Professional Documents
Culture Documents
External Clients
a. Cosmetique Asia – cosmetic products (Silka Papaya,
soap and lotion sachets)
FORMULAS:
Total gsm = (printing substrate x density) + ink gsm + adh gsm - If exact repeat, no need to check all JO details
+ (laminant film x density) - Verify product name and quantity based on
production schedule
Weight per roll = (total gsm/1000) x (roll width/1000) x length - Indicate delivery date based on required delivery
per roll dates on PO
- Check qty of films to be used based on WHS Raw
Number of rolls = total qty to produce / weight per roll Material Stock Position and Slow Non Moving
Report. If no available film, recommend alternative
Meters to produce = Number of rolls x (length per film to be used.
roll/number of outs across) / waste allowance - Return to Jr. Analyst if there are revisions, if no
revision forward to Log Head for approval
Note: Waste Allowance 6. Distribute 8 copies (QA, Production, IMT, PRT, LAM, 2 SLT,
500kg – 1000kg = 15% (for double process in Lamination only) WHS)
Below 2000kg = 10%
2000kg and above order = 7% JOB ORDER (NEW PRODUCT)
1. Receive copy of Technical Specifications from R&D
Ink gsm 2. Receive cylinder requisition slip and New Product Notice
- Based on previous JO or on updated 3 months’ from Technical Sales Engineer
documentation of Daily Ink Dry Weight Monitoring from QC 3. Send winding direction from customer to determine their
required delivery figure and indicate it in JO
Ink Requirement computation per color 4. Get Production Schedule from Production Planner
- Get Ink and Solvent Consumption Report of Ink Matching to 5. Indicate the JO number and coordinate with Ink Matching
determine the previous meters produced and ink consumed Supervisor for the color guide number
of each product 6. Include the name of the product and the customer’s name.
For Outside Job, PO# is included
Ink Requirement = (Previous Ink Consumption / Previous 7. Since it is a new product, MARK NEW JOB
meters produced) x qty to produce in meters 8. Compute and include the following
- Input total quantity to produce based on CVT Production
Slitting guide to guide = repeat across x number of outs + Schedule.
2mm - Get cylinder size, repeat around, across and number of outs
across from cylinder RS
Constants - Input the following based on Tech Specs: Printing substrate
Printing substrate: (printing substrate thickness/1000) x (thickness & width), sealant, ink gsm, adhesive gsm and
density x (film width/1000) length per roll
Laminant film: (laminant film thickness/1000) x density x (film 9. Specify the type of Printing, reverse or surface, type of ink
width/1000) 10. Adhesive
11.Color sequence, solvent ratio
PRINT: ((printing substrate thickness x density x print
gsm)/1000) x (film width/1000) JOB ORDER (REPLACEMENT RUN)
1. Receive replacement memo from converting
LAM: ((printing substrate thickness x density + print gsm + 2. Make a new copy from previous JO that needs to be
adh gsm + laminant film thickness x density)/1000) x replaced
(((printing substrate film width + laminant film 3. Type the word replaced under JO #
width)/2)/1000)
JOB ORDER (MOLDING) Note: Refer to Molding Product Information dated December
1. Input the following 19, 2013 for specification, mixing ratio and packing
- JO Number
- Date of Job Order 6. Duration
- Product Name (Arrange items per product’s part) For excess:
- Quantity to produce in pcs (from Production Number of days = (Excess / Next month’s projected
Schedule) requirement) x 30 days
- Standard weight per piece in grams
- Type of raw materials to be used per product (PVC, For additional:
PET, PP resin, masterbatch) Number of days = (Additional / Next month’s projected
- Mixing ratio of raw materials (virgin resin, recycled requirement) x 30 days
resin, masterbatch)
2. Compute the required quantity of raw materials to be used Duration date = Number of days + Cut off
Formula:
3. Sign the printed JO Expected Target Arrival (Omni Plant) = Duration date – 7 days
4. Submit Asst. Logistics Head and Logistics Head for approval
5. Give a copy to Molding Department Production Head 7. Submit RMC to Senior Analyst and Asst. Logistics Head for
checking and to Logistics Head for approval
RAW MATERIAL COMPUTATION (MOLDING) 8. Submit RS to Senior Analyst & Asst. Logistics Head for
Objective: To provide proper directions in computation of approval
Moulding raw material and to ensure enough stocks raw
materials to be used in production