SCHEMATIC DIAGRAM FOR PLACING OF CONCRETE FOR MOCK-UP

BLOCK (2.0m x 2.0m x 2.0m)

Setting Out for Lean Concrete of Mock-up Block

Installation of formworks and anchorage for 5.0m x 5.0m x 0.10m Lean Concrete of
Mock-up block
Pouring of Lean Concrete for Mock-up Block

Installation of formworks for 2.0m x 2.0m x 2.0 m Mock-up Block that includes side
forms, tie rods, working platform, and prop supports. Also includes the placement
of thermocouple devices and wirings
Placing of Concrete for Mock-up Block using Tire Excavator

Compaction of Concrete for Mock-up Block in Layers (5 Layers) using concrete


stick vibrator. Also inscludes the monitoring of concrete temperature at interval of
15 minutes