You are on page 1of 28

S.

NO SERVICES
1 Architect and Engineering Consultancy
2 Civil Structure Design
A REVIT WORK
B AUTOCAD
C STAAD
D ARCHICAD
E TEKLA
F BRIDGE DESIGN
G INFRAWORKS
3 Electrical Design
4 Mechanical Design
5 HVAC and Plumbing Designing
6 Implementing Quality in Construction, Civil works and Factory.
7 Interior and Exterior Design
8 Construction Contractor helper in Infrastructure
9 Design and 3D Modeling

ENGINEERING DESIGN (Onshore / Offshore / Upstream / Midstream/


10 Downstream / Green Field / Brownfield Projects)

11 Survey for Land


12 Survey for Property
13 Topographical Survey
14 Contour Survey/Rail Survey
15 Hydrographical Survey/ Bathymetric Survey Signing 8000
16 QUANTITY Survey Signing Amount 5000
17 Drone Survey signing Amount 5000
18 Lidar Survey Signing Amount 5000
19 Drawings and Design for survey works
20 Drone Survey Photgraphy signing 5000
21 Lidar Aerial Survey signing amount
22 Social Survey signing 5000
23 GIS all types signing amount 5000
24 Special Formulated survey for market research or Data survey signing 5000
Supply of MANPOWER for Engineering or Construction site signing 4000 if
25
2nd Party then

We undertake leftover work, Restart works, Renovation work,Refurbishing


26 and more….. PROJECT CONSTRUCTION: Industy,Building, Infra, Roads,
Marine,Rail

27 Project Engineers experience to experince upto 5 years experience

28 Planning Engineers experience to experince upto 5 years experience


29 Piping Engineers experience to experince upto 5 years experience

30 Mechanical Engineers experience to experince upto 5 years experience

Civil / Structural Engineers experience to experince upto 5 years


31
experience

32 Electrical Engineers experience to experince upto 5 years experience

33 Instrumentation Engineers experience to experince upto 5 years


experience
Construction Coordinators experience to experince upto 5 years
34
experience
35 Construction Supervisors Technicians (All Disciplines)
36 Impact Assessment and Analytical studies
37 Techno-economic feasibility studies and potential surveys
38 Detailed project formulation

Conceptualization, design and implementation of developmental


39
programmers/ projects. Rural improvement

40 Capacity building and human resource development

Conduct Sectored studies and identification of potentials and perspective


41
plans

Mega Project Contract Documentation and Contract support INSPECTION


42 and Audit Supply of Manpower and Engineers along with detailed

43 work for Inspection services in EXPORT and IMPORT

ISO Quality Certificates Fault finding providing Resolution in Field of


44 Engineering, Industry and Energy. Oil, Food, Agricultural included. Rail,
Marine, Road, Hydropower, Nuclear Power.
45 QA/QC Engineers experience to experince upto 5 years experience
46 QA/QC Auditors (IRCA / ISO)
47 QA/QC Supervisors
48 Piping Inspectors (API 570)
49 Plant Inspectors (API 510)
50 Tank Inspectors (API 653)
Welding Inspectors (AWS / CSWIP) NDT Inspectors (UT / PT / MT /RT /
51 MFL / UFDT / Replica / IRIS / Creep Measurement / Thickness Gauge /
Hardness / Eddy Current etc) Painting .

52 Coating Inspectors E&I Inspectors In-Service Plant Inspectors Technicians

53 Detail Project Report Preparation


54 Safety Audits signing amount 5000
55 Energy Audit signing amount 5000
56 Construction Audit signing amount 5000
57 2nd Party HR Recruitment of Engineers,Architect ,Doctor,Nurses
58 Thermal inspection
59 Electrical Audit
60 Industrial Workshop design or STEEL STRUCTURE
61 CARPENTER
62 HELPER
63 PAINTER
64 PAINTER HELPER
65 Tank Inspectors (API 653)
66 TOTAL STATION SURVEY

INSTRUCTIONS:-
1 TRAVEL CHARGES AND GST ARE EXTRA.

