= 119.786 mm
Adopt, D = 130 mm
10
Thus, d = 130 - 15 - = 110 mm
2
From above calculations, we get,
We knVMow,
We know,
Effective depth (d)= S,.DWLto
i. Slab panel A4-B4-B5-A5
Shorter span = 6.2484 m
Taking,
d =DWLD
=
= 148.77 mm
Overall depth of slab Q
‘’RMMK
10
KER(D) = 148.77 +15+
2
= 168.7714 mm >150mm
Hence, secondary beam is required in this panel.
Providing secondary beam along alphabetic grid.
Now,
Shorter span = 3.1242 mm
Thus,
d=
= 74.38 mm
10
Overall depth of slab (D) = 74.38+15+
2
= 94.38 mm
Adopt, D = 100mm
10
Thus, d = 100 - 15 - = 80 mm
2
ii. Slab panel B2-C2-C3-B3
Shorter span WQWEJEJD= 2.057 m
Thus,
d=
= 48.976 mm
10
Overall depth of slab (D) = 48.976 +15+
2
= 68.976 mm
Adopt, D = 100mm
10
Thus, d = 100,SS - 15 - = 80 mm
2
Area Calculation
i. Area of slab
Main slab, Asm = 402.202 m2
Cantilever slab, Asc = 40.192 m2
ii. Area of beam
a. Along alphabetic grid
Major Beam
AaB= 16*6.553*0.380
= 39.842 m2
Secondary Beam
No secondary beam.
b. Along numeric grid
Major Beam
AnB = (4*6.248+ 4*6.401 + 8* 4.191 + 2*3.505) *0.380
= 34.631 m2
Secondary Beam
Anb = (3*6.248 + 2*6.401) *0.20
= 6.309 m2
iii. Area of column
Aco = 23*0.5*0.5 = 5.750 m2
iv. Area of outer wall
Prefab wall, Afw = Total Length*Thickness
= (3*5.944 + 2*5.639 + 1*5.791 + 3*3.581) *0.075
= 3.423 m2
Area after 30% Deduction for openings,
Apw = 2.396 m2
Shear wall, Asw = Total Length*Thickness
= (1*3.581 + 3*5.944 + 1*3.023) *0.230
= 5.620 m2
Area after 30% Deduction of for openings,
Asw = 3.934m2
Load Calculation
i. Load due to partition wall = load intensity * slab area
= 0.44 * 402.202
= 176.968 KN
Unit
S. Area Height Volume Load
Element weight
N. (m2) (m) (m3) (KN)
(KN/m3)
1314.34
Main 402.202 0.13 52.286 25 3
1 Slab Cantilever 40.192 0.13 5.225 25 173.673
Beam 25
Major 39.842 0.575 22.909 25 572.729
Alphabetic grid Secondary - - 0 25 0
Major 36.453 0.575 19.913 25 497.821
2 Numeric grid Secondary 6.309 0.375 2.366 25 59.147
3 Column 5.75 3.223 18.532 25 463.306
Prefab 2.396 2.778 6.656 8.75 58.241
4 Outer wall Shear 3.93 2.778 10.918 25 272.939
5 Partition wall 8.75 176.968
6 Floor finishing 402.202
7 Staircase 535.946
8 Lift
121.944
4855.03
Total 4
Table III.2.5: Dead Load Calculation of Ground Floor