Topics to Cover
Registration of Contractors with PEC
PEC Registration Procedure for Constructors /Operators
Documents Required with Constructors/Operators Applications
PEC Registration Categories
PEC Fee criteria for up-gradation of category for Constructors/Operators firm
Computation of Professional Credit Points (PCPs)
PEC Registration of Consultants

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 2
CE-898
Contract Management

Enlistment or Registration of Contractors with PEC

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 3
CE-898
Contract Management

Enlistment or Registration of Contractors


 Since construction works are of several types like buildings, highways, bridges,
dams, canals, airports, etc.; value of work will vary from some million rupees
to billion rupees.

 Therefore, contractors of varying experience and financial capabilities are


required for different jobs and of different values.

 Contractors are therefore classified according to the cost of works for different
type of works.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 4
CE-898
Contract Management

Enlistment or Registration of Contractors


 Enlistment / Registration is done to have a ready list of suitable and
competent contractors for various type of works so as to minimize
requirement of verification of credentials of contractors at the time of
individual tenders by clients.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 5
CE-898
Contract Management

PEC Registration Procedure


for Constructors /Operators

Following are provided along with this lecture:

• Engineering Works Bye Laws


• Constructors / Operators new policy (2017)
• New Registration Application Form
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 6
CE-898
Contract Management

PEC Registration Procedure for Constructors and Operators


 To obtain registration with PEC as constructor / operator, one must meet the
registration criteria for the category in which registration is applied for.

 Both Pakistani & Foreign Constructors / Operators can obtain PEC Registration
by applying on the Prescribed Forms available from all PEC offices.

 Before filling in this form, it is recommended to see Engineering Works


Bye Law 4 (Licenses) and Bye Law 8 (Applications, renewals, fees and
penalties). –

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 7
CE-898
Contract Management

PEC Registration Procedure for Constructors and Operators


 After filling in this form according to the instructions given, it should be
submitted at one of the PEC offices along with the documents required and
the prescribed fee for the category applied for.

 The application cases are then scrutinized and information given by the
applicant is verified by PEC. In case of no discrepancies found, the Enrolment
Committee makes decision to register the applicant.

 Thus, a License / Enlistment Certificate is issued to the Pakistani / Foreign


Constructor / Operator.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 8
CE-898
Contract Management

Documents Required with


Constructors/Operators Applications

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 9
CE-898
Contract Management

Documents Required With Constructors/Operators Applications


Application for enlistment or renewal of constructors or operators in any
category must contain the following documents:-

 A financial certificate in favor of the firm from any scheduled bank;

 A list of works executed by the company director/shareholders or proof of


sufficient experience of his engineers in previous years indicating value of
projects, name of employers and certificates of satisfactory completion by the
respective employers;

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 10
CE-898
Contract Management

Documents Required With Constructors/Operators Applications


 Evidence of ownership of existing infrastructure (Plant / Machinery /
Equipment etc), if any

 Bank statement of last one year or statement of income/expense reviewed by


Chartered Accountant in case of Sole proprietor/Individual/AOP.

 Audited report / Account Statement in case of Pvt Ltd Company

 Organization chart of the firm showing chain of command;

 List of Engineers and other staff members;


Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 11
CE-898
Contract Management

Documents Required With Constructors/Operators Applications


 Curriculum Vitaes of technical staff along with National Identity Card number
and National Tax number, if any;

 A copy of NTN certificate of owner and firm will be required for all types of
applications

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 12
CE-898
Contract Management

Documents Required With Constructors/Operators Applications


Change in Policy

− The condition of providing affidavit of engineers for employment with


contractor/operator firm by the constructors/operators be abolished
henceforth.

− An information by a constructor/operator on his letter head and on plain


paper duly signed by the concerned engineer will be considered sufficient.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 13
CE-898
Contract Management

Construction & Operation

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 14
CE-898
Contract Management

Construction

"Construction" of any engineering work shall also mean to include surveys, sub-
soil and other investigations, erection, installation, testing and commissioning
and execution of all activities required to achieve the desired final shape of an
engineering work, and shall also include extension remodeling, rebuilding and
repair works and all other works incidental thereto.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 15
CE-898
Contract Management

Operation

"Operation" means the supervision and management of running, operation and


execution of all activities required to efficiently operate a project after it is
constructed by a constructor in order to achieve the aims and objectives of the
project.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 16
CE-898
Contract Management

PEC Registration Categories for Constructors

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 17
CE-898
Contract Management

PEC Registration Categories for Constructors


Financial limits, PCPs requirements & applicable fee for Local Constructors
Financial limits, PCPs requirements & applicable fee for Local
Constructors

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 18
CE-898
Contract Management

PEC Registration Categories for Operators

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 19
CE-898
Contract Management

PEC Registration Categories for Operators


Financial limits, PCPs requirements & applicable fee for Local Operators

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 20
CE-898
Contract Management

Fee criteria for up-gradation for Constructors/Operators firm

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 21
CE-898
Contract Management

Fee criteria for up-gradation for Constructors/Operators firm


Following fee criteria shall be observed for up-gradation of the category of
license besides fulfillment of requirements laid down in PEC bye-laws, namely:

a. One step up - fee of desired category;

b. Two steps up - 2 times of desired category;

c. Three steps and onward - 3 times of desired category;

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 22
CE-898
Contract Management