2 FOR MATERIAL TEST TRUCK CHARGES is 15 KM.

3 FOR ANY OTHER WORK ROAD CHARGES are 9 per KM.

4 THE VALUE OF ORDER IS LESS THAN 50000 INR THEN FULL ADVANCE TO
BE GIVEN.

5 THE VALUE OF ORDER MORE THAN 50000 THEN 50% ADVANCE TO BE


GIVEN.

6 NO CASH PAYMENT ONLY BANK PAYMENT.


Unit Rate in INR
Per Sq. Ft. 15
Per Sq. Ft. 10
Per Sq. Ft. 20
Per Sq. Ft. 10
Per Sq. Ft. 10
Per Sq. Ft. 20
Per Sq. Ft. 25
Per Sq. Ft. 15
Per Sq. Ft. 30
Per Sq. Ft. 15
Per Sq. Ft. 15
Per Sq. Ft. 15
Signing amount 3000
Per Sq. Ft. 15
Signing amount 5000
Per Sq. Ft. 15

Per Sq. Ft. 20

Per 6 hours 6000


Per 6 hours 4000
Signing amount 5000
Signing amount 5000
Per 6 hours 20000
Per 6 hours 8000
Per 6 hours 20000
Per 6 hours 18000
Per Sq. Ft. 15
Per 6 hours 15000
Per 6 hours 25000
Per Person 2000
Per Km 7000
Per day 2500

2 Month Salary 30000

Signing 10000

2 Month Salary 20000

2 Month Salary 20000


2 Month Salary 20000

2 Month Salary 20000

2 Month Salary 20000

2 Month Salary 20000

2 Month Salary 20000

2 Month Salary 25000

2 Month Salary 20000


Signing amount 10000
Signing amount 10000
Signing amount 5000

Signing amount 5000

Signing amount 5000

Signing amount 5000

Signing Amount 10000

Per day 15000

Per day 6000

Per day 10000


Per day 5000
Per day 5000
Per day 5000
Per day 8000

Per day 8000

Per day 5000

Upto 50 pages 15000


Per day 20000
Per day 10000
Per day 10000
2 Month Salary
Per day 10000
Per day 10000
Per Sq. Ft. 20
Signing amount 1100
Signing amount 900
Signing amount 700
Signing amount 600
Signing amount 10000
Signing amount 10000
ITEM.NO SERVICES UNIT Rate in INR
5 HVAC and Plumbing Designing Per Sq. Ft. 15
4 Mechanical Design Per Sq. Ft. 15
44 Nuclear and power resolution & design Per day 6000
44(A) Industrial and energy resolution Per day 6000
44 (B) Oil and gas plant design Per day 6000
55 energy audit per day 10000
59 electrical audit per day 10000
60 Industrial workshop design Per Sq. Ft. 20
ITEM.NO SERVICES Unit
1 Architect and Engineering Consultancy Per Sq. Ft.
2 Civil Structure Design Per Sq. Ft.
3 Electrical Design Per Sq. Ft.
4 Mechanical Design Per Sq. Ft.
5 HVAC and Plumbing Designing Per Sq. Ft.
2(A) REVIT WORK Per Sq. Ft.
2 (B) AUTOCAD Per Sq. Ft.
2.(C ) STAAD Per Sq. Ft.
2.(D) ARCHICAD Per Sq. Ft.
2(E) TEKLA Per Sq. Ft.
2 (F) BRIDGE DESIGN Per Sq. Ft.
7 INTERIOR DESIGN Per Sq. Ft.
26 RENOVATION WORK SIGNING AMOUNT
ENGINEERING DESIGN (Onshore / Offshore / Upstream /
10 Midstream/ Downstream / Green Field / Brownfield Per Sq. Ft.
Projects)
26 REMODELLNG SIGNING AMOUNT
Rate in INR
15
10
15
15
15
20
10
10
20
25
15
15
5000

