Power & Water Utility Company for Jubail Document ID No : MSSF-1-SF-040

and Yanbu (MARAFIQ) Page: 1 of 1

Rev. No.: 0
OHSMS FORMS
Date of issue: 10 Feb 2015

40. METHOD STATEMENT TEMPLATE

Project name /# : Yasref housing Project-Yanbu Expected duration: Two days


Company: Abdullah Faleh Al Dossary Sons Exact location: As per drawing attached
Scope of work with plan / drawing:

Tie in Connection for Potable Water System (04 Locations)


Job title # Personnel
No of personnel / job title 1. Tie In for Potable Water 06
System
2
1. Sets of Generator, Power & electricity, excavation,
Materials, tools & equipment plumbing tools.
2
3
Specify all the required PPEs Helmet, Gloves, Safety glass, Safety Shoes, Safety Vest
Waste removal & Housekeeping: Disposed at Approved designated Potable landfill by
RCY
Sequence of works. Significant risk Mitigation plan
1. Excavation & Shoring 1. Collapse of Shoring Proper Shoring Protection
2. Backfilling 2. Property Damage Proper PPE / MSDS
3. Lifting 3. Falling Object Third party inspection
Chemical name Precautions
Attach Material Safety Data Sheets for
all chemicals to be used

Details of training Expert Plumbers & Pipe Fitters

Emergency arrangements: De-watering Pump

Prepared by Supervisor:
Nikhil G
Approved by the Job coordinator:

OPRIETARY NOTICE IMPORTANT


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS
EXPRESSLY PROHIBITED EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.

You might also like