Diketahui:
Jawab:
2 DS 2 x 1200 x 20
a. EOQ = Q* =
√H
=
√8,4
D
=75 ,6=76 batteries
1200
b. Order will be placed per year: N = = =15 ,8 order per tahun
Q∗¿ ¿ 76
D 1200
c. The Ordering Cost : S= x 20 = 315, 79
Q∗¿ ¿ 76
Q∗¿ 76
The Holding Cost : ¿H= x 8,4 = 319, 20
2 2
MRP
a. Product Structure
Level 0 S
V
2 Weeks
W T
3 Weeks 1 week
X
1 Weeks
S
2 weeks
Y
2 Weeks U
Z 2 Weeks
1 Week
1 2 3 4 5 6 7
c. Gross Material Requirement Plan
Week Lead
Par
Description Time
t
1 2 3 4 5 6 7
S Required 100
Order release 100 2 weeks
T Required 100
Order release 100 1 weeks
U Required 200
Order release 200 2 weeks
V Required 100
Order release 100 2 weeks
W Required 200
Order release 200 3 weeks
X Required 100
Order release 100 1 weeks
Y Required 400
Order release 400 2 weeks
Z Required 600
Order release 600 1 weeks
d. Net Material Requirement Planning
Lead week
Low Item
time On Safety allocate 1 2 3 4 5 6 7
Lot Size level identi Description
(weeks hand stock d
code fication
)
Lot for 2 20 - - 0 S Gross Requirement 100
lot Scheduled receipts
Projected on hand 20 20 20 20 20 20 20 20
Not Requirement 80
Planned order receipts 80
Planned order releases 80