20

5000
ITEM.NO SERVICES Unit Rate in INR
9 Design and 3D Modeling Per Sq. Ft. 15
2(B) Autocad design Per Sq. Ft. 10
26 Remodeling SIGNING AMOUNT 5000
26 Renovation work SIGNING AMOUNT 5000
2(D) Archicad Per Sq. Ft. 20
1 Architect and Engineering Consultancy Per Sq. Ft. 15
7 Interior Design Per Sq. Ft. 15
ITEM.NO SERVICES
1 Survey for Land
2 Survey for Property
3 Topographical Survey
4 Contour Survey/Rail Survey/Road Survey/Mappig
5 Hydrographical Survey/ bathimetric survey
6 QUANTITY Survey/building/ construction
7 Drone Survey
8 Lidar Survey
9 Drawings and Design for survey works
10 Social Survey+ signing amount
11 GIS all types
2(B) AUTOCAD CIVIL+ signing amount
24 Special Formulated survey for market research or Data survey
Unit Rate in INR
Per day 8000
Per day 4000
Per day 7000
Per km 10000
Per day 70000
Per day 10000
Per day 21000
Per day 21000
Signinig Amount 7000
Perman 2000
Per km 8000
Per drawing 12000
Signinig Amount 5000
ITEM.NO
36
40
48
53

39

38

26

S.NO

(A)
1
2
3
4
5
6
7
8
9
10
11
12
13
(B)
1
2
3
4
5
6
(C )
1
(D)
1
2
3
(E)

(F)
1
(a)
(b)
(c )
(d)
(e)
(G)
1

(H)
(a)
(b)
(c )
(d)
(I)
1
2
3

(a)
(b)
5
6
7
8
9
(a)
(b)
(c )
(d)
(e)
10
11
12

13

14
15
16
17
18
19
20
21
(J)

(K)

(L)
1
2
3
4
SERVICES
Impact Assessment and Analytical studies
Capacity building and human resource development
Piping Inspection
Detail Project Report Preparation
Conceptualization, design and implementation of developmental
programmers/ projects. Rural improvement
Detailed project formulation
From start to as per need. We undertake leftover work, Restart works,
Renovation work,Refurbishing and more….. PROJECT CONSTRUCTION:
Industy,Building, Infra, Roads, Marine,Rail

NAME OF TEST

COARSE AGGREGATE
Seive Analysis and Fineness Modulus
Material Finer than 75 micron
Flakiness and Elongation Index
Specific Gravily
Water Absorption
Bulk Density
Aggregate Crushing Value
Abrasion Value
Aggregate Impact Value
Soundness (Loss with Na2SO4 or MgSO4)
Aggregate 10% Fine Value
Deleterious material
Organic impurities
FINE AGGREGATE
Seive Analysis and Fineness Modulus
Material Finer than 75 micron
Organic impurities
Natural Moisture Content
Specific Gravily
Soundness (Loss with Na2SO4 or MgSO4)
CEMENT CONCRETE
Compression Test (Sample received in the form of cube)
PAVER BLOCK
Compression Test (Sample received in the form of & Paver block/Tiles)
Flexural Strength
Abrasion Resistance
CONCRETE MIX PROPORTIONING

PORTLAND/POZZOLONA CEMENT
PHYSICAL TEST
Consistency
Fineness by Blain
Soundness Expansion
Setting time
Compressive Strength
WATER
Suitablity of water for Concrete/mortar (PH value,Harmful salts and physical
Test)
BRICKS(A SET OF 7 BRICKS)
Examination of size and general quality including warpage
Compressive Strength
Water absorption
Efforescence
SOILS
Sieve Analysis
Liquid Limit,Plastic Limit &Plasticity Index
Particle Size Analysis (by Sedimention)

Optimum Moisture Content and Maximum Dry Density by Proctor Test Method

Light
Modified
Moisture Content
Specific Gravity
Shrinkage Factors
Silt Factor
Harmful Salts
Total Soluble Salts
Sulphite Content
Corbonate Content
Biacabonate
Chloride
PH Value
Organic matter
total cabonate
Direct Shear Test for Determination of cohension & angle of internal friction (c
& Φ)

Triaxia Test for Determination of cohension & angle of internal friction(c&Φ)


Unconfined Compressive Strength
Swelling Pressure
Differential Free Swell Index
Consolidation Test
Original Dry density from undistrurbed sample to be supplied by party
Callifornia Bearing Ratio (CBR) with Classification and MDD
Permeability test
TEST ON EXISTING ROAD FOR STREGTHENING
Bankeiman Beam Deflection Test for srengthrning of road per kilometer / Lane.

