Contract Management
Lecture No. 03
Topics to Cover
Registration of Contractors with PEC
PEC Registration Procedure for Constructors /Operators
Documents Required with Constructors/Operators Applications
PEC Registration Categories
PEC Fee criteria for up-gradation of category for Constructors/Operators firm
Computation of Professional Credit Points (PCPs)
PEC Registration of Consultants
Contractors are therefore classified according to the cost of works for different
type of works.
Both Pakistani & Foreign Constructors / Operators can obtain PEC Registration
by applying on the Prescribed Forms available from all PEC offices.
The application cases are then scrutinized and information given by the
applicant is verified by PEC. In case of no discrepancies found, the Enrolment
Committee makes decision to register the applicant.
A copy of NTN certificate of owner and firm will be required for all types of
applications
Construction
"Construction" of any engineering work shall also mean to include surveys, sub-
soil and other investigations, erection, installation, testing and commissioning
and execution of all activities required to achieve the desired final shape of an
engineering work, and shall also include extension remodeling, rebuilding and
repair works and all other works incidental thereto.
Operation
For every professional engineer employed without break for Bonus pcp credit.
10-14 years .. .. .. .. 2
15-19 years .. .. .. .. 4
20-24 years .. .. .. .. 8
25 years and over .. .. .. .. 12
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 28
CE-898
Contract Management
(a) MS / ME .. .. .. .. 2 points.
(b) Ph.D. / D.E. .. .. .. .. 4 points.
(c) Fee paid for life. .. .. .. .. 1 point.
Provided that extra bonus professional credit points shall not exceed the pcp
earned for the year of experience as per clause (1).
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 30
CE-898
Contract Management
(i) in the case of constructor, one point for every twenty million rupees
construction cost of projects in hand at any time, or the minimum
requirement of pcp credit prescribed for the category of his licence,
whichever is more; and
(ii)in the case of an operator, one point for every twenty million rupees cost
of projects in hand at any time or the minimum requirement of pcp credit
prescribed for the category of his license, whichever is more.
5. For computation of pcp credit as per bye-law (4) above, the aggregate
professional experience in terms of full years of all professional engineers
employed by the licensee on full time basis shall be counted as professional
credit points to the credit of the licensee at the time.
For the purpose of computing the construction and capital cost of projects,
the total costs of all the projects in the hands of the licensee shall be added.
Assignment No 02
Task 1
• What is the PEC’s Registration Procedure for Consultants? State all the key
documentation requirement, categories and fees for the registration purpose
Task 2
• What is the Registration Criteria set forth by PEC for the Foreign Constructors
and Operators with PEC? State all the key documentation requirement,
categories and fees for the registration purpose.
.
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 37
CE-898
Contract Management
Assignment No 02
Task 3
• Prepare an advertisements for pre-qualification of CONSULTANTS &
CONTRACTORS for construction of 100-bed hospital at NUST Islamabad
Campus.
The advertisement should be prepared in the light of PEC Standard Procedures for
Pre-qualification of Contractors and Consultants. Make up the items as necessary
to make a good example.
Deadline: ??. Oct.2018 (1159 Hrs)
• Submission: on LMS only, A4 size, MS Word format, no limit on No. of Pages
Any Queries?
Thank You