1805-E33-400-007
CLIENT: PROJECT
NO.
1805
Sheets No. 1 of 59
PROJECT
EPC TITLE
SRS Tankage and Terminal work
CONTRACTOR:
LOCATION Hamriyah, Sharjah, UAE
Chemietech DMCC
Project Name : 1805 - SRS Tankage and Terminal work, Hamriyah,
Sharjah, UAE
A APPROVED
APPROVED WITH COMMENTS, PROCEED FOR FURTHER
B
WORK SUBJECT TO COMMENTS INCORPORATION.
C NOT APPROVED, REVISE AND RESUBMIT
D RETAINED FOR INFORMATION
Reviewed By : AJD DATE : 19.09.2019
REVISION
REVISION
DATE DESCRIPTIONS PREPARED BY CHECKED BY APPROVED BY
NO
THIS DOCUMENT, DATA OR ANY INFORMATION CONTAINED HEREIN IS CONFIDENTIAL BEING THE PROPERTY OF CHEMIE TECH. NO CONTENTS OF THIS DOCUMENT DATA OR
INFORMATION SHALL BE REPRODUCED EITHER IN PART OR FULL IN ANY MANNER WHATSOEVER OR DISCLOSED TO ANY OTHER PARTY OR USED BY ANY OTHER PARTY FOR WHATEVER
PURPOSE WITHOUT THE WRITTEN APPROVAL OF CHEMIE‐TECH. THIS DOCUMENT DATA AND INFORMATION IS FOR THE EXPRESS USE OF THE CLIENT MENTIONED.
BUS DUCT INSTALLATION MANUAL
Sustainable Reliable Solutions
Project No.: 1805 1805-E33-400-007
REVISION LOG
REV
REV DATE REVISED PAGE REVISION DESCRIPTION
NO.
Note:-
Before installing the system on the site, you must read and
follow the instructions on storage,
transport and handling.
Manual overview
General information: Brief overview of busbar trunking system components and how
they are installed
Installation: Description of how the busbar trunking system elements are installed.
Warning:-
Handling
Busbar trunking system elements can be moved using
a forklift and/or suspended from slings.
Safe handling
As with all electrical equipment, this material should be handled with care, following the
instructions.
Proceed with caution and pay attention to personnel safety. Use all equipment necessary
for correct handling of the material.
03
Suspension from slings
02
Handling
Busbar trunking system elements can be moved using
a forklift and/or suspended from slings.
Storage
The material storage area has to meet the following requirements:-
N
mm
285
02
M8 Washer
M8 Allen Screw
01
Joint Assembly
Joint Assembly
03 04
Check the distance between the elements again and ensure that it is 285 mm.
Joint Block single stack installation
Spanner
05 06
07 08
Check the distance between the elements again and ensure that it is 285 mm.
Joint Block double stack installation
M8 Washer
M8 Allen Screw
01
02
04
03
Check the distance between the elements again and ensure that it is 285 mm.
Joint Block double stack installation
06
Shear off nuts
05
07 08
Tap- Off box installation
01
02
03
Locking Leg
Tap- Off box installation
04
A B C
Horizontal Fixing single stack
Flatewise installations
Edgewise installations
Vertical spring hanger
Busbar Riser
Floor Slab
Vertical Spring
Hanger assembly
Vertical Spring
Hanger assembly
Horizontal Fixing
Unistrut channel 41 x 41
not in RR scope
Unistrut channel 41 x 41
not in RR scope
Busbar trunking system on a spring hanger for vertical installation on the floor.
End Cover
02
PVC Sheet
01
04
03
05
06
End Cover double stake
End Cover
PVC Sheet
02
01 04
03
05
06
ASTA Publication 7 Issue 10
Supplementary Certificate
Extends the scope of an existing Certificate to cover changes in rating or in design
Authenticity
Authenticity of any ASTA document can be confirmed by contacting the Intertek office detailed on the
front of this document.
` Certificate No. 21610
Page A
VERIFICATION OF THE BTS DESIGN BY TESTS
-for a straight busbar trunking unit 10.2.101.1 Heavy mechanical loads: Verified
-for a joint 10.2.101.2 Heavy mechanical loads: Verified
Resistance of the enclosure to
10.2.101.3 Heavy mechanical loads: Verified
crushing
Lifting 10.2.5 Verified
Mechanical Impact test 10.2.6 Verified: IK 10
Marking 10.2.7 Verified
External enclosure: IP 65, category 1
2 Degree of protection of enclosures 10.3
Verified
8kV (Uimp)
3 Clearances 10.4
Verified
Material Group: IIIa
4 Creepage distances 10.4 1000V (Ui) for pollution degree 3
Verified
Protection against electric shock
5 10.5 Verified
and integrity of protective circuits:
Effective continuity between the
exposed conductive parts of the BTS 10.5.2 Verified
and the protective circuit
Short circuit withstand strength of the 10.5.3.3
protective circuit
* Note: Design verification tests required by IEC 61439-6, Annex D, Table D.1. No verification by testing is
required for items 6, 7 and 8 clauses 10.6, 10.7 and 10.8
Date of Tests: 28th August 2017 to 20th January 2018 M Yahia, ASTA Observer
` Certificate No. 21610
Date of Tests: 28th August 2017 to 20th January 2018 M Yahia, ASTA Observer
`
Page C
Rating of the
Busbar Trunking X μΩ/m R20 μΩ/m Z20 μΩ/m R35 μΩ/m Z35 μΩ/m
System Assembly
Date of Tests: 28th August 2017 to 20th January 2018 H. K. Mishra, ASTA Observer