When loaded truck is provided by the party

when loaded truck is arranged by us.


(Additional Rs. 5000.00 shall be charged for first 5 KM and further RS. 500.00
per KM .for sixth km and onwards survey)
COMPLETE SUB-SOIL INVESTIGATION FOR FOUNDATION
0-10 meter
0-20 meter
0-30 meter
0-40 meter
JOB MIX FORMULA
Granular Sub-Base (GSB)
Wet Mix Macadam(WMM)
Water Bound Macadam(WBM)
Blanketing Material
Unit Rate in INR
SIGNING AMOUNT 10000
SIGNING AMOUNT 5000
Per day 5000
UPTO 50 PAGES 15000

SIGNING AMOUNT 5000

SIGNING AMOUNT 5000

10000
SIGNING AMOUNT

MIN.QTY.REQUIRED IS CODE NO. RATE/TEST(Rs.)

30 Kg 2386 (part I) : 1963 1000


20 Kg 2386 (part I):1963 600
50 Kg 2386 (Part I):1963 2400
10 Kg 2386 (part III): 1963 600
10 Kg 2386 (part III): 1963 600
50 Kg 2386 (part III): 1963 500
50 Kg 2386 (part IV):1963 1600
20 Kg 2386 (part IV):1963 2400
20 Kg 2386 (part IV):1963 800
20 Kg 2386 (part V):1963 3000
20 Kg 2386 (part IV):1963 1400
1 Kg 2386 (part II):1963 1300
1 Kg 2386 (part II):1963 1300

5 Kg 2386 (part I):1963 1000


2 Kg 2386 (part I):1963 500
2 Kg 2386 (part II):1963 400
5 Kg 2386 (part III):1963 700
1 Kg 2386 (part III):1963 3000
20 Kg 2386 (part V):1963

3 Nos(mimimum) 516: 1959 1200

3 Nos(mimimum) 5658: 2006 1200


1 Nos(mimimum) 15658: 2006 1200
1 Nos(mimimum) 15658: 2006 1200
Cement-100 Kg 10262: 2009 24000
Coarse Sand-200Kg
Coarse Agg.-400 Kg

15 Kg for all tests a,b,c,d,& e 5000


4031(part4):1996 500
4031(part2):1988 1200
4031(part3):1988 1200
4031(part5):1988 400
4031(part6):1988 1700

2.00 litre 3025:1964 3000

For all test a,b, c, & d 4000


20 bricks 3495(PartIV):1992 700
3495(part I): 1992 1500
3495(Part II):1992 800
3495(part III):1992 1000

1.0 Kg 2720 (Part) : 1983 600


1.0 Kg 2720 (Part V):1983 800
2.0 Kg 2720(Part IV):1983 900

20.0 Kg 2720 (Part VII): 1980 2000


20.0Kg 2720 (part VIII): 1983 2800
0.500 Kg 2720 (part I):1973 400
0.500Kg 2720 (part III):1980 600
0.500Kg 2720 (part VI):1972 800
2.0Kg 1400

1.0 Kg 2720 (part XXVI) : 1977 600


1.0 Kg
1.0 Kg
2720 (part XXVII):1977 2000
1.0 Kg
1.0 Kg
1.0 Kg 2720 (part XXVI) :1987 400
1.0 Kg 2720 (part XXVI) : 1972 600
1.0 Kg 2720 (part XXVI) : 1987 400

