1 Primary 55292 Kg
2 AB 1516 Kg
3 Bracing 4204 Kg
4 Secondary 9131 Kg
Ratnesh Infra's Scope 5 Hardware 1116 Kg
6 Sheet 11085 Kg
Supply Not in Ratnesh Infra's 8 Flashings 3460 Kg
scope, Only Fixing 11 PC 37 Sq.m
12 Fans 6 Nos
90747
1 Primary 55292 Kg
2 AB 1516 Kg
Ratnesh 3 Bracing 4204 Kg Clit & Flange brace weight excluding.
Infra's 4 Secondary 9131 Kg
Scope
5 Hardware 1116 Kg
7 Deck Sheet 4900 Kg Deck sheet layout WIP so here mentioned tentative weight
Supply
Not in 6 Sheet Kg
Ratnesh 8 Flashings Kg
Infra's Sheeting layout WIP so here mentioned tentative weight
scope, 11 PC Sq.m
Only 12 Fans Nos
Fixing
76159
Sq.Feet 18 5
Sq. Meter 17 25
35 30
V1 V2 V3 V4 V5 V6 Insulation
12-Feb 23-Mar 31-Mar-19 2-Apr
134237 785880 1315535 1525150
9250 9750 14980
1520
6690 1980
1180