Engineer Owned Firms

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 23
CE-898
Contract Management

Engineer Owned Firms


 The serial number of engineer’s owned firm will be distinguished by
adding”/E”
 Evidence that Engineer having minimum 20 % shareholding in the firm.
 Engineer should be Chairman/COO/CEO/Managing Director/
Director/Managing Partner.
 Engineer can directly apply for registration with PEC without providing the list
of works and can be registered in relevant category directly. However,
engineer’s owned new firm will provide evidence of registration with SECP for
registration in category C-3/O-3 and above.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 24
CE-898
Contract Management

Engineer Owned Firms


 Engineer owned firm desiring new registration in C-6/O-6 to C-2/O-2 category
will deposit registration fee only and will be exempted from payment of three
times of fee as desired.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 25
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 26
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


Clause 5 of Engineering Works Bye-Laws
1. Five pcps shall be earned by each “registered engineer”; one pcp shall be
allowed for each year of experience to professional engineers engaged in the
construction and operation of engineering works from the date of passing
B.Sc Engg or B.E. degree subject to minimum of 10 pcps and maximum of 30
pcps. However, pcps beyond 65 years of age be reduced at following scale:-

(i) 65 – 75 years .. .. .. 1 pcp/year;


(ii) 75 – 80 years .. .. .. 2 pcp/year; and
(iii) above 80 years .. .. .. 5 pcp/year

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 27
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


2. Those applicants/licensees who have in their permanent employment
professional engineers registered with PEC other than partners and
shareholders having more than 15 percent share, who have continuity of
service in the applicant's organisation of more than 10 years will be entitled to
bonus professional credit points as follows:-

For every professional engineer employed without break for Bonus pcp credit.
10-14 years .. .. .. .. 2
15-19 years .. .. .. .. 4
20-24 years .. .. .. .. 8
25 years and over .. .. .. .. 12
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 28
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


2A. Extra points for postgraduate engineers and those who have paid
membership fee for life shall also be allowed as under:-

(a) MS / ME .. .. .. .. 2 points.
(b) Ph.D. / D.E. .. .. .. .. 4 points.
(c) Fee paid for life. .. .. .. .. 1 point.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 29
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


3. Applicants having professional engineers as their owners, partners or
shareholders shall be entitled to extra bonus professional credit points as
follows:
Equity of professional engineers Extra bonus pcp credit
10-19% .. .. .. .. 05
20-49% .. .. .. .. 10
50-74% .. .. .. .. 15
75% and over .. .. .. .. 20

Provided that extra bonus professional credit points shall not exceed the pcp
earned for the year of experience as per clause (1).
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 30
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


4. Regardless of the category, the license granted by the Council obliges every
licensee to maintain such professional engineering strength to manage the
projects at hand that he has at all times a pcp credit of:-

(i) in the case of constructor, one point for every twenty million rupees
construction cost of projects in hand at any time, or the minimum
requirement of pcp credit prescribed for the category of his licence,
whichever is more; and

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 31
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


4. Regardless of the category, the license granted by the Council obliges every
licensee to maintain such professional engineering strength to manage the
projects at hand that he has at all times a pcp credit of:-

(ii)in the case of an operator, one point for every twenty million rupees cost
of projects in hand at any time or the minimum requirement of pcp credit
prescribed for the category of his license, whichever is more.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 32
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)

5. For computation of pcp credit as per bye-law (4) above, the aggregate
professional experience in terms of full years of all professional engineers
employed by the licensee on full time basis shall be counted as professional
credit points to the credit of the licensee at the time.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 33
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)

Part timers shall be omitted from the computation.

For the purpose of computing the construction and capital cost of projects,
the total costs of all the projects in the hands of the licensee shall be added.

These costs shall be based on signed construction contracts, proposals,


tenders or estimates.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 34
CE-898
Contract Management

Computation of Professional Credit Points (PCPs)


The licensee shall ensure that the actual professional credit points including
bonus and extra bonus points at any time in his organization shall not be
lower by more than 20 percent for a period not exceeding twelve weeks at
any one time.

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 35
CE-898
Contract Management

PEC Registration for Consultant

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 36
CE-898
Contract Management

Assignment No 02
Task 1
• What is the PEC’s Registration Procedure for Consultants? State all the key
documentation requirement, categories and fees for the registration purpose

Task 2
• What is the Registration Criteria set forth by PEC for the Foreign Constructors
and Operators with PEC? State all the key documentation requirement,
categories and fees for the registration purpose.
.
Dr.-Ing Abdur Rehman Nasir
Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 37
CE-898
Contract Management

Assignment No 02
Task 3
• Prepare an advertisements for pre-qualification of CONSULTANTS &
CONTRACTORS for construction of 100-bed hospital at NUST Islamabad
Campus.
The advertisement should be prepared in the light of PEC Standard Procedures for
Pre-qualification of Contractors and Consultants. Make up the items as necessary
to make a good example.
Deadline: ??. Oct.2018 (1159 Hrs)
• Submission: on LMS only, A4 size, MS Word format, no limit on No. of Pages

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 38
CE-898
Contract Management

Any Queries?

Thank You

Dr.-Ing Abdur Rehman Nasir


Assistant Professor of Construction Engineering and Management 26.09.2019
NIT (SCEE), NUST H-12, Islamabad 39

You might also like