakukan perubahan MV (%PO) dengan interval kenaikan 10% dimulai dari 0% hingga mencapai 100%
3. Setiap kenaikan 10%, catat %PV pada PC, laju alir pada FI1, dan tekanan pada barometer (lihat
gambar)
4. Ulangi langkah 1-3 untuk nilai bukaan MV (%PO) dari 100% ke 0%
C. SHUT DOWN
Sesuai prosedur
No. MV Laju alir air panas (FI1) Tekanan %PV MV Laju alir air panas (FI1) Tekanan %PV
(%PO) (liter/min) (psi) (%PO) (liter/min) (psi)
1 100
2 90
3 80
4 70
5 60
6 50
7 40
8 30
9 20
10 10
11 0
PROSEDUR FUNGSI HANTAR
A. START UP
Sesuai prosedur
B. PROSEDUR PERCOBAAN
1. Pastikan peralatan pada kondisi “Manual Mode”
2. Atur bukaan MV (%PO) dari PC pada nilai 0%-20%
3. Tunggu sampai nilai %PV mencapai kondisi steady state
4. Beri perubahan bukaan MV (%PO) dari PC sebesar 20%-30%, record data yang Anda dengan cara
berikut :
a. Pilih menu “Data Logging”
b. Atur waktu interval pengambilan data kemudian klik “Auto” untuk mulai merekam data
C. SHUT DOWN
Sesuai prosedur
PROSEDUR FUNGSI HANTAR
A. START UP
Sesuai prosedur
B. PROSEDUR PERCOBAAN
1. Masukkan nilai PB = 100, I = 0, dan D = 0
2. Ubah setting alat menjadi Auto Mode melalui PC dan masukkan nilai setpoint (SV) sebesar 40%
3. Rekam data Anda melalui PC dan tunggu 1 menit
4. Ubah nilai setpoint menjadi 45%
5. Tunggu hingga mencapai kondisi steady state
6. Hentikan waktu perekaman data dan simpan data Anda
7. Lakukan langkah 1 – 6 dengan nilai PB, I, dan D
P I D
100 0 0
1 14,3 0 0
3,3 0 0
1 0
2 PB terbaik 5 0
10 0
1
3 PB terbaik τI terbaik 5
10
C. SHUT DOWN
Sesuai prosedur
PROSEDUR TUNING (ZIEGLER - NICHOLS)
START UP
Sesuai prosedur
PROSEDUR PERCOBAAN
PB = PBc/2
I = Pc/1.2
D=Pc/8
SHUT DOWN
Sesuai prosedur