2720 (part XIII):1986 1300

2720 (part XI): 1973 1600

AS REQUIRED
AS REQUIRED 2720 (part X): 1973 900
2720 (partXXXXI):1977 1400
2720 (partXXXXI):1977 600
2720 (part XV): 1986 1800
2720 (part XVI); 1986 400
20 kg 2720 (part XVI); 1986 4000
10 kg 2720 (part XVII): 1986 4000

IRC:81:1997 3500.00 per kilometer

1000
1200
1400
2000

50 Kg each of every ingredient MORTH Section 400 24000


50 Kg each of every ingredient MORTH Section 400 24000
50 Kg each of every ingredient MORTH Section 400 24000
20 Kg each of every ingredient GE: IRS-2 (FINAL) 24000
ITEM.NO SERVICES
52 Coating Inspectors E&I Inspectors In-Service Plant Inspectors Technicians
53 Detail Project Report Preparation
ISO Quality Certificates Fault finding providing Resolution in Field of Engineering,
44 Industry and Energy. Oil, Food, Agricultural included. Rail, Marine, Road,
Hydropower, Nuclear Power.
27 Project Engineers
28 Planning Engineers
29 Piping Engineers
30 Mechanical Engineers
31 Civil / Structural Engineers
32 Electrical Engineers
33 Instrumentation Engineers
34 Construction Coordinators
35 Construction Supervisors Technicians (All Disciplines)
Unit Rate in INR
Per day 5000
UPTO 50 PAGES 15000

Per day 6000

2 month salary 20000


2 month salary 20000
2 month salary 20000
2 month salary 20000
2 month salary 20000
2 month salary 20000
2 month salary 20000
2 month salary 20000
2 month salary 20000
ITEM .NO
61
62
63
64
65
66

25

45
46
47
48
49
50

51

52
57

42

8
SERVICES Unit
CARPENTER Per day
HELPER Per day
PAINTER Per day
PAINTER HELPER Per day
Tank Inspectors (API 653) 2 months SALARY
TOTAL STATION SURVEY Per day

Supply of MANPOWER for Survey and Surveyor as needed only 2ndParty HR or


Contract HiresPROJECT ENGINEERINGSupply of Manpower andImplementation of the Signinig Amount
project.

QA/QC Engineers 2 months SALARY


QA/QC Auditors (IRCA / ISO) 2 months SALARY
QA/QC Supervisors 2 months SALARY
Piping Inspectors (API 570) 2 months SALARY
Plant Inspectors (API 510) 2 months SALARY
Tank Inspectors (API 653) 2 months SALARY
Welding Inspectors (AWS / CSWIP) NDT Inspectors (UT / PT / MT /RT / MFL / UFDT /
Replica / IRIS / Creep Measurement / Thickness Gauge / Hardness / Eddy Current etc) 2 months SALARY
Painting .
Coating Inspectors E&I Inspectors In-Service Plant Inspectors Technicians 2 months SALARY
2nd Party HR Recruitment of Engineers,Architect ,Doctor,Nurses 2 months SALARY
Mega Project Contract Documentation and Contract support INSPECTION and Audit
Signing Amount
Supply of Manpower and Engineers along with detailed
Construction Contractor helper in Infrastructure Signing Amount
Rate in INR
1100
900
700
600

10000

5000

5000
5000
5000
5000
8000

8000

5000

10000

5000
ITEM.NO SERVICES
58 Thermal inspection
59 electrial inspection
54 Safety Audits
55 Energy Audit
56 Construction Audit
46 QA/QC Auditors (IRCA / ISO)
6 Implementing Quality in Construction, Civil works and Factory.
36 Impact Assessment and Analytical studies
37 Techno-economic feasibility studies and potential surveys
40 Capacity building and human resource development
Conduct Sectored studies and identification of potentials and perspective
41
plans
Unit Rate in INR
Per day 10000
Per day 10000
Per day 20000
Per day 10000
Per day 10000
Per day 5000
Signing amount 3000
Signing amount 10000
Signing amount 10000
Signing amount 5000

Signing amount 5000

You might also like